Draft CNECCTS AOI-2026-004 _PEDS.pdf

PDF 135 KB Posted

Attached to
Communications, Network, Engineering, Cybersecurity, and Information Technology Services (CNECTS), aka "Connects"
Solicitation number
FA251827RCNECTS
Issued by

About this file

This is a draft Announcement of Opportunity (AOI) for Plans & Programs Engineering Design Support (PEDS), a 100% Total 8(a) Small Business set-aside. The solicitation seeks innovative solutions to modernize the communications system design and engineering process, which is currently manual, document-centric, and time-consuming. The AOI is aligned with the CNECTS initiative to break down operational silos and establish a proactive, resilient, and secure digital foundation through modern, data-driven, and automated approaches to IT service delivery and engineering.

Offerors must propose solutions addressing three Technical Focus Areas (TFAs): (1) Model-Based Systems Engineering (MBSE) Platform—implementing a centralized MDSE platform to replace static drawings with a dynamic, authoritative source of truth enabling real-time collaboration and automated verification; (2) Automated Design and Integration Analysis—developing automated tools within the MBSE environment to analyze designs for compliance with DOD/USSF architectures, cybersecurity standards (RMF), and spectrum allocation, with automatic flagging of integration conflicts; and (3) Agile Requirements Management—introducing an agile, user-centric digital platform for defining and managing customer requirements with full traceability from initial user need through final design implementation and testing. Phase I submissions must be Unclassified, with subsequent phases potentially requiring higher classification levels. Specific submission instructions and evaluation criteria are referenced in Attachments 1–2 and Attachment 6. The Government reserves the right to fund all, some, or none of the proposed solutions, in whole or in part, subject to fund availability. Close date, evaluation date, and Contracting Officer are listed as "TBD."

View the file

Other files

File Type Posted
Tentative Schedule_15 Oct 2026_table.pdf PDF
CNECTS _Questions_Answers_ 15 Oct 26.pdf PDF
CNECTS CSO Final Draft v1.0.docx DOCX document
CNECTS Teaming-Partnering Interest Spreadsheet v3.xlsx XLSX spreadsheet
CNECTS Teaming-Partnering Interest Spreadsheet v2.xlsx XLSX spreadsheet
Virtual Industry Day Slides_19 Aug 26.pdf PDF
CNECTS Teaming -Partnering Interest Spreadsheet.xlsx XLSX spreadsheet
CNECTS Virtual Industry Day Presentation 19 Aug 26.pptx PPTX presentation
SAIO CNECTS Virtual Industry Day_Transcript.docx DOCX document
PEDS PWS_22 Apr 22 Final_Posting Ready.docx DOCX document
CNECTS _Questions_Answers_ 01 May 2026.pdf PDF
WBS Matrix_updated 3-26-2026.xlsx XLSX spreadsheet
Consolidation D-F CNECTS_Finalized_Redacted.pdf PDF
Draft CNECCTS AOI-2026-003 _WICS II.pdf PDF
Welcome to CNECTS Industry Day Slides v2.pdf PDF
CNECTS CSO Draft_3-27-2026.pdf PDF
4. PEDS PWS_22 Apr 22 Final.docx DOCX document
Draft CNECCTS AOI-2026-002 _NISSC.pdf PDF
Draft CNECCTS AOI-2026-001 _BOS-IT.pdf PDF
RFI 2 Commerciality_ BIM_ CMMC.pdf PDF
CNECTS RFI 3 - INDUSTRY DAY NOTICE.pdf PDF
4. RFI- Commerciality_ BIM_ CMMC_ DRAFT.docx DOCX document
6. Requirements Matrix for RFI 2.xlsx XLSX spreadsheet
5. CNECTS Requirements and Legacy Contract Differences.docx DOCX document
1. BOS-IT PWS - 7 Oct 24 (2).docx DOCX document
1a. Giant Voice PWS - 5 Feb 25.docx DOCX document
3. WICS II PWS (21 CS rqts only) - 31 Jul 25.docx DOCX document
1. BOS-IT PWS - 7 Oct 24.docx DOCX document
0. CNECTS RFI #1, Consolidation - 31 Jul 25.docx DOCX document
4. PEDS PWS - 22 Apr 22.docx DOCX document
2. Cheyenne Mountain SFS 21 CS Communications Contract - 31 Jul 25.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT AOI-2026-004_PEDS

AOI Title: Plans & Programs Engineering Design Support (PEDS) Set-Aside: Total 8(a) Small Business – 100% Close Date: TBD Evaluation of White Papers: TBD

AOI CO: TBD

This AOI aligns with the consolidation effort, under the CNECTS initiative, that aims to break down operational silos, drive significant efficiencies, and establish a proactive, resilient, and secure digital foundation. We are seeking partners who can move beyond legacy management paradigms and introduce modern, data-driven, and automated approaches to IT service delivery, engineering, and mission support:

Background

The current communications system design and engineering process is manual, document-centric, and time-consuming. It relies on static drawings and sequential stakeholder reviews, leading to lengthy project timelines and a high risk of integration errors when deploying new capabilities.

Technical Focus Areas (TFAs)

Offerors must propose solutions aligned with each of the TFAs. All submissions should emphasize the technical aspects of their approach, with deliverables expected to provide production-ready systems, but may include prototypes, models, and/or experimental frameworks.

TFA 1: Model-Based Systems Engineering (MBSE) Platform:

Desired Capabilities:

• Implement a centralized MDSE platform for designing and documenting all communication system architecture. This platform should replace static drawings with a dynamic, authoritative source of truth that allows for real-time collaboration and automated verification of requirements against designs.

TFA 2: Automated Design and Integration Analysis:

Desired Capabilities:

• Develop automated tools within the MBSE environment to analyze proposed designs for compliance with DOD/USSF architectures, cybersecurity standards (RMF), and spectrum allocation. The tool should automatically flag integration conflicts before implementation.

TFA 3: Agile Requirements Management:

Desired Capabilities:

• Introduce an agile, user-centric process for defining and managing customer requirements. This should leverage a digital platform that provides traceability from initial user need to final design implementation and testing.

Performance & Integration Considerations Solutions must demonstrate a superior and innovative approach to enterprise IT management beyond standard industry practices. All TFAs are mission-critical focused; the Government seeks to assess feasibility, validate technical approaches, and inform transition paths for future IT capabilities.

Security Requirements Phase I submissions shall be Unclassified. Subsequent phases may require submission and/or performance at higher classification levels, as specified in the AOI and any draft or final DD Form 254.

Submission Instructions & Evaluation Per Attachments 1–2 (submission) and Attachment 6 (evaluation).

Funding Statement The Government may fund all, some, or none of the proposed solutions, in whole or in part, subject to availability of funds.

File details come from the government source that posted it. Updated .