This is a draft AOI (Announcement of Opportunity) for Base Operating Support-Information Technology (BOS-IT), a 100% 8(a) Small Business set-aside opportunity. The AOI aligns with the CNECTS initiative to consolidate IT operations, eliminate operational silos, and modernize service delivery through data-driven and automated approaches. Current BOS-IT support is characterized as reactive, labor-intensive, and fragmented, with high sustainment costs stemming from management of disparate legacy systems including copper cabling and analog voice systems alongside modern networks.

The solicitation requires offerors to propose solutions addressing three Technical Focus Areas (TFAs). TFA 1 requires an AIOps (Artificial Intelligence for IT Operations) platform that ingests data from NIPR/SIPR networks, endpoints, and infrastructure to predict failures, automate root cause analysis, and recommend preventative actions. TFA 2 requires a Unified Communications as a Service (UCaaS) platform consolidating legacy telephony, Land Mobile Radio (LMR), and Giant Voice systems into a secure, IP-based solution integrating voice and messaging across the installation. TFA 3 requires creation of a dynamic digital twin of the base's physical plant infrastructure (fiber optic, copper, antennas) for capacity planning, outage simulation, and optimizing installation pathways. Submissions should emphasize technical aspects and deliver production-ready systems, though prototypes and experimental frameworks are acceptable. Phase I submissions must be Unclassified; subsequent phases may require higher classification levels. The Government may fund all, some, or none of the proposed solutions in whole or in part, subject to funding availability. Key dates including close date, white paper evaluation date, and AOI Contracting Officer identification are listed as TBD.

View the file

Other files

File Type Posted
Tentative Schedule_15 Oct 2026_table.pdf PDF
CNECTS _Questions_Answers_ 15 Oct 26.pdf PDF
CNECTS CSO Final Draft v1.0.docx DOCX document
CNECTS Teaming-Partnering Interest Spreadsheet v3.xlsx XLSX spreadsheet
CNECTS Teaming-Partnering Interest Spreadsheet v2.xlsx XLSX spreadsheet
Virtual Industry Day Slides_19 Aug 26.pdf PDF
CNECTS Teaming -Partnering Interest Spreadsheet.xlsx XLSX spreadsheet
CNECTS Virtual Industry Day Presentation 19 Aug 26.pptx PPTX presentation
SAIO CNECTS Virtual Industry Day_Transcript.docx DOCX document
PEDS PWS_22 Apr 22 Final_Posting Ready.docx DOCX document
CNECTS _Questions_Answers_ 01 May 2026.pdf PDF
WBS Matrix_updated 3-26-2026.xlsx XLSX spreadsheet
Consolidation D-F CNECTS_Finalized_Redacted.pdf PDF
Draft CNECCTS AOI-2026-004 _PEDS.pdf PDF
Draft CNECCTS AOI-2026-003 _WICS II.pdf PDF
4. PEDS PWS_22 Apr 22 Final.docx DOCX document
Draft CNECCTS AOI-2026-002 _NISSC.pdf PDF
Welcome to CNECTS Industry Day Slides v2.pdf PDF
CNECTS CSO Draft_3-27-2026.pdf PDF
RFI 2 Commerciality_ BIM_ CMMC.pdf PDF
CNECTS RFI 3 - INDUSTRY DAY NOTICE.pdf PDF
4. RFI- Commerciality_ BIM_ CMMC_ DRAFT.docx DOCX document
6. Requirements Matrix for RFI 2.xlsx XLSX spreadsheet
5. CNECTS Requirements and Legacy Contract Differences.docx DOCX document
1. BOS-IT PWS - 7 Oct 24 (2).docx DOCX document
1a. Giant Voice PWS - 5 Feb 25.docx DOCX document
3. WICS II PWS (21 CS rqts only) - 31 Jul 25.docx DOCX document
1. BOS-IT PWS - 7 Oct 24.docx DOCX document
2. Cheyenne Mountain SFS 21 CS Communications Contract - 31 Jul 25.docx DOCX document
0. CNECTS RFI #1, Consolidation - 31 Jul 25.docx DOCX document
4. PEDS PWS - 22 Apr 22.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT AOI-2026-001_BOS-IT

AOI Title: Base Operating Support-Information Technology (BOS-IT) Set-Aside: Total 8(a) Small Business – 100% Close Date: TBD Evaluation of White Papers: TBD

AOI CO: TBD

This AOI aligns with the consolidation effort, under the CNECTS initiative, that aims to break down operational silos, drive significant efficiencies, and establish a proactive, resilient, and secure digital foundation. We are seeking partners who can move beyond legacy management paradigms and introduce modern, data-driven, and automated approaches to IT service delivery, engineering, and mission support:

Background

The current BOS-IT support is reactive, labor-intensive, and fragmented. Managing disparate legacy systems (copper cabling, analog voice) alongside modern networks creates high sustainment costs and slow response times. The current model lacks the proactive, predictive capabilities needed to ensure mission resilience against advanced cyber threats and dynamic operational tempos.

Technical Focus Areas (TFAs)

Offerors must propose solutions aligned with each of the TFAs. All submissions should emphasize the technical aspects of their approach, with deliverables expected to provide production-ready systems, but may include prototypes, models, and/or experimental frameworks.

TFA 1: AIOps for Predictive Network Operations:

Desired Capabilities:

• Implement Artificial Intelligence for IT Operations (AIOps) platform that ingests data from NIPR/SIPR networks, endpoints, and infrastructure to predict failures, automate root cause analysis, and recommend preventative actions before outages occur.

TFA 2: Unified Communications as a Service (UCaaS):

Desired Capabilities:

• Propose s unified platform to consolidate legacy telephony, Land Mobile Radio (LMR), and Giant Voice systems into a secure, IP-based solution that integrates voice, and messaging for seamless communication across the installation.

TFA 3: Digital Twin for Infrastructure Management:

Desired Capabilities:

• Create a dynamic digital twin of the base’s physical plant infrastructure (fiber optic, copper, antennas). This model should be used for capacity planning, outage simulation, and optimizing new installation pathways.

Performance & Integration Considerations

Solutions must demonstrate a superior and innovative approach to enterprise IT management beyond standard industry practices. All TFAs are mission-critical focused; the Government seeks to assess feasibility, validate technical approaches, and inform transition paths for future IT capabilities.

Security Requirements Phase I submissions shall be Unclassified. Subsequent phases may require submission and/or performance at higher classification levels, as specified in the AOI and any draft or final DD Form 254.

Submission Instructions & Evaluation Per Attachments 1–2 (submission) and Attachment 6 (evaluation).

Funding Statement The Government may fund all, some, or none of the proposed solutions, in whole or in part, subject to availability of funds.