About this file

TRD_F6 Operational Ground Test Facility

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program), newest first.
File Type Posted
Section_J_Attachment_3_WD_05-3033_Rev_16_Okaloosa_County _FL.pdf PDF
Section_J_Attachment_10_E-OMS_WPAFB_GFP.xlsx XLSX spreadsheet
Section_M.pdf PDF
Section_L_Attachment_8_TEP_6_Jul.xlsx XLSX spreadsheet
Section_L_Attachment_7_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Section_L.pdf PDF
Combined_Industry_DRAFT_RFP_CRM.xlsx XLSX spreadsheet
Comment_Resolution_Matrix.xlsx XLSX spreadsheet
2015_E-OMS_CDRLs_10_Jun_2015.pdf PDF
NRTF_Mission_Info.pdf PDF
E-OMS_Mission_Vision_HLO's.pdf PDF
Draft_Contract.pdf PDF
Section_J_Attachment_3_WD_05-3033_Rev_15_Okaloosa_County _FL.pdf PDF
Section_J_Attachment_7_DD254_Contract_Security_Classification_Specification.pdf PDF
Section_L_Attachment_9_TEP_3.20.15.xlsx XLSX spreadsheet
Comment_Resolution_Matrix.xlsx XLSX spreadsheet
Section_L_Attachment_1_Government_Staffing_Estimate_3.20.15.xlsx XLSX spreadsheet
Draft_Section_L_3.20.15.pdf PDF
E-OMS_Draft_Comments_MFR.pdf PDF
E-OMS_Draft_RFP_Questions_Answers.pdf PDF
NRTF_Industry_Day_Tour_Scripts.pdf PDF
Resources.pdf PDF
Regulations_List.pdf PDF
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Section_J_Attachment_9_Key_Personnel_Labor_Category_Descriptions.pdf PDF
Section_J_Attachment_2_DOL_WD_05-2122_Rev_16_Walton_County _FL.docx DOCX document
FBO_Schedule_Update__2.pdf PDF
OM_DTF_Description_17_Apr_14_TAIP_-_updated.pdf PDF
C-52_Script_TAIP_-_updated.pdf PDF
TRD_C10.pdf PDF
TRD_B2B.pdf PDF
TRD_D1.pdf PDF
TRD_F4.pdf PDF
TRD_D4.pdf PDF
TRD_C2.pdf PDF
TRD_B9A.pdf PDF
TRD_C9.pdf PDF
TRD_F2D.pdf PDF
TRD_A3.pdf PDF
TRD_F2A.pdf PDF
TRD_A2.pdf PDF
TRD_B2A.pdf PDF
TRD_B13.pdf PDF
TRD_D2.pdf PDF
TRD_C1.pdf PDF
TRD_C5.pdf PDF
E-OMS_Industry_Day_Announcement.pdf PDF
TAB_62_-_Attachment_02_-_PWS__Rev_I__10_Jan_2014.pdf PDF
Attachment_3_Rev_I.pdf PDF
Name_Change_FBO_MFR.pdf PDF
Show all 50

Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev E

FA9200-05-C-0001, P00057

Attachment 3

Page F6-1

APPENDIX F6

OPERATIONAL GROUND TEST (OGT) FACILITY

1.0 PURPOSE

2.0

. The primary purpose of the OGT Facility is to conduct ground tests on live precision guided weapons in a simulated operational environment. The test may include temperature and vibration conditioning, seeker guidance HITL, and engine run either individually, simultaneously, or sequentially to determine the weapon’s operational readiness and reliability.

2.1. The OGT Facility is located on TA C-80A, approximately 21 miles northeast of Eglin main base, reached via SRs 20 and 285 and RRs 200 and 201. TA C-80A is approved for testing munitions up to 2,000 pounds NEW.

GENERAL.

2.2. The total-fragment-recovery system (appendix F5) is also located on TA C-80A. It is used infrequently.

3.0

3.1. The Contractor shall operate and maintain the OGT Facility and associated systems and equipment as part of the seven simultaneous operations as specified in PWS paragraph 1.7, including:

CAPABILITIES.

3.1.1. An electromechanical vibration system, including:

1. Vibration unit.

2. Vibration controller.

3. Accelerometers of various types and styles.

4. Vibration test stands, including stingers, fixtures, and miscellaneous items.

3.1.2. Temperature conditioning system, including:

1. Temperature conditioning unit.

2. Insulated ducting.

3. Insulated conditioning chamber.

3.1.3. A cleared space approximately 800 feet by 2000 feet.

3.1.4. A 40-foot by 60-foot test chamber (9460).

3.1.5. A hardened control building (9462).

3.1.6. An underground bunker (9463).

3.1.7. A vehicle shelter (9464).

3.1.8. General test support and data equipment, including:

1. Programmable sequencer/controller unit.

2. Three bay control console including site PA system, radios, fiber optic link, etc.

3. CCTV system including cameras, monitors and display control switcher.

Rev E

FA9200-05-C-0001, P00057

Attachment 3

Page F6-2

4. Low voltage firing system.

5. Aero Plank system.

6. Portable hydraulic power system, including pump, ram, and force link to be utilized for calibrating engine run stands.

7. Engine run stands and miscellaneous items.

8. Various mobile and fixed radios.

9. Electric Field Mill (lightning warning) system.

10. GPS timing system.

3.1.9. Total-fragment-recovery system, including:

1. Two 20-foot-diameter steel water tanks. (E-182)

2. Electric crane.

3. Manual winches.

4. Fragment recovery devices.

3.2. The Contractor shall operate and maintain the OGT Simulation System (appendix D1) IAW tasks and test directives.

3.3. The Contractor shall set up and conduct OGT tests IAW tasks and test directives.

APPENDIX F6
1.0 UPURPOSEU. The primary purpose of the OGT Facility is to conduct ground tests on live precision guided weapons in a simulated operational environment. The test may include temperature and vibration conditioning, seeker guidance HITL, and engine run e
2.0 UGENERAL.
2.1. The OGT Facility is located on TA C-80A, approximately 21 miles northeast of Eglin main base, reached via SRs 20 and 285 and RRs 200 and 201. TA C-80A is approved for testing munitions up to 2,000 pounds NEW.
2.2. The total-fragment-recovery system (appendix F5) is also located on TA C-80A. It is used infrequently.
3.0 UCAPABILITIES.
3.1. The Contractor shall operate and maintain the OGT Facility and associated systems and equipment as part of the seven simultaneous operations as specified in PWS paragraph 1.7, including:
3.1.1. An electromechanical vibration system, including:
1. Vibration unit.
2. Vibration controller.
3. Accelerometers of various types and styles.
4. Vibration test stands, including stingers, fixtures, and miscellaneous items.
3.1.2. Temperature conditioning system, including:
1. Temperature conditioning unit.
2. Insulated ducting.
3. Insulated conditioning chamber.
3.1.3. A cleared space approximately 800 feet by 2000 feet.
3.1.4. A 40-foot by 60-foot test chamber (9460).
3.1.5. A hardened control building (9462).
3.1.6. An underground bunker (9463).
3.1.7. A vehicle shelter (9464).
3.1.8. General test support and data equipment, including:
1. Programmable sequencer/controller unit.
2. Three bay control console including site PA system, radios, fiber optic link, etc.
3. CCTV system including cameras, monitors and display control switcher.
4. Low voltage firing system.
5. Aero Plank system.
6. Portable hydraulic power system, including pump, ram, and force link to be utilized for calibrating engine run stands.
7. Engine run stands and miscellaneous items.
8. Various mobile and fixed radios.
9. Electric Field Mill (lightning warning) system.
10. GPS timing system.
3.1.9. Total-fragment-recovery system, including:
1. Two 20-foot-diameter steel water tanks. (E-182)
2. Electric crane.
3. Manual winches.
4. Fragment recovery devices.
3.2. The Contractor shall operate and maintain the OGT Simulation System (appendix D1) IAW tasks and test directives.
3.3. The Contractor shall set up and conduct OGT tests IAW tasks and test directives.