Attachment 7.d RMWT LEO GEPs Price Template Amend 1.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
Solicitation number
FA240126R0003
Issued by

About this file

This is a pricing template for the Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs) contract under solicitation FA240126R0003, issued by the Space Development Agency (SDA) of the Department of the Air Force. The template, amended November 19, 2026, establishes the structure for offeror pricing submissions across multiple geographical locations (Otis, Fairchild, and Grand Forks) and contract periods. The base Indefinite Delivery/Indefinite Quantity (IDIQ) contract runs from March 31, 2027 to September 30, 2031, with an additional option period from October 1, 2031 to September 30, 2035. Task Order 1 pricing covers individual site implementation from March 31, 2027 through September 30, 2031 with four option years.

Pricing requirements include Firm-Fixed-Price (FFP) labor CLINs for Labor Development and Integration (CLIN 0001/2001-5001), Labor Maintenance (CLIN 0002/2002-5002), and Civil Engineering (CLIN 0003/2003-5003), plus Material CLINs (0004/2004-5004) on an FFP basis. Cost Reimbursable (CR) Other Direct Costs (ODCs) and Travel are Not-to-Exceed with fixed ceilings: base ODCs of $1,500,000 and option ODCs of $500,000 for the IDIQ, and base ODCs of $300,000 with varying option amounts ($25,000-$15,000) for Task Order 1 at each location. Offerors must provide separate unit costs for CONUS and OCONUS deployments and are required to price material line items including concrete pads, equipment shelters, trenching, power systems, RF antennas, optical terminals, security systems, and trade labor on a unit-quantity-of-one basis. The government will evaluate pricing using an undisclosed shielded Total Evaluated Price (TEP) model with proprietary weighting factors. Offerors must certify pricing completeness, eliminate cost duplication across pricing locations, and document all assumptions and geographic bounding conditions in the template.

View the file

Other files

File Type Posted
Attachment 5.b - RMWT LEO GEPs Model Task Order 01 - FA2401XXF000X Amend 2.pdf PDF
Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base Amend 2.xlsx XLSX spreadsheet
RMWT LEO GEPs Cover Letter_RFP_24Nov26_signed.pdf PDF
Attachment 7.c.1 RMWT LEO GEPs Unpriced BOE Template TO 01 Amend 2.xlsx XLSX spreadsheet
Attachment 5.b - RMWT LEO GEPs Model Task Order 01 - FA2401XXF000X Amend 1.pdf PDF
Attachment 5.a - RMWT LEO GEPs Model IDIQ Contract - FA240126R0003 Amend 1.pdf PDF
Attachment 4.b - RMWT LEO GEPs Task Order 01 DD Form 1423, Contract Data Requirements List (CDRLs) Amend 1.pdf PDF
Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base Amend 1.xlsx XLSX spreadsheet
Attachment 11 LEO GEPs GFP Listing.pdf PDF
RMWT LEO GEPs Cover Letter_RFP_19Nov26 Signed.pdf PDF
Attachment 7.c.1 RMWT LEO GEPs Unpriced BOE Template TO 01 Amend 1.xlsx XLSX spreadsheet
Attachment 8 - RMWT LEO GEPs Section M Eval Factors_REVISED 1 CONUS Amend 1.pdf PDF
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan Amend 1.xlsx XLSX spreadsheet
Attachment 6 - RMWT LEO GEPs IDIQ Ordering Procedures Amend 1.pdf PDF
Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions Updated_REVISED - 1 CONUS Amend 1.pdf PDF
Attachment 4.a - RMWT LEO GEPs IDIQ DD Form 1423, Contract Data Requirements List (CDRLs) Amend 1.pdf PDF
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx XLSX spreadsheet
Attachment 5.b - RMWT LEO GEPs Model Task Order 01 - FA2401XXF000X.pdf PDF
Attachment 4.a - RMWT LEO GEPs IDIQ DD Form 1423, Contract Data Requirements List (CDRLs).pdf PDF
Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base.xlsx XLSX spreadsheet
Attachment 8 - RMWT LEO GEPs Section M Eval Factors.pdf PDF
Attachment 7.b. RMWT LEO GEPs Small Business Participation.docx DOCX document
Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf PDF
Attachment 6. - RMWT LEO GEPs IDIQ Ordering Procedures.pdf PDF
Attachment 7.d RMWT LEO GEPs Price Template.xlsx XLSX spreadsheet
Attachment 5.a - RMWT LEO GEPs Model IDIQ Contract - FA240126R0003.pdf PDF
Attachment 7.e. RMWT LEO GEPs Personnel & Facilities Template.docx DOCX document
Attachment 4.b - RMWT LEO GEPs Task Order 01 DD Form 1423, Contract Data Requirements List (CDRLs).pdf PDF
Attachment 7.a.RMWT LEO GEPs Past Performance Questionnaire (PPQ).docx DOCX document
RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf PDF
Attachment 7.c.1 RMWT LEO GEPs Unpriced BOE Template TO 01.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ

Version NumberDateComment
1.018 September 2026RFP Release Version
1.119 November 2026RFP Amendment #1
1. The "Company Name" should be reflected in Cell B17.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. The Total Evaluated Price (TEP) shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs and Travel CLINs are Not to Exceed (NTE) and are included as part of the TEP.
7. Base period CLIN 0004 will have a shielded TEP for quantity
8. The price for the IDIQ base period (31 March 2027 - 30 Sep 2031) and option period (1 Oct 2031 - 30 Sep 2035) shall include all costs to meet Labor Development and Integration, Labor Maintenance, Civil Engineering, and Material.
9. Rows 21 - 26 are IDIQ values and are not expected to change based on location. Location specific information will be filled out using the location specific tabs.
10. Values in rows 28 & 29 will be calculated by the government using a shielded TEP. See note #3 in the Material tab for additional details
_________ Price Summary
(Company Name)
RMWT LEO GEPs
CLIN DescriptionCLINCLIN TypeTotal Price
(Otis)Total Price (Fairchild)Total Price (Grand Forks)
RMWT LEO GEPs (Labor Development and Integration) Base Period0001FFP
RMWT LEO GEPs (Labor Maintenance) Base Period0002FFP
RMWT LEO GEPs (Civil Engineering) Base Period0003FFP
RMWT LEO GEPs (Labor Development and Integration) Option Period1001FFP
RMWT LEO GEPs (Labor Maintenance) Option Period1002FFP
RMWT LEO GEPs (Civil Engineering) Option Period1003FFP
Labor TOTAL$0.00$0.00$0.00
RMWT LEO GEPs (Material) Base Period0004FFP
RMWT LEO GEPs (Material) Option Period1004FFPTBDTBDTBD
Material TOTAL$0.00$0.00$0.00
ODCs - Base Period0005CR$1,500,000.00$1,500,000.00$1,500,000.00
ODCs - Option Period1005CR$500,000.00$500,000.00$500,000.00
ODC TOTAL$2,000,000.00$2,000,000.00$2,000,000.00
Travel - Base Period0006CR$1,400,000.00$1,400,000.00$1,400,000.00
Travel - Option Period1006CR$750,000.00$750,000.00$750,000.00
Travel TOTALCost ReimbCost Reimb$2,150,000.00$2,150,000.00$2,150,000.00
GFP Base Period
GFP Option Period
GFP Total$0.00$0.00$0.00

Total IDIQ Price (excluding TO#1) $4,150,000.00 $4,150,000.00 $4,150,000.00

Task Order 1 Price$807,500.00$807,500.00$807,500.00
Cost ReimbCost ReimbCost ReimbCost ReimbCost Reimb
Total Evaluated Price (TEP)Cost ReimbCost Reimb$4,957,500.00$4,957,500.00$4,957,500.00
Page 1 of 1
*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

Material

Instructions to Offerors:
1. Firm-Fixed-Price (FFP): All pricing entered in this template must be Firm-Fixed-Price (FFP).
2. Geographical Breakout: Offerors must provide separate FFP Unit Costs for CONUS (Continental United States) and OCONUS (Outside Continental United States) deployments.
3. For the purposes of proposal evaluation, the Government will utilize a Shielded Total Evaluated Price (TEP) mechanism. The estimated quantities and weighting factors used in the TEP calculation are proprietary to the Government and will not be disclosed to offerors. Accordingly, offerors must submit pricing based on a Unit Quantity of One (1) for equipment or One (1) Lot / Per Site for services, unless otherwise specified. Offerors shall submit pricing restricted to the Base Period of the IDIQ.

The proposed unit prices will be evaluated using the Government's undisclosed model. This Pricing Matrix will be incorporated into the resulting IDIQ contract.

4. Baseline Configuration: For Item 1.0 (Overall Integration), base your FFP estimate on a standard baseline site configuration consisting of two (2) ~5 to 6.5m dual-band S/Ka RF antennas and two (2) Optical Ground Terminals.
5. Prices are for one year only
6. Column N: Assumptions & Bounding Conditions: You must explicitly detail any assumptions, exclusions, or geographic bounding conditions (especially for OCONUS) used to calculate your FFP unit costs in the provided column.
Year 1
31 Mar 2027 – 30 Sep 2027Year 1
31 Mar 2027 – 30 Sep 2027Year 2
01 Oct 2027 – 30 Sep 2028Year 2
01 Oct 2027 – 30 Sep 2028Year 3
01 Oct 2028 – 30 Sep 2029Year 3
01 Oct 2028 – 30 Sep 2029Year 4
01 Oct 2029 – 30 Sep 2030Year 4
01 Oct 2029 – 30 Sep 2030Year 5
01 Oct 2030 – 30 Sep 2031Year 5

01 Oct 2030 – 30 Sep 2031

Item #Description of Cost ComponentUnit of Measure (UoM)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)Offeror Assumptions / Bounding Conditions (Specify CONUS vs OCONUS if different)
2Specific High-Cost Items Breakout (include additonal rows as needed)
2.1Concrete pad for ~5 to ~6.5m RF antenna (~20x20ft or per design)Each
2.2Concrete pad for Optical Ground Terminal (~20x20ft, seismic isolated)Each
2.2.1Rate for ConcretePer Square Foot, Per Cubic Yard
2.3Equipment Shelter Concrete PadEach
2.4Equipment Shelter (~320 sq ft, prefab or stick-built)Each
2.4.1Equipment Shelter, Purpose-built on siteCost per sq ft
2.4.2Equipment Shelter, pre-fabricatedCost per sq ft
2.5Trenching, general (~0.25 mile, flat terrain, PFAS/water mgmt)Per 0.25 Mi
2.5.1Communications line trenchingPer 0.25 Mi / per linear ft
2.5.2Power line trenchingPer 0.25 Mi / per linear ft
2.6Uninterrupted Power Supply (UPS) for graceful failoverEach
2.7Automatic Transfer Switch (ATS)Each
2.8Generator System (includes tank under 550 gallons)Each
2.9Electrical TransformerEach
2.10Electrical Switch / Junction Box (Base power interface)Each
2.11HVAC System for Equipment ShelterPer Shelter / Per Cubic ft
2.12Dual band S/Ka RF antenna & related equipmentEach
2.13Block Upconverter and amplifier or SSPA & UpconverterPer anntenna (Inlcude S&Ka separately)
2.14Spectrum Analyzer
2.15RF Antenna RadomeEach
2.16Optical Ground Terminal & related equipmentEach
2.17Tradesper hour
2.17.1HVACper hour
2.17.2Electricalper hour
2.17.3Plumbingper hour
2.17.4Fire Code complianceper hour
2.18Fencing Costper linear foot
2.19Security ComponentsEach/per system
2.19.1Badge readerseach
2.19.2Keys/lockseach
2.19.3Electronic Access Pointseach
2.19.4Remote Video Monitoring Systemper system / per camera
2.20Replacing with new antennas in the current T1 and/or T2 GEP location(s)/padsCost per antenna

TO 01 Otis

OtisInstructions to Offerors:
1. The "Company Name" should be reflected in Cell B13.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. This Total Price shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs have NTE ceilings
7. The price for the Base (31 Mar 2027 - 30 Mar 2028), Option Year One (1) (31 Mar 2028 - 30 Mar 2029), Option Year Two (2) (31 Mar 2029 - 30 Mar 2030), Option Year Three (3) (31 Mar 2030 - 30 Mar 2031), Option Four (4) (31 Mar 2031 - 30 Sep 2031).

Shall include all costs necessary to meet Labor Development and Integration, Labor Maintenance, Civil Engineering, and Material.

*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

_________ Price Summary
(Company Name)
RMWT LEO GEPs
CLIN DescriptionCLINCLIN TypeTotal Price
RMWT LEO GEPs (Labor Development and Integration) Base0001FFP
RMWT LEO GEPs (Labor Development and Integration) OY12001FFP
RMWT LEO GEPs (Labor Development and Integration) OY23001FFP
RMWT LEO GEPs (Labor Development and Integration) OY34001FFP
RMWT LEO GEPs (Labor Development and Integration) OY45001FFP
RMWT LEO GEPs (Labor Maintenance) Base0002FFP
RMWT LEO GEPs (Labor Maintenance) OY12002FFP
RMWT LEO GEPs (Labor Maintenance) OY23002FFP
RMWT LEO GEPs (Labor Maintenance) OY34002FFP
RMWT LEO GEPs (Labor Maintenance) OY45002FFP
RMWT LEO GEPs (Civil Engineering) Base0003FFP
RMWT LEO GEPs (Civil Engineering) OY12003FFP
RMWT LEO GEPs (Civil Engineering) OY23003FFP
RMWT LEO GEPs (Civil Engineering) OY34003FFP
RMWT LEO GEPs (Civil Engineering) OY45003FFP
Labor TOTAL$0.00
RMWT LEO GEPs (Material) Base0004FFP
RMWT LEO GEPs (Material) OY12004FFP
RMWT LEO GEPs (Material) OY23004FFP
RMWT LEO GEPs (Material) OY34004FFP
RMWT LEO GEPs (Material) OY45004FFP
Material TOTAL$0.00
ODCs - Base0005CR$300,000.00
ODCs - OY12005CR$25,000.00
ODCs - OY23005CR$25,000.00
ODCs - OY34005CR$25,000.00
ODCs - OY45005CR$15,000.00
ODC TOTAL$390,000.00
Travel - Base0006CR$280,000.00
Travel - OY12006CR$37,500.00
Travel - OY23006CR$37,500.00
Travel - OY34006CR$37,500.00
Travel - OY45006CR$25,000.00
Travel TOTALCost ReimbCost Reimb$417,500.00
GFP Base
GFP Option
GFP Total$0.00
Cost ReimbCost ReimbCost Reimb
Total PriceCost ReimbCost Reimb$807,500.00
Page 1 of 1

TO 01 Fairchild

FairchildInstructions to Offerors:
1. The "Company Name" should be reflected in Cell B13.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. This Total Price shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs have NTE ceilings
7. The price for the Base (31 Mar 2027 - 30 Mar 2028), Option Year One (1) (31 Mar 2028 - 30 Mar 2029), Option Year Two (2) (31 Mar 2029 - 30 Mar 2030), Option Year Three (3) (31 Mar 2030 - 30 Mar 2031), Option Four (4) (31 Mar 2031 - 30 Sep 2031).

Shall include all costs necessary to meet Labor Development and Integration, Labor Maintenance, Civil Engineering, and Material.

*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

_________ Price Summary
(Company Name)
RMWT LEO GEPs
CLIN DescriptionCLINCLIN TypeTotal Price
RMWT LEO GEPs (Labor Development and Integration) Base0001FFP
RMWT LEO GEPs (Labor Development and Integration) OY12001FFP
RMWT LEO GEPs (Labor Development and Integration) OY23001FFP
RMWT LEO GEPs (Labor Development and Integration) OY34001FFP
RMWT LEO GEPs (Labor Development and Integration) O45001FFP
RMWT LEO GEPs (Labor Maintenance) Base0002FFP
RMWT LEO GEPs (Labor Maintenance) OY12002FFP
RMWT LEO GEPs (Labor Maintenance) OY23002FFP
RMWT LEO GEPs (Labor Maintenance) OY34002FFP
RMWT LEO GEPs (Labor Maintenance) O45002FFP
RMWT LEO GEPs (Civil Engineering) Base0003FFP
RMWT LEO GEPs (Civil Engineering) OY12003FFP
RMWT LEO GEPs (Civil Engineering) OY23003FFP
RMWT LEO GEPs (Civil Engineering) OY34003FFP
RMWT LEO GEPs (Civil Engineering) O45003FFP
Labor TOTAL$0.00
RMWT LEO GEPs (Material) Base0004FFP
RMWT LEO GEPs (Material) OY12004FFP
RMWT LEO GEPs (Material) OY23004FFP
RMWT LEO GEPs (Material) OY34004FFP
RMWT LEO GEPs (Material) O45004FFP
Material TOTAL$0.00
ODCs - Base0005CR$300,000.00
ODCs - OY12005CR$25,000.00
ODCs - OY23005CR$25,000.00
ODCs - OY34005CR$25,000.00
ODCs - O45005CR$15,000.00
ODC TOTAL$390,000.00
Travel - Base0006CR$280,000.00
Travel - OY12006CR$37,500.00
Travel - OY23006CR$37,500.00
Travel - OY34006CR$37,500.00
Travel - O45006CR$25,000.00
Travel TOTALCost ReimbCost Reimb$417,500.00
GFP Base
GFP Option
GFP Total$0.00
Cost ReimbCost ReimbCost Reimb
Total PriceCost ReimbCost Reimb$807,500.00
Page 1 of 1

TO 01 Grand Forks

Grand ForksInstructions to Offerors:
1. The "Company Name" should be reflected in Cell B13.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. This Total Price shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs have NTE ceilings
7. The price for the Base (31 Mar 2027 - 30 Mar 2028), Option Year One (1) (31 Mar 2028 - 30 Mar 2029), Option Year Two (2) (31 Mar 2029 - 30 Mar 2030), Option Year Three (3) (31 Mar 2030 - 30 Mar 2031), Option Four (4) (31 Mar 2031 - 30 Sep 2031).

Shall include all costs necessary to meet Labor Development and Integration, Labor Maintenance, Civil Engineering, and Material.

*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

_________ Price Summary
(Company Name)
Contract Number
CLIN DescriptionCLINCLIN TypeTotal Price
RMWT LEO GEPs (Labor Development and Integration) Base0001FFP
RMWT LEO GEPs (Labor Development and Integration) OY12001FFP
RMWT LEO GEPs (Labor Development and Integration) OY23001FFP
RMWT LEO GEPs (Labor Development and Integration) OY34001FFP
RMWT LEO GEPs (Labor Development and Integration) O45001FFP
RMWT LEO GEPs (Labor Maintenance) Base0002FFP
RMWT LEO GEPs (Labor Maintenance) OY12002FFP
RMWT LEO GEPs (Labor Maintenance) OY23002FFP
RMWT LEO GEPs (Labor Maintenance) OY34002FFP
RMWT LEO GEPs (Labor Maintenance) O45002FFP
RMWT LEO GEPs (Civil Engineering) Base0003FFP
RMWT LEO GEPs (Civil Engineering) OY12003FFP
RMWT LEO GEPs (Civil Engineering) OY23003FFP
RMWT LEO GEPs (Civil Engineering) OY34003FFP
RMWT LEO GEPs (Civil Engineering) O45003FFP
Labor TOTAL$0.00
RMWT LEO GEPs (Material) Base0004FFP
RMWT LEO GEPs (Material) OY12004FFP
RMWT LEO GEPs (Material) OY23004FFP
RMWT LEO GEPs (Material) OY34004FFP
RMWT LEO GEPs (Material) O45004FFP
Material TOTAL$0.00
ODCs - Base0005CR$300,000.00
ODCs - OY12005CR$25,000.00
ODCs - OY23005CR$25,000.00
ODCs - OY34005CR$25,000.00
ODCs - O45005CR$15,000.00
ODC TOTAL$390,000.00
Travel - Base0006CR$280,000.00
Travel - OY12006CR$37,500.00
Travel - OY23006CR$37,500.00
Travel - OY34006CR$37,500.00
Travel - O45006CR$25,000.00
Travel TOTALCost ReimbCost Reimb$417,500.00
GFP Base
GFP Option
GFP Total$0.00
Cost ReimbCost ReimbCost Reimb
Total PriceCost ReimbCost Reimb$807,500.00
Page 1 of 1

Material I-E

Attachment 7.d — Material Inclusions/Exclusions
Government-provided pricing direction for the Attachment 7.d Material worksheet. This worksheet is not offeror-completed.
PurposeState the ancillary material elements included in, excluded from, Government-furnished for, or not required with the Material worksheet FFP unit prices.
Scope limitDo not use this worksheet to allocate labor or services, including installation, integration, configuration, testing, training, maintenance, warranty-service labor, travel, escort, staging, or logistics support.
CompletionGovernment completes Column B before release. Use Column C only when an item-specific exception or boundary statement is needed.
Ancillary Material ElementGovernment TreatmentGovernment Direction / Boundary / Item-Specific Exception
Manufacturer warrantyIncluded in Material Unit PriceExcludes labor based-pricing including warranty-service labor, removal/reinstallation, testing, travel, and support labor.
Initial spares and consumablesNot RequiredSpares, when required, will be addressed by relevant task order direction.
Item-specific special tools and test equipmentNot RequiredItem specific tools and test equipment will not be required in Attachment 7d Material tab pricing.
Item-specific documentation, software, firmware, and licensesIncluded in Material Unit PriceManuals, configuration media, embedded software/firmware, and required item-specific licenses are included in Attachment 7d Material tab pricing. Excludes ongoing subscriptions unless expressly stated.
Logistics (Packing, freight, and delivery of material)Excluded—Priced ElsewherePacking, freight, and delivery of material is priced separately using the provided ODC plug value. Excludes escort, staging, installation, and all other labor.
Material Worksheet Direct LaborExcluded—Priced ElsewhereAll labor costs affiliated with items in the Attachment 7d Material Worksheet should be captured in the associated labor CLINS (x001-x003)
General exclusion: Unless expressly stated above, post-acceptance replenishment, replacement material, technology refresh, and obsolescence management are not included in Material worksheet FFP unit prices.
Dropdown selections for Column B: Included in Material Unit Price; Excluded—Priced Elsewhere; Government-Furnished; Not Required. Replace all TBD—Government Direction entries before release.

Pricing Certification

PRICING CERTIFICATION
INSTRUCTIONS: Complete ONLY the yellow cells. Select Yes or No in the dropdown. Do not modify the certification text.
Offeror Completion
Offeror Name
Authorized Representative
Title
Date
Conflict or ambiguity identified in price volume Narrative and Methodology file?
Narrative page number(s), if Yes
Certification
The Offeror certifies that: (1) its proposed Basic IDIQ and TO 1 prices are complete and include all costs necessary to perform the applicable SOW and TRD requirements; (2) it has not knowingly duplicated pricing of the same defined material, labor, installation, integration, test, documentation, warranty, spare, support-equipment, logistics, or other supporting element in more than one proposed pricing location; (3) common Basic IDIQ scope and TO 1-specific incremental scope are priced only in their respective applicable pricing locations; and (4) proposed prices are consistent with the Price Volume, Technical Volume, and Unpriced BOE.
Certification Signature
Authorized Representative
Title
Date
Yellow cells are offeror-completed.