Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base Amend 2.xlsx
XLSX spreadsheet 54 KB Posted
- Solicitation number
- FA240126R0003
- Issued by
-
Department of the Air Force
About this file
This is an Unpriced Basis of Estimate (BOE) Template for the RMWT LEO GEPs Indefinite Delivery Indefinite Quantity (IDIQ) Base contract (FA240126R0003). The template provides comprehensive instructions and structure for contractors to submit detailed, unpriced cost estimates supporting their proposals to the Space Development Agency. The BOE covers six primary Contract Line Items (CLINs): CLIN 001 (Development Labor), CLIN 002 (Maintenance Labor), CLIN 003 (Civil Engineering), CLIN 004 (Material), CLIN 005 (Other Direct Costs/ODCs), and CLIN 006 (Travel). Contractors must align their BOE structure with the CLIN structure in the RFP and provide detailed work breakdown structure (WBS) elements, periods of performance, labor categories by fiscal year (FY27–FY35), and time-phased estimates for both base and option periods.
The template requires contractors to document their basis of estimate methodology using one or more of the following approaches: Analogy, Expert Judgment, Parametric Cost Estimates/Cost Estimating Relationships, or Other methods. Each estimate must be accompanied by comprehensive justification including assumptions, ground rules, and supporting rationale. For labor estimates, contractors must identify performing companies and labor categories with associated hours by fiscal year. For material and ODCs, contractors must provide itemized Bills of Materials (BOM) with quantities, purposes, ordering dates, and delivery requirements. Travel must be supported by non-priced itineraries including trip descriptions, destinations, number of travelers, transportation methods, duration, and lodging details. All estimates must reconcile with the SOW paragraphs and demonstrate consistency across the proposal narrative, subcontractor proposals, and any interdivisional or vendor submissions.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOE Template Instructions
UNCLASSIFIED
| Block Number | Block Description | Block Instructions |
| ALL | BOE Template | This is a template and is does not contain all tabs required. Please follow the instructions below. |
| Block 1 | WBS, CLIN, SOW Level 3 Number and Title | Enter the CLIN #/Title Associated with the BOE. The BOE shall fully and completely support the CLIN structure contained in the RFP. Any variation between the BOE and CLIN Structure shall be explained in the Contractor's proposal to ensure that the BOE and CLIN Structures are reconcilable. Enter the WBS # and SOW Paragraph(s). In the case of expert judgement the contractor shall provide the credentials of persons providing extimates. In the case of analogy, the contractor shall describe rationale for why the analogous program is appropriate and any factors used in determining estimates. |
| Block 2 | Period of Performance and Task Start/Stop | Enter the start date of the items cited in Block 1, also enter the Period of Performance. |
| Block 3 | WBS Element (Level 3/4) Description | WBS element descriptions shall identify the WBS element scope, and specific tasks. The WBS element description shall also describe the relationship of this WBS element scope with others in terms of scope (what is in scope of this WBS element and what is not in scope of this WBS element and which related WBS element the other scope is in). |
| Block 4 | Basis of Estimate Method(s) | Select the BOE method used for the estimated resources necessary to complete the effort used from list provided. The BOE method shall be fully and completely described and justified in Block 5. |
| Block 5 | Method Justification | Enter the justification or references for use of the BOE method(s) listed in Block 4. BOE justifications shall include, but is not limited to the Contractor's rationale for using a particular BOE method, related assumptions, and other factors. Parametric cost estimates and/or cost estimating relationships shall be accompanied by a description of the inputs, equations, and/or models along with any unique parameter values. Commercial and/or propriety cost models used to generate a BOE shall be accompanied by a clear and concise description of inputs, parameters, key decision variables, consumption metrics, and common usage, indicating the Contractor's rationale for using the model. When a commercial model is used, include the model name, vendor, and version number. In the case of expert judgment the contractor shall provide the credentials of personnel providing estimates. In the case of analogy, the contractor shall provide rationale for why the analagous program is appropriate and any factors used in determining estimates. |
| Block 6 | Labor Information | Enter the name of the company(ies) responsible for performing the work associated with the item(s) cited in Block 1. |
| Block 7 | Other Direct Cost (ODC) and/or Material Description | Enter a description of ODCs associated with the WBS or SOW task description cited in Block 1. Ensure ODCs are only addressed in a single location and not duplicated across multiple WBS elements. Enter "N/A" if there are no ODCs associated with the WBS or SOW tasks description cited in Block 1. Enter a description of material to support the WBS or SOW task description cited in Block 1. Reference the appropriate sections in the BoM. Material cost descriptions shall include direct and indirect material costs. |
| Block 8 | Ground Rules, Assumptions, and Additional Information | Enter Ground Rules, Assumptions, and Additional Information having significant impact on proposed amounts. The information shall provide a clear and complete understanding of how the estimate was derived. Narratives may include descriptions of how the BOE was developed, known constraints, range of possible estimates, and confidence levels associated with the final estimate. Include areas such as "ATP" approval dates and delivery schedules; availability of information, hardware, software, facilities, and other resources required of the Government; technical performance parameters; design and development constraints, whether imposed by the Government or self-imposed by the Contractor (e.g. security); and assumptions for key rates and factors. As the Contractor deems necessary, describe resources required by the Government (e.g. GFE and property including estimated cost if required for Contractor's technical approach); and key technical and management requirements driving cost whether imposed by the Government or self-imposed by the Contractor. In general, the Contractor shall describe how each Ground Rule or Assumption impacts the proposed amount and must identify those Ground Rules or Assumptions that may result in increased amounts. Descriptions of tasks and technical approaches contained within the BOE shall be consistent with those included in other portions of the proposal. The Contractor shall provide descriptions that are consistent with those contained within Subcontractor, interdivisional, or vendor proposals; any differences or discrepancies must be identified, described, and resolved. Lastly, this Block is reserved for additional information the Contractor deems necessary to fully describe the BOE. |
| Time Phased Estimate Tab(s) | Time Phased Estimates by CLIN and WBS Element | Enter time phased estimates for each labor CLIN by WBS elements. Time phased tabs shall be consistent with the cost volume time phasing e.g. monthly by GFY. |
| Travel Tab | Travel | Proposed travel shall be supported by only non-priced information including trip description, detailed itineraries to include origin, destination, number of travelers, method of travel (flight, car, etc.), trip duration, car rental requirement, and lodging (duration, # of rooms, etc.) (IAW Joint Travel Regulations). |
| BOM Tab | Unpriced BOM | Offeror shall provide an itemized Bill of Materials (BOM) to include item description and quantity. The Offerors BOM shall be proposed by SOW task. The BOM shall describe the material in terms defined by FAR 45.101, such as equipment, material, special test equipment, special tooling and other listing as needed. |
| Version Number | Date | Comment |
| 1.0 | 18 September 2026 | RFP Release Version |
| 1.1 | 19 November 2026 | RFP Amendment #1 |
| 1.2 | 24 November 2026 | RFP Amendment #2 |
BOE Template
| Basis of Estimate for FA240126R0003 |
| Section 1: Basis of Estimate Proposal References |
| Block 1. |
WBS: X.X.X:
CLIN Number(s) SOW Paragraph Number(s) Block 2.
Period of Performance:
mm/dd/yyyy-mm/dd/yyyy
Task Start/Task Stop:
mm/dd/yyyy-mm/dd/yyyy
Block 3.
WBS Element Description:
| Section 2: Basis of Estimate |
| Block 4. |
Basis of Estimate Method(s)- place an X in the [ ] for method applied. Describe what was used and why this was selected as the appropriate method in the Method Justification Section.
Analogy [ ] Expert Judgement [ ] Parametric Cost Estimate/Cost Estimating Relationship [ ] Other [ ]
Block 5.
Method Justification:
| Block 6. Labor Information | |||||||||||
| Performing Company | Labor Category | CLIN | SOW (Level 3) Reference(s) | FY27 | FY28 | FY29 | FY30 | FY31 | Total Hours (Base Only) | FY32 | |
| OY#1 | FY33 | ||||||||||
| OY#2 | FY34 | ||||||||||
| OY#3 | FY35 | ||||||||||
| OY#4 | Total Hours (Option Only) |
Block 7.
Other Direct Cost (ODC) and/or Material Description:
Block 8.
Ground Rules, Assumptions and Additional Information:
CLIN Labor Summary
| Total Proposed Labor Hours by CLIN and GFY | |||||||
| CLIN | FY27 | FY28 | FY29 | FY30 | FY31 | FY32 | |
| Option Period | FY33 | ||||||
| Option Period | FY34 | ||||||
| Option Period | FY35 |
Option Period
| CLIN 001 - RMWT LEO GEPs Labor (Development) |
| CLIN 002 - RMWT LEO GEPs Labor (Maintenance) |
| CLIN 003 - RMWT LEO GEPs Civil Engineering |
| CLIN 004 - RMWT LEO GEPs Material |
| CLIN 005 - RMWT LEO GEPs ODCs |
| CLIN 006 - RMWT LEO GEPs Travel |
| Total |
CLIN001 Summary
| CLIN 001 - RMWT LEO GEPs Labor (Development) | |||||||||||||||||||||||||||||||||||||||||||||||||
| GFY | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY31 | FY31 | FY31 | FY31 | ||
| Contract Period | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | ||
| Month (if after the first identify the day) | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | ||
| Labor Hours | CLIN 1 Summary by CWBS Element | CLIN 1 Summary by SOW Paragraph(s) | |||||||||||||||||||||||||||||||||||||||||||||||
| WBS x.x.x | SOW para(s). a.b.c | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS y.y.y | SOW para(s). d.e.f | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS z.z.z | SOW para(s). g.h.i |
CLIN002 Summary
| CLIN 002 - RMWT LEO GEPs Labor (Maintenance) | |||||||||||||||||||||||||||||||||||||||||||||||||
| GFY | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY31 | FY31 | FY31 | FY31 | ||
| Contract Period | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | ||
| Month (if after the first identify the day) | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | ||
| Labor Hours | CLIN 2 Summary by CWBS Element | CLIN 2 Summary by SOW Paragraph(s) | |||||||||||||||||||||||||||||||||||||||||||||||
| WBS x.x.x | SOW para(s). a.b.c | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS y.y.y | SOW para(s). d.e.f | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS z.z.z | SOW para(s). g.h.i |
CLIN003 Summary
| CLIN 003 - RMWT LEO GEPs Civil Engineering | |||||||||||||||||||||||||||||||||||||||||||||||||
| GFY | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY31 | FY31 | FY31 | FY31 | ||
| Contract Period | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | ||
| Month (if after the first identify the day) | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | ||
| Labor Hours | CLIN 3 Summary by CWBS Element | CLIN 3 Summary by SOW Paragraph(s) | |||||||||||||||||||||||||||||||||||||||||||||||
| WBS x.x.x | SOW para(s). a.b.c | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS y.y.y | SOW para(s). d.e.f | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS z.z.z | SOW para(s). g.h.i |
CLIN004 CLIN005 Unpriced BOM
| Unpriced BOM Template Amplifying CLIN 0004 Material CLIN 0005 Items | ||||||
| WBS | Applicable SOW Paragraph(s) | Material/Item | Quantity | Purpose/Rationale | Ordering Date | Date of Need |
CLIN005 Labor Summary
| CLIN 005 - RMWT LEO GEPs ODCs Labor | |||||||||||||||||||||||||||||||||||||||||||||||||
| GFY | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 27 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY 28 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY29 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY30 | FY32 | FY32 | FY32 | FY32 | ||
| Contract Period | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Option | Option | Option | Option | ||
| Month (if after the first identify the day) | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | ||
| Labor Hours | CLIN 5 Summary by CWBS Element | CLIN 5 Summary by SOW Paragraph(s) | |||||||||||||||||||||||||||||||||||||||||||||||
| WBS x.x.x | SOW para(s). a.b.c | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS y.y.y | SOW para(s). d.e.f | ||||||||||||||||||||||||||||||||||||||||||||||||
| WBS z.z.z | SOW para(s). g.h.i |
CLIN006 Travel
| RMWT LEO GEPs Travel Itenerary | ||||
| Trip Description | Destination | GFY | Duration (Nights) | Number of Travelers |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .