Attachment 7.d RMWT LEO GEPs Price Template.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
Solicitation number
FA240126R0003
Issued by

About this file

This is a pricing template for the Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs) solicitation. The template is designed to capture contractor pricing for the RMWT LEO GEPs effort, which encompasses multiple globally dispersed GEP site locations. Contractors must use this template to submit their price proposals as part of the overall RFP response due by 16:00 Eastern Time on 02 November 2026. The template aligns with the contract structure outlined in the solicitation, which includes both an Indefinite Delivery/Indefinite Quantity (IDIQ) base contract and Task Order 01, and should be completed in conjunction with the Unpriced Basis of Estimate (BOE) templates to provide detailed cost justification for the proposed pricing.

The pricing template is a standard component of the RFP package issued by the Space Development Agency (SDA) under the Department of the Air Force. Contractors responding to solicitation FA240126R0003 must complete this template to document all costs associated with GEP site civils, procurement, installation, integration, test and verification activities, communications shelters, antennas and antenna electronics, optical terminals and optical electronics, test hardware and training, onsite test support, and GEP site networking equipment and software. This template serves as the formal pricing submission mechanism and must be submitted alongside other required proposal documents including past performance questionnaires, small business participation documentation, and personnel and facilities information.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ

Instructions to Offerors:
1. The "Company Name" should be reflected in Cell B15.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. The Total Evaluated Price (TEP) shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs and Travel CLINs are Not to Exceed (NTE) and are included as part of the TEP.
7. Base period CLIN 0004 will have a shielded TEP for quantity
8. The price for the base period (31 March 2027 - 30 Sep 2031) and option period (1 Oct 2031 - 30 Sep 2035) shall include all costs to meet Labor Development and Integration, Labor Maintenance, Civil Engineering, and Material. Costs to perform future change requests shall be included.

*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

_________ Price Summary
(Company Name)
Contract Number
CLIN DescriptionCLINCLIN TypeTotal Price
RMWT LEO GEPs (Labor Development and Integration) Base Period0001FFP
RMWT LEO GEPs (Labor Maintenance) Base Period0002FFP
RMWT LEO GEPs (Civil Engineering) Base Period0003FFP
RMWT LEO GEPs (Labor Development and Integration) Option Period1001FFP
RMWT LEO GEPs (Labor Maintenance) Option Period1002FFP
RMWT LEO GEPs (Civil Engineering) Option Period1003FFP
Labor TOTAL$0.00
RMWT LEO GEPs (Material) Base Period0004FFP
RMWT LEO GEPs (Material) Option Period1004FFPTBD
Material TOTAL$0.00
ODCs - Base Period0005CR$1,500,000.00
ODCs - Option Period1005CR$500,000.00
ODC TOTAL$2,000,000.00
Travel - Base Period0006CR$1,400,000.00
Travel - Option Period1006CR$750,000.00
Travel TOTALCost ReimbCost Reimb$2,150,000.00
GFP Base Period
GFP Option Period
GFP Total$0.00

Total IDIQ Price $4,150,000.00

Task Order 1 Price$807,500.00
Cost ReimbCost ReimbCost Reimb
Total Evaluated Price (TEP)Cost ReimbCost Reimb$4,957,500.00
Page 1 of 1

Material

Instructions to Offerors:
1. Firm-Fixed-Price (FFP): All pricing entered in this template must be Firm-Fixed-Price (FFP).
2. Geographical Breakout: Offerors must provide separate FFP Unit Costs for CONUS (Continental United States) and OCONUS (Outside Continental United States) deployments.
3. For the purposes of proposal evaluation, the Government will utilize a Shielded Total Evaluated Price (TEP) mechanism. The estimated quantities and weighting factors used in the TEP calculation are proprietary to the Government and will not be disclosed to offerors. Accordingly, offerors must submit pricing based on a Unit Quantity of One (1) for equipment or One (1) Lot / Per Site for services, unless otherwise specified. Offerors shall submit pricing restricted to the Base Period of the IDIQ.

The proposed unit prices will be evaluated using the Government's undisclosed model. This Pricing Matrix will be incorporated into the resulting IDIQ contract.

4. Baseline Configuration: For Item 1.0 (Overall Integration), base your FFP estimate on a standard baseline site configuration consisting of two (2) ~5 to 6.5m dual-band S/Ka RF antennas and two (2) Optical Ground Terminals.
5. Prices are for one year only
6. Column N: Assumptions & Bounding Conditions: You must explicitly detail any assumptions, exclusions, or geographic bounding conditions (especially for OCONUS) used to calculate your FFP unit costs in the provided column.
Year 1
31 Mar 2027 – 30 Sep 2027Year 1
31 Mar 2027 – 30 Sep 2027Year 2
01 Oct 2027 – 30 Sep 2028Year 2
01 Oct 2027 – 30 Sep 2028Year 3
01 Oct 2028 – 30 Sep 2029Year 3
01 Oct 2028 – 30 Sep 2029Year 4
01 Oct 2029 – 30 Sep 2030Year 4
01 Oct 2029 – 30 Sep 2030Year 5
01 Oct 2030 – 30 Sep 2031Year 5

01 Oct 2030 – 30 Sep 2031

Item #Description of Cost ComponentUnit of Measure (UoM)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)FFP Unit Cost CONUS ($)FFP Unit Cost OCONUS ($)Offeror Assumptions / Bounding Conditions (Specify CONUS vs OCONUS if different)
1Overall GEP Site Integration (Baseline Config)Per Site(Assume 1 Comm Shelter, 2 RF & 2 Optical Terminals per site)
1.1Site Permitting & Associated Civil Works (General)Per Site
1.2Major Component Integration (Shelter/Antenna/Radome)Per Site
1.3Backend Electronics & Integration / Electrical SupportPer Site
1.4Earthworks prep - vegetation clearing, filling, grading, storm draining, compactingPer sq ft
2Specific High-Cost Items Breakout (include additonal rows as needed)
2.1Concrete pad for ~5 to ~6.5m RF antenna (~20x20ft or per design)Each
2.2Concrete pad for Optical Ground Terminal (~20x20ft, seismic)Each
2.2.1Rate for ConcretePer Square Foot, Per Cubic Yard
2.3Equipment Shelter Concrete PadEach
2.4Equipment Shelter (~320 sq ft, prefab or stick-built)Each
2.4.1Equipment Shelter, Purpose-built on siteCost per sq ft
2.4.2Equipment Shelter, pre-fabricatedCost per sq ft
2.5Trenching (~0.25 mile, flat terrain, PFAS/water mgmt)Per 0.25 Mi
2.5.1Communications line trenchingPer 0.25 Mi / per linear ft
2.5.2Power line trenchingPer 0.25 Mi / per linear ft
2.6Uninterrupted Power Supply (UPS) for graceful failoverEach
2.7Automatic Transfer Switch (ATS)Each
2.8Generator System (includes tank under 550 gallons)Each
2.9Electrical TransformerEach
2.10Electrical Switch / Junction Box (Base power interface)Each
2.11HVAC System for Equipment ShelterPer Shelter
2.11.1HVAC System for Equipment ShelterPer Cubic ft
2.12Dual band S/Ka RF antenna & related equipmentEach
2.13Block Upconverter and amplifier or SSPA & UpconverterPer anntenna (Inlcude S&Ka separately)
2.14Spectrum Analyzer
2.15RF Antenna RadomeEach
2.16Optical Ground Terminal & related equipmentEach
2.17Tradesper hour
2.17.1HVACper hour
2.17.2Electricalper hour
2.17.3Plumbingper hour
2.17.4Fire Code complianceper hour
2.18Fencing Costper linear foot
2.19Security ComponentsEach/per system
2.19.1Badge readerseach
2.19.2Keys/lockseach
2.19.3Electronic Access Pointseach
2.19.4Remote Video Monitoring Systemper system / per camera
2.20Antenna upgrade for dual-polarization capability and reference T1 antenna specsCost per antenna

TO 01

Instructions to Offerors:
1. The "Company Name" should be reflected in Cell B13.
2. Fill in ONLY the yellow cells below.
3. This template should automatically calculate all costs by summing as appropriate.
4. The Offeror is responsible for the accuracy of the price template.
5. This Total Price shall be included in Price volume of the proposal (Volume IV).
6. Both the Other Direct Cost (ODC) CLINs have NTE ceilings
7. The price for the Base (31 Mar 2027 - 30 Mar 2028), Option Year One (1) (31 Mar 2028 - 30 Mar 2029), Option Year Two (2) (31 Mar 2029 - 30 Mar 2030), Option Year Three (3) (31 Mar 2030 - 30 Mar 2031), Option Four (4) (31 Mar 2031 - 30 Sep 2031).

Shall include all costs necessary to meet Labor Development and Integration, Labor Maintenance, and Material. Costs to perform future change requests shall be included.

*Note - Please do not change any of the values that have been provided, input proposed prices in the yellow cells only on this tab.

_________ Price Summary
(Company Name)
Contract Number
CLIN DescriptionCLINCLIN TypeTotal Price
RMWT LEO GEPs (Labor Development and Integration) Base0001FFP
RMWT LEO GEPs (Labor Development and Integration) OY11001FFP
RMWT LEO GEPs (Labor Development and Integration) OY22001FFP
RMWT LEO GEPs (Labor Development and Integration) OY33001FFP
RMWT LEO GEPs (Labor Development and Integration) O44001FFP
RMWT LEO GEPs (Labor Maintenance) Base0002FFP
RMWT LEO GEPs (Labor Maintenance) OY11002FFP
RMWT LEO GEPs (Labor Maintenance) OY22002FFP
RMWT LEO GEPs (Labor Maintenance) OY33002FFP
RMWT LEO GEPs (Labor Maintenance) O44002FFP
RMWT LEO GEPs (Civil Engineering) Base0003FFP
RMWT LEO GEPs (Civil Engineering) OY11003FFP
RMWT LEO GEPs (Civil Engineering) OY22003FFP
RMWT LEO GEPs (Civil Engineering) OY33003FFP
RMWT LEO GEPs (Civil Engineering) O44003FFP
Labor TOTAL$0.00
RMWT LEO GEPs (Material) Base0004FFP
RMWT LEO GEPs (Material) OY11004FFP
RMWT LEO GEPs (Material) OY22004FFP
RMWT LEO GEPs (Material) OY33004FFP
RMWT LEO GEPs (Material) O44004FFP
Material TOTAL$0.00
ODCs - Base0005CR$300,000.00
ODCs - OY11005CR$25,000.00
ODCs - OY22005CR$25,000.00
ODCs - OY33005CR$25,000.00
ODCs - O44005CR$15,000.00
ODC TOTAL$390,000.00
Travel - Base0006CR$280,000.00
Travel - OY11006CR$37,500.00
Travel - OY22006CR$37,500.00
Travel - OY33006CR$37,500.00
Travel - O44006CR$25,000.00
Travel TOTALCost ReimbCost Reimb$417,500.00
GFP Base
GFP Option
GFP Total$0.00
Cost ReimbCost ReimbCost Reimb
Total PriceCost ReimbCost Reimb$807,500.00