SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES TABLE
Annex/Spec Item
Form Attachment
Number Deliverable Title
Date (s) of Submission Distribution
Frequency
0200000 Management and Administration
0200000/2.2.1.2 N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO, COR As specified
0200000/2.3.4 N/A Permits and Licenses Before work commences and as requested by the KO.
KO, COR As specified
0200000/2.3.5 N/A Certificate of Insurance
At least 15 calendar days after award.
KO, COR As specified
0200000/2.3.6 N/A Government Furnished Property Damage Report
At least 5 calendar days of incident
KO, COR As specified
0200000/2.6.1 N/A Safeguarding Information Compliance Checklist
POA&M
Upon completion of compliance
KO, COR As specified
0200000/2.6.1 N/A Cybersecurity Incident Notification
Immediately after incident
KO, COR As specified
0200000/2.6.4 N/A Work Status Update Within two hours of inquiry during normal working hours, by 0800 following work day for after hours
KO, COR As specified
0200000/2.6.5 N/A Notification of Difficulty in Scheduling Work
Immediately following identification of scheduling difficulty
KO, COR As specified
0200000/2.6.5.1 N/A Annual Work Schedule
At least 15 calendar days prior to contract start, then annually
KO, COR As specified, annually
0200000/2.6.6.2 N/A Monthly Work Schedule
At least15 calendar days prior to contract start, then monthly, with invoice for preceding month
KO, COR As specified, monthly
0200000/2.6.7 N/A Request for Authorization for Utility Service Interruption
At least 5 working days prior to the event
KO, COR As specified
0200000/2.6.8.2 N/A Pipe Delimited Flat- File
By the end of each workday
KO or a representative designated by the KO
0200000/2.6.8.2 N/A Sample Pipe Delimited Flat-File
At least 30 calendar days prior to contract start
KO or a representative designated by the KO
0200000/ 2.6.8.3
N/A List of personnel requiring access to Government’s Maximo
At least 30 calendar days prior to contract start
KO and COR As specified
0200000/ 2.6.9.1
N/A Quality Management (QM) Plan
At least 30 calendar days prior to contract start
KO, COR As specified
0200000/ 2.6.9.1
N/A Revised Quality Management Plan
Within seven calendar days of changes
KO and COR As specified
0200000/ 2.6.9.2
N/A Quality Inspection and Surveillance File
Within five calendar days of completion/ termination of the contract
KO, COR As specified
0200000/ 2.6.9.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO, COR Monthly
0200000/ 2.6.10
N/A Property Management Plan
At least 45 calendar days prior to contract start
KO, COR As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
At least 30 calendar days prior to contract start
KO, COR As specified
0200000/ 2.7.1
N/A Organizational Chart At least 30 calendar days prior to contract start
KO, COR As specified
0200000/ 2.7.5
N/A Service Contract Reporting (SCR)
No later than 31 October, for labor executed during the period of performance during each Government fiscal year
KO and COR As specified
0200000/ 2.8.1
N/A Employee List At least 15 calendar days prior to contract start, within seven calendar days of changes.
KO, COR As specified
0200000/ 2.8.8
N/A OF-306 Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR, and Security Manager
As required
0200000/ 2.8.8.2
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
At least 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR, and Security Manager
As required
0200000/ 2.9.1
N/A Accident Prevention Plan
At least 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR As specified
0200000/ 2.9.2
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and COR As specified
0200000/ 2.9.3
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and COR As specified
0200000/ 2.9.3.7
N/A Control of Hazardous Energy (lockout/tagout)
At least 30 calendar days after annual inspection
KO and COR Annually
0200000/ 2.9.5
N/A Navy Contractor Significant Incident Report
Within one calendar day of accident
KO, COR As specified
0200000/ 2.9.5
N/A Weight Handling Equipment Accident Report
At least 30 calendar day of accident.
KO, COR As specified
0200000/ 2.9.5
N/A Initial Accident Reporting Notification Report
Immediately after an accident or near miss.
2.9.5
N/A Follow-on Accident Reporting Notification Report
Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.
KO, COR As specified
0200000/ 2.9.5.1
N/A Final Accident Reporting Notification Report
Within 24 hours after completing the investigation of the accident.
KO, COR As specified
0200000/ 2.9.7
N/A On-Site Labor Report Monthly KO, COR Fifth day of each month.
0200000/
2.9.8 N/A OSHA Violations and
Corrective Action Report
Within 48 hours after receiving a citation.
KO, COR As specified
0200000/ 2.9.9
N/A Safety Inspections and Monitoring Report
Within one day of request
KO, COR As specified
0200000/ 2.9.10
N/A Safety Certifications Prior to start of work and as old certifications expire.
KO, COR As specified
0200000/2.10 N/A EMS Goals and Policy Measurement Information
Within one day of request
KO and COR As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
At least 15 calendar days prior to contract start.
KO, COR As specified
0200000/ 2.10.2
N/A Environmental Protection Plan
At least 15 calendar prior to contract start.
KO, COR As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to each sampling event
KO, COR As specified
0200000/ 2.10.2.1
N/A Sample, Test, and Laboratory Analysis Results
Within one day of request
KO, COR As specified
0200000/ 2.10.2.2
N/A Class I ODS Report At least 5 calendar days after delivery of refrigerant to DLA-
DRMO
KO, COR As specified
0200000/ 2.10.2.8
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
At least 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material
KO, COR
0200000/ 2.10.2.8
J-0200000-
XX
Contractor Hazardous Material Inventory Log
At least 15 calendar days after the end of each calendar year and at termination of the contract
KO, COR As specified
0200000/ 2.10.2.12
N/A Asbestos Containing Material Notification
Within 24 hours if ACM is encountered or suspected in the performance of work.
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
At least 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO, COR As specified
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period
2.10.3.2
N/A Recovered Material Certification
When a product containing recovered materials is equal to or better than the original and could be used.
0200000/ 2.11
N/A Mission Critical/Mission Essential Personnel
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR As specified
0200000/ 2.12
N/A Technical Library Table of Contents
At least 15 calendar days after contract start and within seven calendar days of changes
KO, COR As specified
0200000/ 2.14.1
N/A Recurring Work Proposal
Within five calendar days following receipt of request
KO, COR As specified
0200000/ 2.14.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO, COR As specified
0200000/2.15.1.1 N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO, COR As specified
0200000/2.15.2.1 N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO As required
0300000 – Command/Adm in Support
0300000/2.2.1 N/A Language Skills Certification
At least 15 calendar days prior to contract start
KO As specified
0401000 – Force Protection
None 0402000 – Fire and Emergency
Services
0402000/2.2 N/A Certification and Licenses
At least 15 calendar days prior to contract start
KO As specified
0402000/2.2.7 N/A Certification and Training
EMS personnel: At least ten working days prior to contract start Fire personnel: At least 30 calendar days prior to contract start
KO As specified
0402000/3 N/A Fire and Emergency Services SOPs
At least 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO As specified
0402000/3.1.1 N/A Hazard Response Documentation and Reports
Within 24 hours after completing the hazard response.
KO, COR,
Region Fire
As specified
0402000/3.2 N/A Patient Care Reports 1st working day of each month
Region Fire As
0403000 – Emergency
Management
None 1001000 Material
1001000/2.2.1 N/A Certification and Training
At least 15 calendar days prior to contract start
KO, COR As specified
1001000/2.3.1 SAAR Forms, List of Personnel Requiring Systems Access
At least 15 calendar days prior to contract start
KO, COR As specified
1001000/3.1 N/A Warehousing SOPs At least 15 calendar days prior to contract start
KO, COR As specified
1001000/3.1.2 N/A Inventory Report Within 5 working days after receipt of inventory report
KO, COR As specified
1002000 Supply Services
1002000/2.2.1 N/A Certification and
At least 15 calendar days prior to contract start
KO, COR As specified
1001000/2.3.1 List of Personnel Requiring Log-ins and Systems Access
At least 15 calendar days prior to contract start
KO, COR As specified
1001000/3.1.1 PPO Services Metrics Data Collection Report
First working day of the week
KO, COR As specified
1002000/3.3 A/a Mail Services SOPs At least 15 calendar days prior to contract start
KO, COR As specified
1200000 MWR
None
1300000 Galley 1300000/2.2.2 N/A Certification and
Training At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1300000/2.2.6 N/A List of Food Handler Employees, Training, and Health Certificate
At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1300000/3 J-1300000-06 Customer Survey Monthly Summary
At least five calendar days after the end of each month
KO, COR As specified
1300000/3 N/A POS Reconciliation Report
End of each meal period
KO As specified
1300000/3.1.1 N/A 21-day Cycle Menu At least 30 days prior to contract start and ten days prior to the start of each new cycle
KO, COR As specified
1300000/ 3.1.2 N/A Menu Review Board Minutes
Within five working days of quarterly meeting
KO, FSO As specified
1300000/3.1.2.2 N/A Consumable Supply Invoice
Within 5 working days after end of the month.
KO, COR As specified
1300000/3.3.1 N/A NAVSUP Form 1291 Meal Signature Record
Weekly on the first working day of the following week
KO, FSO As specified
1300000/ 3.3.1 NAVSUP
Form 1359
General Mess Summary Document
Daily at the end of last meal period
KO, FSO As specified
1300000/3.4.2 N/A Mess Gear Inventory Record
Within one calendar day of request
1300000/3.5 N/A Schedule of Housekeeping and Sanitation Services
At least 15 calendar days prior to contract start, within 7 days of changes
KO, COR As specified
1300000/3.6 N/A Galley Equipment PM Plan
At least 15 calendar days prior to contract start, within 7 days of changes
KO, COR As specified
1402000 - Unaccompanied
Housing
1402000/3.1.1 N/A Occupancy Report Within five working days following the end of each month
COR As specified
1402000/3.1.6 N/A COS Inspection Report Prior to occupancy COR As specified
1501000 Facility
1501000/3.1.3 N/A MAXIMO Work Order Report
Weekly, first working day of following week
KO, COR
As
1501000/3.2.1 N/A MAXIMO Asset Changes Report
Monthly, first working day of following month
1502000 Facility Investment
1502000/2.2.1 N/A Certification and
At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1502000/3.1 N/A Summary of Competed and Unaccomplished Service Orders
The first workday of each month.
1502000/3.1.1 N/A Emergency Service Order Status Report
Within 30 minutes of completion of work
1502000/3.2 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
1502000/3.2 N/A Individual Equipment PM Program Work Schedule
At least 5 working days prior to the month scheduled, then monthly
KO, COR As specified, first working day of the month
1502000/3.3 N/A Inspection, Testing and Certification Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR As specified, annually
1502000/3.3 N/A Inspection, Testing and Certification Schedule and Equipment Certifications
Within 5 working days prior to the beginning of each month and after performance of work
KO, COR As specified
1502000/3.4 N/A Other Recurring Services Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR As specified
1502000/3.4 N/A Other Recurring Services Program Summary Report
The first workday of each month
KO, COR As specified
1502001 Facility Investment – AA Facilities
1502000/2.2.1 N/A Certification and
At least 30 calendar days prior to contract start and upon request
1502000/3.1 N/A Summary of Competed and Unaccomplished Service Orders
The first workday of each month
1502000/3.1.1 N/A Emergency Service Order Status Report
Within 30 minutes of completion of work
1502001/3.3 N/A Mission Critical Support Systems Equipment Maintenance Program
At least 15 calendar days prior to contract start, then annually
KO/AAMDS
CO
As specified, annually
1502001/3.2 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
1502001/3.2 N/A Individual Equipment PM Program Work Schedule
At least 5 working days prior to the month scheduled, then monthly
KO, COR As specified, first working day of the month
1502001/3.3 N/A Monthly Preventive Maintenance Schedule
Monthly, first working day of the month prior to performance of work
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A Unaccomplished Maintenance Report
Monthly, first working day the following month.
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A Repair Status Report Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A Summary of Maintenance Accomplished Report
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - Casualty Reports (CASREPS)
Within 48 hours of identification of equipment malfunction or deficiency that cannot be corrected
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - Situation Reports (SITREPS)
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - Contractor Data System Reports
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - Quality Deficiency Reports (QDRs)
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - TEST Observation Reports (TORs)
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3 N/A MCSS Maintenance Data Report - Technical Feedback Reports (TFBRs)
Monthly, within 3 days following end of month
KO/AAMDS
CO, COR
As specified
1502001/3.3.3 N/A Generator Operational Logs
Available Upon Request
KO/AAMDS
CO, COR
As specified
1502001/3.3.4 N/A UPS Operational Logs Available Upon Request
KO/AAMDS
CO, COR
As specified
1502001/3.4 N/A Inspection, Testing and Certification Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO/AAMDS
CO, COR
As specified
1502001/3.4 N/A Inspection, Testing and Certification Schedule and Equipment Certifications
Within 5 working days prior to the beginning of each month and after performance of work
KO/AAMDS
CO, COR
1502001/3.4.3 N/A VTE Inspection, Testing and Certification Report
Within 5 working days after performance of work.
KO/AAMDS
CO, COR
As specified
1502000/3.5 N/A Other Recurring Services Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO/AAMDS
CO, COR
As specified
1503010 Custodial
1503010/2.3.1 N/A Pathogen Training Certificates
At least 15 calendar days prior to contract start and as changes occur
KO, COR As specified
1503010/3.1 N/A Annual Work Schedule
Annually, at least 15 calendar days prior to contract start and as changes occur
KO, COR As specified
1503010/3.1 N/A Monthly Work Plan Monthly, within 5 working days following end of month
KO, COR As specified
1503010/3.2 N/A Pressure Washing Services Plan
Annually, at least 15 calendar days prior to contract start and as changes occur
KO, COR As specified
1503010/3.3 N/A Unscheduled Services Report
Monthly, within 5 working days following end of month
KO, COR As specified
1503020 Pest Control
1503020/2.2.1 N/A Required Certification, Training and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1503020/2.3.1 N/A Required Business Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1503020/2.3.2 N/A Required Permits At least 30 calendar days prior to contract start and upon request
KO, COR As specified
1503020/2.3.4 N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
At least 15 calendar days prior to the start of work; thereafter every 50 hours of ULV equipment use.
KO, COR As specified
1503020/2.3.5 J-1503020-
Planned Pesticide Use Sheets including Pesticide Labels and Material Safety Data Sheets (MSDS)
With the Technical Proposal, proposed changes in pesticide usage at least 5 calendar days in advance of pesticide use
KO, COR As specified
1503020/3 J-1503020-
Contractor's Work Plan (CWP)
At least 15 calendar days prior to contract start
KO, COR As specified
1503020/3 N/A Report of Conditions Conducive to Pest Infestation
Within 1 working day after citing conditions
KO, COR As specified
1503020/3.1 N/A Stored Product Pest Survey (per the appropriate Pest Group Sheet)
Within one calendar day of the survey
1503020/3.1 N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag
Naval Hospital
Preventive Medicine
Dept
As specified
1503020/3.1 N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within one calendar day of the survey
KO, COR As specified
1503020/3.2.1 N/A Tick Survey Report (per the appropriate Pest Group Sheet)
Within one calendar day of the survey.
KO, COR As specified
1503020/3.2.1 N/A Tick Survey Report (per the appropriate Pest Group Sheet)Summary of Pest Control Service Orders
Monthly, within 5 calendar days following end of month
KO, COR As specified
1503020/3.3 J-1503020-
Pest Management Record
Monthly, electronically once per month by the 15th of the following month
KO, COR As specified
(Example:
July data must be submitted by August
15).
1503030
Integrated Solid Waste
(ISWM)
1503030/2.3.1 N/A Weight Tickets (Non- Recyclable)
Monthly with invoice KO, COR, IEPD
As specified
1503030/2.3.2 N/A Disposal Permits and Landfill Approval
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1503030/2.3.3 N/A Recyclable Accounting Receipts
Monthly with invoice KO, COR, IEPD
As specified
1503030/3 N/A Refuse Collection & Disposal and Recycling Services Tracking Report
Monthly with invoice KO, COR, IEPD
As specified
1503030/3.1 N/A Solid Waste Collection and Disposal Schedule
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
IEPD
As specified
1503030/3.1.1 N/A Collection Point Cleaning Schedule
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1503050 Grounds
Maintenance and
Landscaping
1503050/ 2.2.1 N/A Proof of Certification, Training, and Licensing
At least 15 calendar days prior to contract start and as changes occur
KO, COR As specified
1503050/3 J-1503050-
Organic Debris Recycling Weight Tickets
Monthly with invoice KO, COR As specified
1503050/3 N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
At least 15 calendar days prior to contract start and as soon as new material are added
1503050/3 N/A Contractor’s Work Schedule
At least 15 calendar days after award/Every 3 months, during the first week of each season
KO, COR As specified
1503060 Pavement Clearance
1503060/3.1 N/A Pavement Sweeping Services Plan
At least 15 calendar days prior to contract start, then annually
KO, COR As specified
1503060/3.2 N/A Snow and Ice Removal Plan
At least 15 calendar days prior to contract start, then annually
KO, COR As specified
1601000 Utility
1601000/2.5 N/A Utility Contingency Plans
At least 15 calendar days prior to contract start, then annually
KO, COR As specified
1601000/3.1.1 N/A Approved Excavation Permits
Within 2 working days after completion of markings
KO, COR As specified
1601000/3.1.3 N/A Utility Maps Within 10 days following notification of need or discovery of changed conditions
KO, COR As specified
1601000/3.1.4.1 N/A High Temperature Meter Reading Report
Last day of month KO, COR As specified
1601000/3.1.4.2 N/A Electrical Meter Reading Report
Last day of month KO, COR As specified
1601000/3.1.4.3 N/A Water Meter Reading Report
Last day of month KO, COR As specified
1601000/3.2.1 N/A Inventory Change Report
First working day of month
KO, COR As specified
1602000 Electrical
1602000/3 N/A Critical Spare Parts List
At least 15 calendar days prior to contract start
KO, COR As specified
1602000/3.1 N/A PM Program At least 15 calendar days prior to contract start, then annually
KO, COR As specified
1602000/3.1 N/A Monthly PM Schedule First working day of the month
KO, COR As specified
1602000/3.1 N/A Unaccomplished Maintenance Report
First working day of the month
KO, COR As specified
1602000/3.1 N/A Maintenance Repair Status Report
First working day of the month
KO, COR As specified
1602000/3.1 N/A Summary of Maintenance and Repair Accomplished Report
First working day of the month
KO, COR As specified
1604000 Wastewater
1604000/3 N/A Critical Spare Parts Inventory
At least 15 calendar days prior to contract start
KO, COR As specified
1604000/3 N/A Wastewater Discharge Report t
First working day of the month
KO, COR,
IEPD
As specified
1604000/3.1 N/A PM Program At least 15 calendar days prior to contract start
KO, COR As specified
1604000/3.1 N/A Monthly PM Schedule First working day of the month
KO, COR As specified
1604000/3.2 N/A Inspection Program and Schedule
At least 15 calendar days prior to contract start
KO, COR, As
1604000/3.2 N/A Inspection Report First working day of the month.
KO, COR,
IEPD
As specified
1604000/3.2.1 N/A Manhole Photographs and Report
Within 5 calendar days of after services completed
KO, COR,
IEPD
As specified
1604000/3.2.2 N/A Wet Well Photographs and Report
Within 5 calendar days of after services completed
KO, COR,
IEPD
As specified
1604000/3.3.1 N/A Schedule of Wet Well Services
At least 15 calendar days prior to contract start
KO, COR As specified
1604000/3.3.1.1 N/A Wet Well Volume Report
Within 5 calendar days of after services completed
KO, COR,
IEPD
As specified
1604000/3.3.1.2 N/A Wet Well Cleaning Report
Within 5 calendar days of after services completed
KO, COR,
IEPD
As specified
1606000 Water 1606000/2.2.1 N/A List of Key Personnel and Qualifications At least 15 calendar days prior to contract start, and as changes occur
KO, COR,
IEPD
As specified
1606000/2.2.2 N/A Proof of Certification, Training, and Licensing
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
IEPD
As specified
1606000/2.3.2 N/A Proficiency Testing Results
At least 15 calendar days of a contract term, then annually
KO, COR,
IEPD
As specified
1606000/3 N/A Outage Requests for Maintenance and Repairs
At least 5 working days prior to commencement of work
KO, COR,
IEPD
As specified
1606000/3 N/A Critical Spare Parts Inventory
At least15 calendar days prior to contract start
KO, COR As specified
1606000/3.1 N/A Water System Standard Operating Procedures
At least 15 calendar days prior to contract start and when modified
KO, COR As specified
1606000/3.1 N/A Notification of Unsafe Conditions Report
Within 24 hours of notification
KO, COR,
IEPD
As specified
1606000/3.1 N/A Water Use Contingency Plan
At least 15 calendar days prior to contract start
KO, COR As specified
1606000/3.1 N/A Wellhead Management Plan
At least 15 calendar days prior to contract start and when modified
KO, COR As specified
1606000/3.1.1.1 N/A Water Quality Sampling, Monitoring, and Reporting Plan
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1606000/3.1.1.2 N/A Water Quality Report Within 3 working days following the end of the month
KO, COR,
IEPD
As specified
1606000/3.1.1.2 N/A Fecal Coliform Reports
Within 3 working days following the end of the month
KO, COR,
IEPD
As specified
1606000/3.1.1.2 N/A Total Coliform Reports
Within 3 working days following the end of the month
KO, COR,
IEPD
As specified
1606000/3.1.3 N/A Operating Records Report
Within 3 working days following the end of the month
KO, COR,
IEPD
As specified
1606000/3.1.5 N/A Raw Water Collection System Monitoring and Maintenance Report
Within 3 working days following the end of the month
KO, COR,
IEPD
1606000/3.1.5 N/A Wellhead Protection Program
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1606000/3.2 N/A PM Program At least 15 calendar days prior to contract start
KO, COR As specified
1606000/3.2 N/A Monthly PM Schedule First working day of the month
KO, COR As specified
1606000/3.2 N/A Unaccomplished Maintenance Report
First working day of the month
KO, COR As specified
1606000/3.2 N/A Maintenance Repair Status Report
First working day of the month
KO, COR As specified
1606000/3.2 N/A Summary of Maintenance and Repair Accomplished Report
First working day of the month
1606000/3.3 N/A Inspection, Testing, and Certification Program and Schedule
At least 15 calendar days prior to contract start
KO, COR As specified
1606000/3.3 N/A Inspection, Testing, and Certification SummaryReport
First working day of the month following completion of work
KO, COR,
IEPD
As specified
1606000/3.4.1 N/A Emergency Water Service Plan
Within 5 calendar days of changes in status of water system
KO, COR,
IEPD
As specified
1700000 Base Support
Vehicles and Equipment
(BSVE)
1700000/3.1 N/A Critical Lift Plan Each occurrence of a critical lift
KO, COR As specified
1700000/3.1 N/A Copies of:
Driver Operator License, Operator Training Certificates, Rigger Training Certificates, Vehcile (Crane) Registration and Certification of Compliance, Rigging Certifications, Last Certified Mechanical Inspection, Vehicle Equipment Insurance
Each occurrence of WHE services
KO, COR As specified
1700000/3.3.1 N/A Proposed Contractor Provided NTV Delivery Schedule
At least 15 calendar days prior to contract start
KO, COR As specified
1700000/3.4 N/A Vehicle Accident Report
1 day following incident
KO, COR As specified
1700000/3.4.1 N/A Maintenance Schedule At least 15 calendar days prior to contract start
KO, COR As specified
1700000/3.4 N/A Vehicle Accident Report
1 day following incident
KO, COR As specified
1700000/3.4.1 N/A Maintenance Schedule Monthly, first working day of the month prior to performance of work
KO, COR As specified
1700000/3.2.2 N/A PM Schedule Monthly, first working day of the month prior to performance of work
KO, COR As specified
1800000 Environmental
1800000/2.2.1 N/A Documentation of Training
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1800000/3 N/A Hazardous Waste Management Plan
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1800000/3 N/A Spill Prevention and Response Plan
At least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1800000/3.1.2 N/A Used Oil Disposal and Recycling Summary Report
Annually, at least 15 calendar days prior to contract start
KO, COR,
IEPD
As specified
1800000/3.2.1 N/A Discarded
HM/HW/ORW
Daily/Weekly Logs
Within 1 working day of request
KO, COR,
IEPD
As specified
1800000/3.2.4 N/A Hazardous Waste Disposal Report
Within three working days after disposal services.
KO, COR,
IEPD
As specified
1800000/3.2.4 N/A Waste Profile Records Within three working days after disposal services.
KO, COR,
IEPD
As specified
1800000/3.4.1 N/A Spill Assessment Report
Within 30 minutes of arrival on site
KO, COR,
IEPD
As Required
1800000/3.4.3 N/A Spill Documentation Within 5 days of completing spill response
KO, COR,
IEPD
As Required
1800000/3.6 N/A Air Emissions Monitoring and Inventory
Annually, within 15 working days of new contract term
KO, COR,
IEPD
Required
Notes:
Note 1. All deliverables shall be in Microsoft Office (Word/Excel) electronic format unless otherwise specified.