This document is an Experience Information Sheet template designed for contractors to provide detailed information about past projects. The four-page template is structured to capture comprehensive project details across multiple sections, including contractor information, contract details, project specifics, work performance, obstacles encountered, and contract pricing. Key sections require information such as firm name, SAM UEI, contract number, project location, work performed (as prime or subcontractor), performance period, completion status, and contract pricing.

The template is intended to help contractors systematically document their previous project experiences, presumably for use in competitive bidding or qualifications submissions. Each project requires a separate four-page form, with sections prompting detailed descriptions of the project's scope of work, the contractor's specific roles and responsibilities, difficulties encountered, site conditions, performance periods, and an attestation of project completion. The form appears designed to provide a standardized method for contractors to comprehensively showcase their past performance and project management capabilities to potential clients or government agencies.

View the file

Other files

File Type Posted
092900 Gypsum - Copy.docx DOCX document
260526 Grounding and Bonding - Copy.docx DOCX document
283100 Fire Detection and Alarm - Copy.doc DOC document
38 LS - Copy.pdf PDF
Building 38 - As Built_Drawings - Copy.pdf PDF
013323 Shop Drawings - Copy.docx DOCX document
022113 Site Surveys - Copy.docx DOCX document
081710 Integrated Door Assemblies - Copy.docx DOCX document
092216 Non Structural Metal Framing - Copy.docx DOCX document
260533 Raceways and Boxes - Copy.docx DOCX document
38 32 Main Opening - Copy.pdf PDF
Bldg 32 Arch As Builts - Copy.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
WD-FL20260208 01-02-26.pdf PDF
013526 Safety Requirements Tampa Specific - Copy.docx DOCX document
015719 Temporary Environmental Controls - Copy.docx DOCX document
081400 Interior Wood Doors - Copy.docx DOCX document
090600 Schedule for Finishes - Copy.docx DOCX document
260511 Requirements for Electrical Installations - Copy.docx DOCX document
280500 Common Results Electronics Safety Security - Copy.docx DOCX document
014535 Special Inspections - Copy.docx DOCX document
015816 Temporary Interior Signage - Copy.docx DOCX document
096519 Resilient Tile Flooring - Copy.docx DOCX document
01321616 Network Analysis Schedule DB - Copy.docx DOCX document
014500 Quality Control - Copy.docx DOCX document
017419 Construction Waste Management - Copy.docx DOCX document
024100 Demolition - Copy.docx DOCX document
fire-38gfloor-Floor - Ansi C - Copy.pdf PDF
014219 Reference Standards - Copy.docx DOCX document
081113 Hollow Metal Doors and Frames - Copy.docx DOCX document
fire-32gfloor-Ansi C - Copy.pdf PDF
Schematic Design - Copy.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
096513 Resilient Base - Copy.docx DOCX document
260513 Medium Voltage - Copy.docx DOCX document
262726 Wiring Devices - Copy.docx DOCX document
010000 TIL General Specification - Tampa Specific - Copy.docx DOCX document
095100 Acoustical Ceiling - Copy.docx DOCX document
099100 Painting - Copy.docx DOCX document
260519 Low Voltage - Copy.docx DOCX document
262921 Enclosed Switches and Circuit Breakers - Copy.docx DOCX document
280513 Conductors and Cables for Electronic Safety Security - Copy.docx DOCX document
EMR 1 page.pdf PDF
36C24826Q0188_1.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

Project No. 1

A. CONTRACTOR INFORMATION OF AWARDED CONTRACT

Firm Name:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

B. CONTRACT INFORMATION

Contract Number:

Task Order Number (if applicable):

Award Date (mm/dd/yyyy):

C. PROJECT INFORMATION

Project Number:

Project Title:

Project Location:

D. WORK PERFORMED AS PRIME OR SUBCONTRACTOR

E. PERCENT OF PROJECT WORK PERFORMED BY YOUR COMPANY

F. IF YOU WERE A SUBCONTRACTOR, WHO WAS THE PRIME CONTRACTOR?

Firm Name:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

G. GOVERNMENT AGENCY/COMPANY WHICH AWARDED CONTRACT TO OFFEROR

Agency or Company Name:

Contracting Officer or Company POC:

Name:

Address:

Phone:

Email:

H. DESCRIPTION OF PROJECT'S SCOPE OF WORK AND OFFEROR'S SPECIFIC ROLES AND RESPONSIBILITIES

IN THE PROJECT

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement.

Detail how work performed is relevant to the effort required by the solicitation.

Use continuation page 4 for additional information if necessary.

I. DESCRIBE ANY DIFFICULTIES AND/OR OBSTACLES ENCOUNTERED DURING PROJECT PERFORMANCE

AND STEPS TAKEN TOWARD RESOLUTION

J. DESCRIBE DIFFERING SITE CONDITIONS AND HOW EACH WAS RESOLVED

K. PERFORMANCE PERIOD

Contract Start Date (mm/dd/yyyy) Original Completion Date

L. COMPLETION DATE

If not completed, why?

M. ATTESTING THE EXAMPLE PROJECT IS 100% COMPLETE?

N. INDICATE IF ANY OF THE PROJECT WAS TERMINATED, THE TYPE OF TERMINATION AND REASON FOR TERMINATION

O. CONTRACT PRICE

Award Amount:

Final Price (with mods):

Explain Difference:

CONTINUATION PAGE

P. ADDITIONAL INFORMATION

Project No. 2

A. CONTRACTOR INFORMATION OF AWARDED CONTRACT

Firm Name:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

B. CONTRACT INFORMATION

Contract Number:

Task Order Number (if applicable):

Award Date (mm/dd/yyyy):

C. PROJECT INFORMATION

Project Number:

Project Title:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

G. GOVERNMENT AGENCY/COMPANY WHICH AWARDED CONTRACT TO OFFEROR

Agency or Company Name:

Contracting Officer or Company POC:

Name:

Address:

H. DESCRIPTION OF PROJECT'S SCOPE OF WORK AND OFFEROR'S SPECIFIC ROLES AND RESPONSIBILITIES

IN THE PROJECT

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement.

Original Completion Date

L. COMPLETION DATE

Project No. 3

A. CONTRACTOR INFORMATION OF AWARDED CONTRACT

Firm Name:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

B. CONTRACT INFORMATION

Contract Number:

Task Order Number (if applicable):

Award Date (mm/dd/yyyy):

C. PROJECT INFORMATION

Project Number:

Project Title:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

G. GOVERNMENT AGENCY/COMPANY WHICH AWARDED CONTRACT TO OFFEROR

Agency or Company Name:

Contracting Officer or Company POC:

Name:

Address:

H. DESCRIPTION OF PROJECT'S SCOPE OF WORK AND OFFEROR'S SPECIFIC ROLES AND RESPONSIBILITIES

IN THE PROJECT

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement.

Original Completion Date

L. COMPLETION DATE

Project No. 4

A. CONTRACTOR INFORMATION OF AWARDED CONTRACT

Firm Name:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

B. CONTRACT INFORMATION

Contract Number:

Task Order Number (if applicable):

Award Date (mm/dd/yyyy):

C. PROJECT INFORMATION

Project Number:

Project Title:

Firm Address:

SAM UEI:

POC Name:

Phone:

Email:

G. GOVERNMENT AGENCY/COMPANY WHICH AWARDED CONTRACT TO OFFEROR

Agency or Company Name:

Contracting Officer or Company POC:

Name:

Address:

H. DESCRIPTION OF PROJECT'S SCOPE OF WORK AND OFFEROR'S SPECIFIC ROLES AND RESPONSIBILITIES

IN THE PROJECT

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement.

Original Completion Date

L. COMPLETION DATE

File details come from the government source that posted it. Updated .