Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DA--FY26: NRM (PROJ 673-26-112) DB Replace Fire Barrier Doors Buildings 32 and 38
Solicitation number
36C24826Q0188
Issued by

About this file

The file is a Base Offer Price Breakdown template for a VA construction project designed to capture detailed cost information across multiple construction divisions. The spreadsheet provides a comprehensive breakdown structure for labor and material costs, with designated sections for 34 distinct construction divisions including general requirements, concrete, masonry, electrical, HVAC, and utilities, alongside fields for calculating overhead, profit, and bond percentages.

This pricing template corresponds to VA Solicitation No. 36C24826Q0188, a design-build project for replacing fire barrier doors at Buildings 32 and 38 located at James A. Haley VA Hospital in Tampa, Florida. The project (Project #673-26-112) requires replacing two drop-down fire doors with fire-rated swing double doors, involving site investigation, design, demolition, construction, and installation. The solicitation indicates a quote due date of 02/16/2026 at 10:00 AM EST, with potential work during weekend, holiday, evening, and night hours to minimize disruption in high-traffic areas.

View the file

Other files

File Type Posted
WD-FL20260208 01-02-26.pdf PDF
013526 Safety Requirements Tampa Specific - Copy.docx DOCX document
015719 Temporary Environmental Controls - Copy.docx DOCX document
081400 Interior Wood Doors - Copy.docx DOCX document
090600 Schedule for Finishes - Copy.docx DOCX document
260511 Requirements for Electrical Installations - Copy.docx DOCX document
280500 Common Results Electronics Safety Security - Copy.docx DOCX document
014535 Special Inspections - Copy.docx DOCX document
015816 Temporary Interior Signage - Copy.docx DOCX document
096519 Resilient Tile Flooring - Copy.docx DOCX document
Experience information Sheet.pdf PDF
092900 Gypsum - Copy.docx DOCX document
260526 Grounding and Bonding - Copy.docx DOCX document
283100 Fire Detection and Alarm - Copy.doc DOC document
38 LS - Copy.pdf PDF
Building 38 - As Built_Drawings - Copy.pdf PDF
013323 Shop Drawings - Copy.docx DOCX document
022113 Site Surveys - Copy.docx DOCX document
081710 Integrated Door Assemblies - Copy.docx DOCX document
092216 Non Structural Metal Framing - Copy.docx DOCX document
260533 Raceways and Boxes - Copy.docx DOCX document
38 32 Main Opening - Copy.pdf PDF
Bldg 32 Arch As Builts - Copy.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
01321616 Network Analysis Schedule DB - Copy.docx DOCX document
014500 Quality Control - Copy.docx DOCX document
017419 Construction Waste Management - Copy.docx DOCX document
024100 Demolition - Copy.docx DOCX document
fire-38gfloor-Floor - Ansi C - Copy.pdf PDF
014219 Reference Standards - Copy.docx DOCX document
081113 Hollow Metal Doors and Frames - Copy.docx DOCX document
fire-32gfloor-Ansi C - Copy.pdf PDF
Schematic Design - Copy.pdf PDF
096513 Resilient Base - Copy.docx DOCX document
260513 Medium Voltage - Copy.docx DOCX document
262726 Wiring Devices - Copy.docx DOCX document
010000 TIL General Specification - Tampa Specific - Copy.docx DOCX document
095100 Acoustical Ceiling - Copy.docx DOCX document
099100 Painting - Copy.docx DOCX document
260519 Low Voltage - Copy.docx DOCX document
262921 Enclosed Switches and Circuit Breakers - Copy.docx DOCX document
280513 Conductors and Cables for Electronic Safety Security - Copy.docx DOCX document
EMR 1 page.pdf PDF
36C24826Q0188_1.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .