This is a Department of Veterans Affairs (VA) Request for Quote (RFQ) for a design-build project to replace fire barrier doors at the James A. Haley VA Hospital in Tampa, Florida. The solicitation (No. 36C24826Q0188) is a two-phase design-build procurement 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated contract value between $150,000 and $200,000. The project involves replacing two drop-down fire doors with fire-rated swing double doors in Buildings 32 and 38, including site investigation, design, drawings, specifications, demolition, construction, and installation, with doors programmed to close automatically when smoke detectors are triggered.

Key dates include a site visit on 01/16/2026, Request for Information (RFI) due by 01/23/2026, and Phase I Quotes due on 02/16/2026. The contract period is 270 calendar days, with design submission milestones and specific requirements for coordination, safety, infection control, and compliance with VA technical specifications. Contractors must be registered in the Small Business Search and System for Award Management databases, provide performance and payment bonds, and comply with Davis-Bacon wage determination standards. Evaluation will be based on technical factors including team qualifications, experience, past performance, management approach, and schedule, with technical factors considered more important than price.

View the file

Other files

File Type Posted
WD-FL20260208 01-02-26.pdf PDF
013526 Safety Requirements Tampa Specific - Copy.docx DOCX document
015719 Temporary Environmental Controls - Copy.docx DOCX document
081400 Interior Wood Doors - Copy.docx DOCX document
090600 Schedule for Finishes - Copy.docx DOCX document
260511 Requirements for Electrical Installations - Copy.docx DOCX document
280500 Common Results Electronics Safety Security - Copy.docx DOCX document
014535 Special Inspections - Copy.docx DOCX document
015816 Temporary Interior Signage - Copy.docx DOCX document
096519 Resilient Tile Flooring - Copy.docx DOCX document
Experience information Sheet.pdf PDF
092900 Gypsum - Copy.docx DOCX document
260526 Grounding and Bonding - Copy.docx DOCX document
283100 Fire Detection and Alarm - Copy.doc DOC document
38 LS - Copy.pdf PDF
Building 38 - As Built_Drawings - Copy.pdf PDF
013323 Shop Drawings - Copy.docx DOCX document
022113 Site Surveys - Copy.docx DOCX document
081710 Integrated Door Assemblies - Copy.docx DOCX document
092216 Non Structural Metal Framing - Copy.docx DOCX document
260533 Raceways and Boxes - Copy.docx DOCX document
38 32 Main Opening - Copy.pdf PDF
Bldg 32 Arch As Builts - Copy.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
01321616 Network Analysis Schedule DB - Copy.docx DOCX document
014500 Quality Control - Copy.docx DOCX document
017419 Construction Waste Management - Copy.docx DOCX document
024100 Demolition - Copy.docx DOCX document
fire-38gfloor-Floor - Ansi C - Copy.pdf PDF
014219 Reference Standards - Copy.docx DOCX document
081113 Hollow Metal Doors and Frames - Copy.docx DOCX document
fire-32gfloor-Ansi C - Copy.pdf PDF
Schematic Design - Copy.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
096513 Resilient Base - Copy.docx DOCX document
260513 Medium Voltage - Copy.docx DOCX document
262726 Wiring Devices - Copy.docx DOCX document
010000 TIL General Specification - Tampa Specific - Copy.docx DOCX document
095100 Acoustical Ceiling - Copy.docx DOCX document
099100 Painting - Copy.docx DOCX document
260519 Low Voltage - Copy.docx DOCX document
262921 Enclosed Switches and Circuit Breakers - Copy.docx DOCX document
280513 Conductors and Cables for Electronic Safety Security - Copy.docx DOCX document
EMR 1 page.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24826Q0188

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24826Q0188 673-26-112 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637

DAVID HERNANDEZ

813-893-3904 PROJECT TITLE: DB Replace Fire Barrier Doors Buildings 32 and 38

PROJECT NUMBER: 673-26-112

PROJECT LOCATION: James A. Haley VA Hospital, 13000 BruceB. Downs Boulevard, Tampa, Florida, 33612

This solicitation is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).

As stated elsewhere in this solicitation, this procurement is a two (2) Phase Design/Build IAW FAR Part 36.3.

One solicitation will be issued covering both phases. In Phase I quotes will be evaluated to determine which offeror will submit quotes in Phase II. Block 13A refers to Phase 1 QUOTES

SITE VISIT: 01/16/2026 09:00 AM EST. Meeting location is Building 42.

RFIs DUE DATE: 01/23/2026, at 10:00 AM EST.

PHASE I QUOTES DUE DATE: 02/16/2026 at 10:00 AM EST

AT THE TIME OF QUOTE SUBMISSION, interested contractors MUST be actively registered in the following databases.

Small Business Search https://search.certifications.sba.gov/ System for Award Management: HTTPS://WWW.SAM.gov | Home The current Davis Bacon determination is General Decision Number: FL All VA Medical Facilities are smoke free. Smoking is not permitted anywhere on the JAHVAMC Campus

X

FAR 52.211-10

X

10:00AM

EST

02-16-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 David Hernandez

CONTRACTING OFFICER

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
INSTRUCTIONS TO OFFERORS6
STATEMENT OF WORK11
A.3 PRICE/COST SCHEDULE21
ITEM INFORMATION21
A.4 DELIVERY SCHEDULE21
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS22
2.1 52.216-1 TYPE OF CONTRACT (DEVIATION) (NOV 2025)22
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)22
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)22
2.4 52.228-1 BID GUARANTEE (SEP 1996)23
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)24
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)24
2.7 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)28
2.8 52.246-26 REPORTING NONCONFORMING ITEMS (AUG 2024)28
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)31
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)31
2.11 PARTNERING32
REPRESENTATIONS AND CERTIFICATIONS32
GENERAL CONDITIONS32
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)32
4.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)32
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)33
4.4 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)36
4.5 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)40
4.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)49
4.7 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)50
4.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)52
4.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)55
4.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)56
4.11 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)57
4.12 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)58
4.13 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)59
4.14 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)60
4.15 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)61
4.16 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)61
4.17 IT CONTRACT SECURITY63
DESIGN BUILD SPECIFICATIONS72
4.18 GENDER72
4.19 CONTRACTOR'S COST BREAKDOWN72
4.20 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES73
4.21 OWNERSHIP OF ORIGINAL DOCUMENTS73
4.22 RETENTION OF REVIEW DOCUMENTS73
4.23 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION73
4.24 COORDINATION WITH MEDICAL CENTER74
4.25 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR74
ATTACHMENTS75
See attached document: EMR 1 page.75
See attached document: Base Offer Price Breakdown - 1 page.75
See attached document: PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.75
See attached document: Schematic Design - Copy.75
See attached document: fire-32gfloor-Ansi C - Copy.75
See attached document: Bldg 32 Arch As Builts - Copy.75
See attached document: 38 32 Main Opening - Copy.75
See attached document: 280513 Conductors and Cables for Electronic Safety Security - Copy.75
See attached document: 262921 Enclosed Switches and Circuit Breakers - Copy.75
See attached document: 260533 Raceways and Boxes - Copy.75
See attached document: 260519 Low Voltage - Copy.75
See attached document: 099100 Painting - Copy.75
See attached document: 096519 Resilient Tile Flooring - Copy.75
See attached document: 095100 Acoustical Ceiling - Copy.75
See attached document: 092216 Non Structural Metal Framing - Copy.75
See attached document: 081710 Integrated Door Assemblies - Copy.75
See attached document: 081113 Hollow Metal Doors and Frames - Copy.75
See attached document: 022113 Site Surveys - Copy.75
See attached document: 015816 Temporary Interior Signage - Copy.75
See attached document: 014535 Special Inspections - Copy.75
See attached document: 014219 Reference Standards - Copy.75
See attached document: 013323 Shop Drawings - Copy.75
See attached document: 010000 TIL General Specification - Tampa Specific - Copy.75
See attached document: fire-38gfloor-Floor - Ansi C - Copy.75
See attached document: Building 38 - As Built_Drawings - Copy.75
See attached document: 38 LS - Copy.76
See attached document: 283100 Fire Detection and Alarm - Copy.76
See attached document: 280500 Common Results Electronics Safety Security - Copy.76
See attached document: 262726 Wiring Devices - Copy.76
See attached document: 260526 Grounding and Bonding - Copy.76
See attached document: 260513 Medium Voltage - Copy.76
See attached document: 260511 Requirements for Electrical Installations - Copy.76
See attached document: 096513 Resilient Base - Copy.76
See attached document: 092900 Gypsum - Copy.76
See attached document: 090600 Schedule for Finishes - Copy.76
See attached document: 081400 Interior Wood Doors - Copy.76
See attached document: 024100 Demolition - Copy.76
See attached document: 017419 Construction Waste Management - Copy.76
See attached document: 015719 Temporary Environmental Controls - Copy.76
See attached document: 014500 Quality Control - Copy.76
See attached document: 013526 Safety Requirements Tampa Specific - Copy.76
See attached document: 01321616 Network Analysis Schedule DB - Copy.76
See attached document: Experience information Sheet.76
See attached document: WD-FL20260208 01-02-26.76
ATTACHMENT 1 - RELEASE OF CLAIMS76

INSTRUCTIONS TO OFFERORS

REQUEST FOR QUOTE SOLICITATION NO. 36C24826Q0188

ISSUE DATE: 01/07/2026, PHASE I QUOTE DUE DATE: 02/16/2026 at 10:00 AM EST

PROJECT NUMBER: 673-26-112.

PROJECT TITLE: Design Build – Replace Fire Barrier Doors Buildings 32 and 38 PROJECT LOCATION: James A. Haley VA Hospital, 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612.

PROJECT SUMMARY CONTRACT SHALL: Furnish all necessary professional services, equipment, labor materials, supervision, tools, testing, and specialty services to perform a design-build for the NRM Project # 673-26-112, REPLACING TWO DROP-DOWN FIRE DOORS AT THE CONNECTIONS OF BUILDING 32 AND BUILDING 38 WITH FIRE-RATED SWING DOUBLE DOORS. The work includes, but is not limited to site investigation, design and preparation of drawings, phase planning, specifications, demolition, construction, and installation. These doors shall be held open, programmed to close automatically when the adjacent smoke detectors go off. Due to the high-traffic areas of work, some work may need to be completed during WHEN (Weekend, Holiday, Evening, and Night) hours. The DB Team is to include subcontractors performing professional services under this contract and shall perform its services consistent with the professional skill and care ordinarily provided by architects/engineers practicing in the same or similar locality under the same or similar circumstances. This will require licensing and certifications in line with the design and fire certification requirements. The DB Team shall perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of the project description in the SOW.

OFFICE ISSUING THIS REQUEST:

Department of Veterans Affairs Network Contracting Office (NCO) 8 Point of Contact (POC): David Hernandez Email: David.hernandez1@va.gov Phone: (813) 893-3904

PART I – GENERAL INFORMATION

1. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.

2. DEFINITIONS:

a) Design-Build (D/B) as defined by the Department of Veterans Affairs (VA) is procurement by the Government, under one contract, with one firm or joint venture (JV) as identified in your basic contract, for both design and construction services for a specific project.

b) Contracting Officer Representative (COR): The COR is responsible for administering contracts under the immediate direction of the Contracting Officer.

c) Design Build Contract: This term, as used herein, refers to the Contract to perform the design and construction of the project.

d) Contractor: This term, as used herein, refers to the contractor under this contract or the D/B team.

e) AE: This term, as used herein, refers to the Architect-Engineer firm(s)that are a part of the D/B team, also referred to as D/B/AE.

3. MAGNITUDE OF CONSTRUCTION: Between $150,000 and $200,000.00.

4. SITE VISIT: An organized site visit is planned for 01/16/2026 AT 0900 AM EST. Meeting location is Building 42 at which point the group will make its way to the site visit location. Please contact Engineering Tech Roy Mason at Roy.Mason@va.gov confirm attendance Technical questions are not allowed during the site visit. Please record your questions and submit them to the Contracting Officer as an RFI by the date indicated in #6 below.

5. OFFER ACCEPTANCE PERIOD: Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

6. REQUESTS FOR INFORMATION: Requests for Information (RFIs) shall be submitted by the prime contractor through email only to david.hernandez1@va.gov No solicitation questions will be accepted in any other format. Do not discuss project requirements with any Tampa VAMC technical staff during solicitation Phases I and II. The cutoff for submission of RFIs for Phase I is 01/23/2026, at 10:00 AM EST. Send RFIs only to the Contracting Officer do not include VA technical representatives. Responses will be provided through an Amendment posted to SAM.gov in a Question & Answer format visible to all offerors.

7. SPECIFICATIONS AND DRAWINGS: All applicable specifications and drawings, if available, will be provided electronically in SAM.gov as attachments to this RFP. No hard copies will be made available to proposing contractors.

8. SDVOSB VERIFICATION: SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS VERIFICATION(SDVOSB): Subsequent contracts are 100% set asides for verified SDVOSB. The award of this requirement shall not be delayed due to loss of SDVOSB verification. Quotes submitted by non-certified by Small Business Search https://search.certifications.sba.gov/ shall be excluded from award consideration.

9. LIMITATIONS ON SUBCONTRACTING: (Reference Contract Clause VAR 852.219-75 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees.

10. FUNDS: Funds are not presently available for this contract. (Reference Contract Clause FAR 52.232-18).

11. BONDS: (Reference Contract Clause FAR 52.228-15 for further information on applicability): A payment and performance bond shall be provided. The penal sum shall be one hundred percent (100%) of order price. Bonds and other payment protection shall be provided within 10 calendar days of award of the Contract. The Notice to Proceed will not be issued until the Contractor provides sufficient bonding to cover the work being performed. Provide electronically only. NCO 8 no longer accepts bonds through the mail.

12. OFFER GUARANTEE (BID BOND) (SUBMIT WITH YOUR PRICE QUOTES): Per FAR Clause 52.228- 1-Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price Or $3,000,000, whichever is less. Provide with price Quotes.

13. SAFETY AND ENVIRONMENTAL RECORD (SUBMIT WITH QUOTES): Offerors shall submit information that specify the contractor in question has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past three (3) years and has an Experience Modification Rate (EMR) that shall not exceed 1.0. If there is no EMR, state the reason way no EMR is available. EMR greater than 1.0 will not be acceptable. Offerors are required to complete and submit attached Past safety and environmental record or any other form that provided the above information. Offerors with an EMR greater than 1.0 will be considered ineligible and will not be evaluated.

14. WAGE DETERMINATION: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current determination is General Decision FL20260208 dated 01/02/2026. Be advised the determination that is current at the time of the Contract award is the determination that will apply for the project. Current determinations are always available at: http://www.sam.gov/.

15. CONTRACT PERFORMANCE PERIOD: 270 calendar days after receipt of written Notice to Proceed performed in concurrent or sequential phases as indicated or required. If you anticipate long lead times for project materials, state this in the technical QUOTE with your anticipated lead time for the specific item.

16. WORK ELEMENT NO. 1 (Design Build Effort Required): Contractor shall develop project design documentation including drawings, specifications, design analysis etc. per the Statement of Work. Upon completion of design, and upon acceptance by the Government, construction execution shall commence and be completed in accordance with contract requirements.

PART II – QUOTE PREPARATION AND EVALUATION INFORMATION

1. This RFP addresses both the Phase I and Phase II QUOTE requirements. Do not submit the pricing information requested in Phase II with the Phase I Quotes.

2. The Phase I Quotes’ will be evaluated to determine which offerors will be invited to submit Phase II technical and price Quotes’.

3. A maximum of five (5) most highly rated Phase I Quotes will be invited to submit a Phase II Quote.

4. Prospective vendors shall provide their QUOTE in any of the following formats: .pdf, .docx, or .doc to the issuing office address identified above. All technical Quotes and the price QUOTE shall be provided via email to david.hernandez1@va.gov . The technical QUOTE shall address each of the evaluation criteria.

5. During Phase II, the price QUOTE shall be provided as a separate file from the technical Quote. The price QUOTE shall include a copy of the vendor’s SDVOSB registration information, a copy of the vendor SAM.gov registration information, A COPY OF VETS 4212, and a price sheet with pricing on the statement of items. While there is no page limit to the price Quote, it shall also be on 8 ½” x 11” pages, when printed. The price breakdown shall be filled out in its entirety.

6. QUOTE Format: Technical QUOTE Format. Technical Quotes for Phases I and II shall address all information requested and will then be evaluated against the stated factors. General Information Required for Technical QUOTE is: Cover Page with Phase Number (I or II), Solicitation Number, Project Title, Project Number; Company Name, Address, POC Name, Email, Phone Number, SAM UEI and Tax ID. Include a Table of Contents with distinct separation of technical factors.

Price QUOTE Format. The Price QUOTE will contain all general information listed above for the technical Quotes along with:

· Signed offer/Acknowledgement of Amendments

· Copy of current VetCert, Copy of current VETS 4212 and SAM certification.

· PRICE/COST SCHEDULE filled in with total price

· Breakdown of pricing using Project Price Breakdown form provided only in Phase II

TECHNICAL FACTORS FOR PHASE I

FACTORS 1 THROUGH 3 ARE BELOW:

FACTOR 1 - Contractor Team and Personnel Qualifications Professional qualifications necessary for the satisfactory performance of a design-build for Project #673-26-112, REPLACING TWO DROP-DOWN FIRE DOORS AT THE CONNECTIONS OF BUILDING 32 AND BUILDING 38 WITH FIRE-RATED SWING DOUBLE DOORS " at the James A. Haley VA Hospital as required under this project. Briefly describe the team's specialized experience, technical competence, and expertise in understanding how to complete the design in a hospital setting in accordance with the submitted SOW, the VA TIL specifications.

Formatting and Other Restrictions: The submission is limited to 10, 8-1/2” x 11” pages in total.

FACTOR 2 - Specialized Experience and Capability Relevant experience and technical competence as it applies to the scope of work, in addition to experience in the geographical area of the project and knowledge of the locality. The offeror is required to submit FOUR (4) relevant example projects demonstrating your firm’s experience and capability similar to this requirement per the Statement of Work provided. The offeror must demonstrate their firm have the qualifications necessary for the satisfactory performance as indicated for this project Statement of Work (SOW), VA TIL specifications. These demonstrations in similar experience and capability shall be in a healthcare environment with critical activities for these capability areas: Cost control, quality of work and compliance with performance schedules on a project of similar scope and size. The offeror is required to demonstrate recent (within the last five years) successful performance under contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the subject requirement. Relevancy is defined as work of a similar nature regarding site preparation for construction and of a similar magnitude in cost.

Formatting and Other Restrictions: Must use attached form titled Experience Information Sheet, 16 pages total.

FACTOR 3 – Relevant Past Performance For each project referenced in Factor 2, provide the completed Contractor Performance Assessment Reporting System (CPARS) records for those projects. Each offeror will be evaluated on its performance for similar types of projects. The government will focus on information that demonstrates quality of performance relative to the size and complexity of the procurement. Government also reserves the right to evaluate past performance on previously awarded contracts and other information that may be available. If CPARS records are unavailable submit past performance information using the attached Past Performance Questionnaire forms. Include the contract number, period of performance, and agency point of contact information. The Contracting Officer may utilize any other means necessary to evaluate past performances, such as customer surveys and prior experience with contractor. Do not provide forms completed for prior solicitations.

Formatting and Other Restrictions: Limited to CPARS records or Past Performance Questionnaire. No PPQ older than 12 months will be accepted.

TECHNICAL FACTORS FOR PHASE II

Factors 4 and 5 are below:

FACTOR 4 - Management Approach and Key Personnel Narrative

1. Identify Key Personnel assigned to this project

a) Submit an organizational chart and narrative - Clearly describe the prime responsible firm and individuals as well as the roles and responsibilities of individuals proposed as consultants and sub-contractors.

b) Include a narrative that describes the relevant experience of: Firm's Key personnel and experience, to include at least:

· Project Manager’s similar projects worked on and education and/or certification(s).

· Field Superintendent’s similar projects worked on and education and/or certification(s).

· Other Relevant Firm Employees’ similar projects worked on, and education and/or certification(s).

· Overall, Team: Discuss the planned use of:

· Subcontractors: Key trades to be subcontracted, proposed subcontractors (if firms already determined), and a similar project worked on.

· Architect-Engineering (A/E) Firm supporting the DB Team: Submit SF 330's of key A/E Personnel. Submit a copy of current, valid Architect & Engineer's Licenses issued by the State of Florida, Architectural Contractor, who will be of record, Architect-Engineer Field Representative., and Similar projects worked on.

Formatting and Other Restrictions: The submission is limited to 10, 8-1/2” x 11” pages (SF 330’s are not included in page total.

FACTOR 5 - Schedule

1. Schedule Narrative: Describe in detail how your company will meet the schedule without causing disruptions to the facility during normal business hours, nights, and weekends. Also, describe actions to be taken by the offeror if completion of work is anticipated to fall behind schedule. Describe any technical difficulties that may be encountered in a project of this type and preventative measures or solutions to overcome these issues.

2. The offeror is required to submit a proposed progress schedule in a time-scaled bar graph format. The horizontal axis will be scaled for the time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All scheduled items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process. The contractor must certify that it will meet the period of performance for the design (negotiable to a shorter time frame).

Formatting and Other Restrictions: The submission is limited to 10, 8-1/2” x 11” pages in total.

PRICING

FACTOR 6: The Government will evaluate price based on the total price. Contractor SHALL complete the Base Offer Price Breakdown which will be included with the Phase II request for Quotes. The price QUOTE shall show direct and indirect project price breakdown. The price breakdown shall reflect the Base proposed items using, at a minimum, the following cost elements:

· Labor (Direct & Indirect),

· Materials, Material Markups, Materials overhead,

· Equipment

· Subcontractor Cost

· Travel

· Other Direct Costs

· Overhead expenses

· Indirect Cost

· General & Administrative (G&A) expenses

· Profit Technical Evaluations - All technical factors when combined are more important than price.

COST QUOTE- Offerors are advised that if the technical Quotes are essentially equal, award will be made on the basis of the lowest cost.

PART III – AWARD

1. The Government will evaluate Quotes submitted in response to this solicitation which meet the requirements that have been provided in Parts I and II above.

2. This procurement will be a single award on a trade-off basis resulting from this solicitation to the responsible offeror.

3. Award may be made without discussions, except for minor clarifications.

Page 1 of Page 1 of

STATEMENT OF WORK

Replace Fire Barrier Doors Buildings 32 and 38 673-26-112

POP IS 270 DAYS.

I. SCOPE OF WORK:

Furnish all necessary professional services, equipment, labor materials, supervision, tools, testing, and specialty services to perform a design-build for the NRM Project # 673-26-112, REPLACING TWO DROP-DOWN FIRE DOORS AT THE CONNECTIONS OF BUILDING 32 AND BUILDING 38 with fire-rated swing double doors. The work includes, but is not limited to site investigation, design and preparation of drawings, phase planning, specifications, demolition, construction, and installation. These doors shall be held open, programmed to close automatically when the adjacent smoke detectors go off. Due to the high-traffic areas of work, some work may need to be completed during WHEN (Weekend, Holiday, Evening, and Night) hours. The DB Team is to include subcontractors performing professional services under this contract and shall perform its services consistent with the professional skill and care ordinarily provided by architects/engineers practicing in the same or similar locality under the same or similar circumstances. This will require licensing and certifications in line with the design and fire certification requirements. The DB Team shall perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of the project.

The design phases will include 50%, 90%, and 100% review stages. This includes drawings, narrative, and specifications. Specifications must meet Building codes, TIL requirements, and facility standards to include those attached in this contract and other applicable requirements. All non-compliant submissions will be rejected and returned to the DB Team for correction prior to advancing to the next schedule milestone. During review meetings, the D/B Team will be required to take meeting minutes and distribute to the VA for approval and incorporated into the project documentation for record.

If available, the VA will provide requested As-Built drawings (in either AutoCAD, PDF, or JPG form) electronically to the A/E as reference for design purposes. The existing drawings on file at the VA may not be 100% accurate and may not exactly reflect the current conditions of the James A. Haley VA Hospital. It is the responsibility of the A/E to review the existing drawings and field-verify the existing conditions.

A. Project Description:

Provide design and construction services to replace two drop-down doors with fire-rated swing doors as shown in the attached drawing. Opening 1 is at the connection of Buildings 32 and 38 in the main hallway. Opening 2 connects these two buildings near the Radiation Therapy unit waiting area. The demolition for opening 2 shall also include the set of non-rated double doors and frames. The new fire doors shall be placed in the location of the existing non-rated doors. Removal of the drop-down doors will require demolition of the door assembly above ceiling. In addition to the installation of the new doors, drywall work will be required to refinish the areas and ensure the barrier between the two buildings maintains the proper fire rating (both above and below ceiling). There is currently one smoke detector near each opening. A second one on the opposite side of the opening in both locations will be required. The two new smoke detectors must be tied into the Johnson Controls fire alarm system. Additionally, all four smoke detectors must be directly connected to the doors to trigger the closure in case of fire. Flooring work to maintain safe transitions between the two buildings may be required. Contractor is required to perform value engineering if required to stay with project funding limitations.

The DB Team shall evaluate the project areas to determine if utilities or any other objects will need to be relocated or addressed in the design. The DB Team shall include a detailed containment plan for infection control for this design. This plan shall be detailed showing locations and what infection control requirements are to be used for each area. The HPMs for Safety and Infection Control will be provided to the D/B Team for their use. Temporary hard construction barriers, such as STARC panels or similar, will be required for the duration of the construction to isolate patients and staff from dust, debris and construction hazards as determined by the Safety Officer and Infection Control representatives. The D/B Team will also have to indicate these construction barriers on their drawings.

B. Design Tasks:

1. SITE INVESTIGATION: Design Services shall conduct a site survey of the project area to ensure design feasibility and remove/avoid major obstacles. Available as–built drawings and related other project drawings are available to the DB Team, but field verification by the DB Team must be completed to verify existing site conditions and to collect data as required for design development work to successful completion of design and construction documents.

2. DEMOLITION: The project demolition work may include structural, architectural, mechanical, plumbing, and electrical demolition to clear space for the new systems. No equipment shall be left abandoned in place or create dead legs.

3. CIVIL / STRUCTURAL: Work may include architectural modification and structural work. Structural engineering is expected to be completed by a Florida Licensed Structural Engineer for any needed structural reinforcements. The D/B team shall proceed with a structural design that will not impede on pedestrian traffic in patient areas.

4. ARCHITECTURAL: Field verification of elevations and architectural dimensions are crucial to the success of this project, as the existing drawings are best represented.

Patient and Family Centered Care concepts are to be included in the design of this project. These concepts are outlined in the VA technical information library design guide documents. See paragraph I.D.2 for additional information.

5. INTERIOR DESIGN: The VA Interior Designer will perform all interior color and material selections from the D/B Team’s recommended items. The D/B team will coordinate all interior selections with the VA interior design staff.

6. ELECTRICAL: The D/B team must evaluate the electrical systems serving the design scope area to determine if there is enough, and provide modifications and extensions to the existing electrical systems, security system, communications system, fire / safety system, controls, etc. as needed and with available capacity.

7. PLUMBING/PIPING: If necessary, relocation of piping may be needed in certain areas.

8. HEATING, VENTILATION, AND AIR CONDITIONING (HVAC): If necessary, relocation of piping or ductwork may be needed in certain areas.

9. EQUIPMENT: The D/B Team shall coordinate the design work directly with the suppliers / manufacturers of the new equipment to produce a completely designed operational project. All drawings, schematics, and other data available from the equipment suppliers shall be incorporated in the A/E drawings and specifications. The D/B Team is to determine the points of connection between old and new equipment and clearly detail these connections on the drawings.

10. Design the project by using site measurements and verifying site conditions. The D/B Team shall not rely solely on the As–Built drawings.

11. The D/B Team shall provide other documentation (i.e., calculations, reports, recommendations, etc.) that is appropriate to support the design effort and to keep the Government fully informed of all issues or potential problems. Provide computations and sizing calculations for any anticipated new loads, altered loads, and existing loads for electrical, mechanical (HVAC, plumbing, medical gas and steam), sanitary, structural and fire protection designs. For computerized calculations, submit complete and clear documentation of computer programs, interpretation of input / output, and description of program procedures. Provide an investigation and explanation of code requirements incorporated into the design. Furnish a copy of each code quoted or used in the design, when necessary to provide additional understanding of design decisions.

12. The D/B Team shall provide all schedules and tables used on the drawings in MS Excel.

C. Additional Requirements and Information:

1. LIFE SAFETY: Requirement for acquiring and incorporating a Certified Independent Third-Party Safety Professional review of design documents. The D/B Team shall design the necessary Life Safety and Interim Life Safety provisions for impacted areas, both temporary and permanent measures. The D/B Team shall provide and coordinate the review of the Life Safety Provisions of the project design with a third party, independent licensed Fire Protection Engineer. The following areas will be reviewed by the third party:

a. NFPA Code Compliance

b. Environmental / EPA Impacts, Permits, etc.

c. OSHA Compliance (i.e., Excavation, Demolition, etc.)

d. Security Property / Infrastructure Management, Homeland Security, etc.

e. Emergency preparedness

f. Disability Accessibility Compliance

g. National and Local Codes. The D/B Team shall deliver a letter certifying compliance with all Life Safety Codes and Requirements applicable to this project from the third party.

In addition, it is required that the D/B Team update all Life Safety Drawings associated with the designed space and affected by the project.

2. NOTES: NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101, and documents referenced by NFPA 101 in order to comply with the accreditation requirements of the joint Commission. Therefore, designs shall comply with the requirements of the latest edition of NFPA 101, and documents referenced therein. Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above in this Program Guide. For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by NFPA 101 shall be used exclusively. This applies even if the IBC requirements are different.

3. Conflicts between Nationally Recognized Codes and Standards and VA Requirements: Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for the VA to ensure a consistency system wide.

4. DRAWINGS: The A/E shall provide electronic copies of drawings at each review step generated in the latest version of AutoCAD and REVIT or their companion products (digitally signed DWGs) and PDF format in individual sheet files. Include all associated support files (i.e. plot styles, external referenced files, etc.). This facility currently uses AutoCAD 2025. The standard drawing size shall be ARCH E1 (30” x 42”). The format to be used in creating the CAD drawings (i.e. layer / level structure, fonts, font sizing, file naming conventions, etc.) is that of the latest edition of the National CAD Standard (www.nationalcadstandard.org).

a. The D/B Team shall follow these level / layer formats, file – naming conventions, and symbol library.

b. Drawings are to be drawn from the VA’s “As Built” or construction drawings updated by site verification, not scanned reproductions.

c. The final sets of the new construction drawings shall be sealed (embossed & ink stamps) and signed by each respective Professional Engineer in their discipline, Industrial Hygienist, Architect and other necessary licensed professional consultants.

d. At each design submission, two half-size hard copies of the drawings shall be provided to the VA. One full-size and one half-size copy of the as-builts shall be provided to the VA at the end of the project.

5. SPECIFICATIONS: The D/B Team may obtain the list of the complete VA Construction Specifications from the VA Facilities Management Technical Information Library (TIL), which is located at http://www.cfm.va.gov/TIL/spec.asp#02. The Tampa VA has specifications that have been edited for general use at this facility and are the preferred specification to be used. If there are missing specifications sections from the Tampa VA specific specification, then the specifications from the Technical Information Library shall be used. Any specifications that are edited by the contractor shall be submitted to the VA for approval. The edited version of the specification shall be in Microsoft Word in the editing format, and all changes shall be in RED. Contact the project COR to obtain a copy of these specifications. This facility will provide the specification sections needed based on the master list provided in the first review. The A/E shall provide the final edited specifications electronically in Microsoft Word and PDF. The format shall be 1.5 spaced, left justified, 2-sided, laser quality, and courier-new size 10 font. One copy of the specifications shall be in a colored, 3- “D”-ring loose-leaf binder, with identification labels on the binding and cover so the project title and number are readily visible and with tabbed dividers between each specification section. Any files submitted electronically (including but not limited to specifications and drawings) shall not have the following characters in their file name: \ /: *? “ < > | # { } % ~ &.

6. DESIGN SCHEDULES: Design schedules shall be submitted to the VA as an 11x17 Microsoft Projects or P6 file at the beginning of the Notice to Proceed, with each invoice for payment and shall never be more than 4 weeks old. Approximate time frames are presented below. Actual timelines submitted for approval should reflect the project complexity and follow the format presented below:

i. Schematics

ii. Begin Design Development (Notice to Proceed): NTP

iii. First Submission of Design Development (50%): NTP + 28 Days

iv. First Review Meeting and Return First Submission: NTP + 42 Days

v. Second Submission Contract Documents (90%) NTP + 56 Days

vi. Second Review Meeting and Return Second Submission: NTP + 70 Days

xiv. Third Submission (Deliver Final Contract Documents) (100%): NTP + 84 Days

xv. Third Review Meeting and Return Fourth Submission: NTP + 91 Days

xvi. Final design submission: NTP + 98 Days

7. REVIEW MEETINGS: The DB Team, including the designer of record, is required to attend a design review meeting after each submission during the design process and provide meeting minutes to the VA for approval and distribution.

Sections of the documents that are not acceptable by the VA according to the design standards and criteria must be updated by the A/E prior to moving on to the next scheduled submission.

D. COMPLIANCE

· The contractor shall be fully responsible for compliance with all VA, local, state, and Federal occupational safety laws, rules, and regulations.

· The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients.

· The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working procedures.

· All work for the duration of the contract shall be performed by certified trained technicians.

E. CONTRACTOR EMPLOYEES

Contractor personnel shall present a neat appearance and be easily recognized as contract employees. Example: wearing steel toe boots and safety glasses, ID badges and or name tags.

F. CONTRACTOR EMPLOYEE IDENTIFICATION

All contractor employees must be clearly identified as contractors (not VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email). The contractor must provide all employees with a contractor identification (ID) badge at the contractor’s expense prior to performing work under this contract. Contractor employees are always required to display this badge when performing services under this contract.

Employees released from service by the contractor must have their badge collected by the contractor. All badges must contain an expiration date and photograph of the employee.

All contractor employees must also be required to wear VA issued badges and must always display these badges while in the performance of this contract and/or as instructed by the COR.

The contractor supervisor must ensure that all contractor employees display their VA issued badges.

The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.

G. CONTRACTOR EMPLOYEE CONDUCT

· The contractor is completely responsible for all actions and conduct of their employees. Contractor employees must be well-groomed and neat in appearance.

· Contract employees must be professional in attire and must not wear any offensive clothing.

· Contractor employees must conduct themselves in a socially acceptable manner appropriate for an office work environment; Loudness, vulgarity, rudeness, smoking, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA premises.

· Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.

H. CONTRACTOR RESPONSIBILITY

· The contractor shall obtain all necessary licenses and/or permits as required to perform this work.

· He/she shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

· He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees’ fault or negligence and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of Florida.

· Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there from.

I.UNSCHEDULED REPAIRS AND EMERGENCY SERVICE:

· Contractor shall provide a telephone number for repair services assistance. Contractor shall notify the COR immediately if the telephone number is changed.

· Contractor shall respond to emergency repair calls with their installation/warranty by phone normally within two (2) hours but no more than four (4) hours. Contractor shall provide an on-site response time of no more than four (4) hours or next business day if call is made after 1:00 p.m. and be required to repair the equipment and place it back in service within twenty-four (24) hours after notification by telephone call (unless another specified time is agreed to by the COR placing the service call request). Response time is defined as time contractor is first notified until the time vendor arrives on station. Failure to meet the required on-site response or repair time shall allow the Government an option to contact a third-party vendor to provide services. Costs for services provided by a third party shall be billed against the Contractor.

J. CONTRACT AWARD MEETING:

· The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a Kickoff Meeting or advised the contractor that a kickoff meeting is waived.

K. PERIOD OF PERFORMANCE:

· The period of performance for this contract is 270 days.

· This shall be a firm-fixed price contract. Warranty period for the installation and repair will be provided as part of the original contract documents for the project.

L. CHANGES TO THE Statement of Work

· Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder with all other products of the project. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.

M. PERFORMANCE REQUIREMENTS:

· Contractor shall provide the necessary personnel and equipment to meet or exceed required service. Contractor shall have the following responsibilities:

· Provide licensed and trained personnel to perform the project in the State of Florida.

· Provide all supervision, labor and materials to complete all requirements described in this SOW.

· Contractor shall obtain all necessary licenses and permits required to perform the work required by this SOW, with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour Construction Outreach Training or General Industry Outreach Training.

· Contractor shall take all precautions necessary to protect persons and property from injury and/or damage during performance of this contract.

· Contractor shall be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the performance of this contract that is caused by the Contractor’s fault or negligence.

· Contractor shall insure that all areas where…