Exhibit H. GSA Form 1364 (6).docx

DOCX document 52 KB Posted

Attached to
General Services Administration (GSA) Seeks to lease the following space: Solicitation No. 4NC0321
Solicitation number
4NC0321
Issued by

About this file

This document is a GSA Form 1364 (Proposal to Lease Space) for a lease proposal in response to Request for Lease Proposals (RLP) Number 4NC0321. The General Services Administration is seeking to lease 19,862 ABOA (Rentable) square feet of office space in Cary, North Carolina. The form provides a comprehensive template for property owners to submit detailed lease proposals, including sections covering building description, space offerings, rental rates, lease terms, parking availability, and specific property characteristics.

Key details include options for tenant improvements, building specific amortized capital (BSAC), shell rent, and operating costs. The proposal allows for specifying lease term, renewal options, parking spaces, and additional financial aspects such as HVAC overtime rates and tax information. The form also requires potential lessors to provide information about property characteristics like flood plain status, seismic safety, historic designation, asbestos-containing materials, fire/life safety standards, accessibility, and energy efficiency (ENERGY STAR). Notably, there's a provision for HUBZone small business concerns to potentially waive price evaluation preferences.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL TO LEASE SPACE

In Response to Request for Lease Proposals (RLP) Number

4NC0321

DATED
MM-DD-YYYY

SECTION I - DESCRIPTION OF PREMISES

1.BUILDING DESCRIPTION
a. Building Name
b.Building Street Address

XXXXX

XXXXX

c.City
d.State
e.9-Digit ZIP Code
f.Congressional District

XXXXX

XX
XXXXX-XXXX
____
2a.FLOORS OFFERED
2b.TOTAL NUMBER

OF FLOORS IN BUILDING

3. TOTAL RENTABLE SPACE IN OFFERED BUILDING

a. GENERAL PURPOSE (Office)

b.WAREHOUSE
c.OTHER
_____
_____
_____ SF
_____ SF
_____ SF
4.LIVE FLOOR LOAD
5.MEASUREMENT

METHOD

6. YEAR OF LAST

MAJOR RENOVATION

(if applicable)

7.BUILDING AGE
8.SITE SIZE
_____ Pounds per SF
|_| ANSI/BOMA

|_| OTHER

_____
_____
_____ SF

_____ Acres

SECTION II - SPACE OFFERED AND RATES

9.ANSI/BOMA OFFICE AREA SQUARE FEET (ABOA)
________
10.RENTABLE SQUARE FEET (RSF)
________
11.COMMON AREA FACTOR (CAF)
________

“Tenant Improvements” are all alterations for the Government‑demised area above the building shell buildout, excluding costs identified as tenant improvements in the Security Unit Price List. Building Specific Amortized Capital (BSAC) is the sum of costs identified as such in the Security Unit Price List. Neither the Tenant Improvements as stated in Block 12, nor the BSAC as stated in Block 13, are to be included in the shell rent. It is expected that the tenant buildout will be fully amortized at the end of the firm term, and the rent will be reduced accordingly. Any desired rent increases or decreases beyond the firm term of the lease should be reflected in the shell rate and fully explained as part of this written proposal. If Tenant Improvements or BSAC improvements are to be amortized beyond the firm term, those calculations must be itemized as part of this written proposal. The Offeror may attach additional pages as necessary.

Number of years each cost per square foot is in effect. State any changes for any rent component.

a.

BUILD‑OUT COSTS PER CATEGORY

b.

AMORTIZATION

TERM

c.

AMORTIZATION

INTEREST RATE (%)

d.

ANNUAL RENT

$ PER RSF

e.

ANNUAL RENT

$ PER ABOA SF

f.

NUMBER YEARS RATE IS EFFECTIVE

12. TENANT IMPROVEMENTS

(per RLP requirements)

$ 0.00
________
________
$ ________
$________
________

13. BSAC

(per RLP requirements)

$ 0.00
________
________
$ ________
$________
________

14. SHELL BUILD-OUT

(per RLP requirements)

15.TOTAL BUILD‑OUT COSTS
$ ________

16. SHELL RENT (Including real estate taxes. Refer to Line 28 on GSA Form 1217)

17. OPERATING COSTS (Refer to Line 27 on GSA Form 1217)

$ ________
$ ________

18. TOTAL RATE/SF

$ ________
$ ________
________

19. TOTAL ANNUAL RENT

PER SF RATE
FOR YEARS
PER SF RATE RENT
FOR YEARS
PER SF RATE
FOR YEARS

20. STEP RENT (SHELL RATES)

$__________/RSF

$__________/ABOA

_____ Thru _____

$________/RSF

$________/ABOA

_____ Thru ____

$__________/RSF

$__________/ABOA

_____ Thru _____

21. PARKING

a.Number of parking spaces for the entire building/ facility which are under the control of the Offeror:________ Surface________ Structured
b.Number of parking spaces required by local code:________ Surface________ Structured
c.Number of parking spaces for Employee/Visitor Use (per RLP):________ Surface________ Structured
d.Number of parking spaces for Official Government Vehicles (per RLP):________ Surface________ Structured
e.Does the rental rate offered above include RLP‑required parking costs?
YES |_| NO |_| If NO, complete the following:Annual cost per space: $ ________ Surface $ ________ Structured

SECTION III - LEASE TERMS AND CONDITIONS

22. INITIAL LEASE TERM

(Full Term)

23. RENEWAL OPTIONS

a.Number of Years
b.Years Firm
c.Number of Days

Notice for Government to Terminate Lease

a. Shell Rate / RSF / Yr

b.Years Each
c.Number of Options
d.Number of Days Notice to Exercise Option:
XXX
XXX
XXX
$ ______
XXX
XXX
XXX

24. OFFER GOOD UNTIL AWARD

25. Space will be altered and delivered in accordance with the Government's specifications and requirements in accordance with the Request for Lease Proposals (RLP) and the lease.

26. COMMISSIONS (If applicable), ATTACH COMMISSION AGREEMENT

a.Tenant Representative Commission:
b.Owner’s Representative Commission:
c.Schedule of Commission Payments:
______ %
______ %
______ % at lease award and ______ % at lease occupancy

27. OFFEROR’S TENANT IMPROVEMENT FEE SCHEDULE*

*Block 27 fees only applicable for TI subject to post-award pricing.; N/A for turnkey pricing

a.Architectural/Engineering fees will be (choose one):
|_| 1.$ ______ per ABOA SF
|_| 2.______ % of Total TI construction costs
|_| 3.$ ______ flat fee
b.Lessor’s Project Management Fee will be ______ percent of Total TI construction costs

c. If other fees are applicable, state as per ABOA square foot, or if using a percentage, the basis for determining the fee.

The Government will add the cost of the proposed TI fees to the net present value of the offered rental rate as described in the RLP’s Present Value Price Evaluation paragraph. This schedule will be applicable for Tenant Improvements.

28. ADDITIONAL FINANCIAL ASPECTS OF THE LEASE

Adjustment for Vacant Premises: $________ per ABOA SF Adjustment for Reduced Services: $________ per ABOA SF* *Only applies when Government requires extended services, such as 24/7 HVAC, beyond normal operating hours (check RLP/Lease for confirmation). Reflects reduction if Government no longer requires these extended services.

HVAC Overtime Rate: $________ per hour per |_|zone |_|floor |_|space (choose one) For rates based on a “per zone” basis, provide the following:

Number of zones in offered Space: ______ Building’s Normal Hours of HVAC Operation:

Monday - Friday _____ AM to ____ PM
Saturday _____ AM to _____PM
Sunday _____ AM to _____PM
Percent of Government Occupancy:_________%
Current Year Taxes:$_________
Based on fully assessed value?|_|Yes|_|No
Is the offered space part of multiple tax bills or multiple buildings on an single tax parcel?|_|Yes|_|No
If so, provide tax ID numbers and SF for each. Attach the legal description of the offered property.

If a site is offered, state the total land costs: $________

29.FREE RENT INCLUDED IN OFFER
|_| 1.______ months free rent (includes shell, operating, TI and BSAC rent)
|_| 2.Other rental concessions structured as follows ______
|_| 3.None

30. LIST OF ATTACHMENTS SUBMITTED WITH THIS OFFER (See RLP requirements)

XXXXX

31. ADDITIONAL REMARKS OR CONDITIONS WITH RESPECT TO THIS OFFER

XXXXX

SECTION IV - OWNER IDENTIFICATION AND CERTIFICATION

32. RECORDED OWNER

a. Name
b. Address
c. City
d. State
e. ZIP +4
f. Unique Entity Identifier (UEI)

33. BY SUBMITTING THIS OFFER, THE OFFEROR AGREES UPON ACCEPTANCE OF THIS PROPOSAL BY HEREIN SPECIFIED DATE, TO LEASE TO THE UNITED STATES OF AMERICA, THE PREMISES DESCRIBED, UPON THE TERMS AND CONDITIONS AS SPECIFIED HEREIN, IN FULL COMPLIANCE WITH AND ACCEPTANCE OF THE AFOREMENTIONED RLP, WITH ATTACHMENTS.

|_| I have read the RLP with attachments in its entirety and am requesting no deviations.

34. Offeror’s Interest in Property |_| Owner |_|Agent |_|Other _____________________________________

35. OFFEROR |_|Check if same as Recorded Owner

a.Name
b. Address
c. City
d. State
e. ZIP + 4
f. Title
g. E-Mail Address
h. Telephone Number
i.Offeror’s Signature
j.Date Signed

MM-DD-YYYY

LEASE PROPOSAL DATA
In Response to Request for Lease Proposals (RLP) Number

DATE:

1
Offeror's Interest in the Property:

Fee owner Other:

Attach evidence of Offeror's interest in property (e.g., deed) and representative's authority to bind Offeror.

2
Flood Plains:

The Property is in a base (100-year) flood plain in a 500-year flood plain not in a flood plain.

(See RLP Section 2, Flood Plains.)

3
Seismic Safety: The Building

RLP does not contain seismic requirements. No documentation required.

RLP contains seismic requirements. The Building

Fully meets seismic requirements or meets an exemption under the RLP
Does not meet seismic requirements, but will be retrofitted to meet seismic requirements
Will be constructed to meet seismic requirements
Will not meet seismic requirements

(See RLP Section 2, Seismic Safety.) Attach appropriate documentation.

4
Historic Preference: The Building is a

Historic property within a historic district.

Non-historic developed site or non-historic undeveloped site within a historic district.

Historic property outside of a historic district.

None of the above.

(See RLP Section 2, Historic Preference.) Attach appropriate documentation.

5
Asbestos-Containing Material (ACM): The Property

Contains no ACM, or contains ACM in a stable, solid matrix that is not damaged or subject to damage.

Contains ACM not in a stable, solid matrix.

(See RLP Section 2, Asbestos.)

6
Fire/Life Safety:

The Property Meets Does not meet Lease fire/life safety standards.

(See RLP Section 2, Fire Protection and Life Safety.)

7
Accessibility:

The Property Meets Does not meet Lease accessibility standards.

(See RLP Section 2, Accessibility.)

8
ENERGY STAR®: The Building

Has received the ENERGY STAR® Label within the past twelve months. Date (MM-DD-YYYY): __________ Has not received the ENERGY STAR® Label within the past twelve months; the Offeror has evaluated energy savings measures and

Determined that none are cost effective.
Determined that the following are cost effective (Attach additional pages):

(See RLP Section 2, Energy Independence and Security Act.)

9
Waiver of Price Evaluation Preference. A HUBZone small business concern (SBC) Offeror may elect to waive the price evaluation preference provided in Section 4 of the RLP. In such a case, no price evaluation preference shall apply to the evaluation of the HUBZone SBC, and the performance of work requirements set forth in Section 1 of the Lease shall not be applicable to a lease awarded to the HUBZone SBC Offeror under this solicitation. A HUBZone SBC desiring to waive the price evaluation preference should so indicate below.

I am a HUBZone SBC Offeror and I elect to waive the price evaluation preference.

(See RLP and Lease documents for more information)

PAGE 1 of 3 GSA FORM 1364 (REV 04/22)

File details come from the government source that posted it. Updated .