About this file

This is a Mechanical Compliance Certificate for the Klamath Tribes Fitness Center Addition project located at 320 Chiloquin Boulevard, Chiloquin, Oregon. The document certifies that the proposed mechanical design for this 19,549 square-foot nonresidential exercise center addition complies with ASHRAE 90.1 (2022) Standard energy code requirements. The project utilizes five rooftop units (RTUs) configured as single and multiple-zone heat pump systems with capacities ranging from 44 kBtu/h to 138 kBtu/h, all equipped with air economizers and variable efficiency ratings exceeding code minimums. The mechanical systems include two electric storage water heaters (50-gallon and 10-gallon capacities) and one electric instantaneous water heater. The compliance report, dated September 3, 2026, was prepared by Mechanical Engineer Ethan Mansfield and documents that the proposed design meets all mandatory requirements and inspection checklist provisions for heating, cooling, ventilation, water heating, and control systems.

The project earned energy performance credits totaling 57.4 points across multiple compliance categories, including occupancy sensor controls (4.0 credits), reduced lighting power (12.0 credits), heating and cooling efficiency improvements (26.4 credits combined), HVAC load management (13.0 credits), energy monitoring (4.0 credits), and point-of-use water heating (2.0 credits). However, the proposed on-site renewable energy system capacity of 0 watts fails to meet the required 9,774 watts, though this requirement does not appear to be mandatory for this project classification. All mechanical systems, ductwork, controls, economizer operations, and service water heating equipment have been verified to comply with applicable code sections. The inspection checklist confirms compliance across plan review, footing/foundation, plumbing rough-in, mechanical rough-in, electrical rough-in, and final inspection phases, with commissioning and system balancing requirements incorporated into the construction documents.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 1 of 16

Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Project No:

Performance Sim. Specs:

All Electric:

Is Renewable:

Has Battery:

Has Charger:

Has Heat Pump

90.1 (2022) Standard Klamath Tribes Fitness Center Addition Chiloquin, Oregon 5b Addition 160921 EnergyPlus 24.1.0 (EPW: ) false false false false false

Construction Site: Owner/Agent: Designer/Contractor:

320 Chiloquin Blvd.

Chiloquin , Oregon 97624

Notes:

Energy Credits

Description Credit

L03 Occupancy Sensor Control Areas 4.0

L06 Reduced lighting power 12.0

Q02 Efficient kitchen equipment 0.0

H03 5% cooling efficiency improvement 16.0

H02 5% heating efficiency improvement 10.4

P01 Energy monitoring 4.0

G02 HVAC Load Management 13.0

G01 Lighting Load Management 0.0

W05 Point of Use Water Heater 2.0

Not applicable

Renewable energy

Number of Floors:

Area of Three Largest Floors:

Proposed Capacity:

Required Capacity:

Exception:

19549 None

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 2 of 16

On-Site Renewable Energy

System Capacity Units

Unspecified 0 Watts

Renewables Fail: Proposed: 0 Watts Required: 9774 Watts

Building Area

Description Floor Area

1-Exercise Center (Exercise Center) : Nonresidential 19549

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 3 of 16

Mechanical Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

90.1 (2022) Standard Klamath Tribes Fitness Center Addition Chiloquin, Oregon 5b Addition

Construction Site: Owner/Agent: Designer/Contractor:

320 Chiloquin Blvd.

Chiloquin , Oregon 97624

Mechanical Systems List

Quantity Component Description

HVAC Systems

1 RTU-1 (Single Zone): Single Package Heat Pump Heating Mode: Capacity = 138 kBtu/h, Proposed Efficiency = 3.80 COPH, Required Efficiency = 3.40 COPH Cooling Mode: Capacity = 103 kBtu/h, , Air Economizer Proposed Efficiency = 12.10 EER, Required Efficiency = 11.00 EER Proposed Part Load Efficiency = 17.20 IEER, Required Part Load Efficiency = 14.10 IEER Fan System: RTU-1/2 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes

Fans:

RTU-1/2 FAN Supply, Constant Volume, 5000 CFM, 2.9 motor nameplate hp, 72.00 fan energy index

1 RTU-2 (Single Zone): Single Package Heat Pump Heating Mode: Capacity = 138 kBtu/h, Proposed Efficiency = 3.80 COPH, Required Efficiency = 3.40 COPH Cooling Mode: Capacity = 103 kBtu/h, , Air Economizer Proposed Efficiency = 12.10 EER, Required Efficiency = 11.00 EER Proposed Part Load Efficiency = 17.20 IEER, Required Part Load Efficiency = 14.10 IEER Fan System: RTU-1/2 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes

Fans:

RTU-1/2 FAN Supply, Constant Volume, 5000 CFM, 2.9 motor nameplate hp, 72.00 fan energy index

1 RTU-3 (Multiple-Zone): Single Package Heat Pump Heating Mode: Capacity = 101 kBtu/h, Proposed Efficiency = 3.80 COPH, Required Efficiency = 3.40 COPH Cooling Mode: Capacity = 75 kBtu/h, , Air Economizer Proposed Efficiency = 12.10 EER, Required Efficiency = 11.00 EER Proposed Part Load Efficiency = 17.50 IEER, Required Part Load Efficiency = 14.10 IEER Fan System: RTU-3 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes

Fans:

RTU-3 FAN Supply, Constant Volume, 3400 CFM, 3.0 motor nameplate hp, 72.00 fan energy index

1 RTU-4 (Single Zone): Single Package Heat Pump Heating Mode: Capacity = 44 kBtu/h, Proposed Efficiency = 7.20 HSPF2, Required Efficiency = 6.70 HSPF2 Cooling Mode: Capacity = 34 kBtu/h, Proposed Efficiency = 16.20 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: RTU-4/5 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes

Fans:

RTU-4/5 FAN Supply, Constant Volume, 1600 CFM, 3.0 motor nameplate hp, 72.00 fan energy index

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 4 of 16

Quantity Component Description

1 RTU-5 (Single Zone): Single Package Heat Pump Heating Mode: Capacity = 44 kBtu/h, Proposed Efficiency = 7.20 HSPF2, Required Efficiency = 6.70 HSPF2 Cooling Mode: Capacity = 34 kBtu/h, Proposed Efficiency = 16.20 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: RTU-4/5 FAN -- Compliance (Motor nameplate HP and fan efficiency method) : Passes

Fans:

RTU-4/5 FAN Supply, Constant Volume, 1600 CFM, 3.0 motor nameplate hp, 72.00 fan energy index

Water Heaters

1 WH-1: Electric Storage Water Heater, Capacity: 50 gallons w/ Circulation Pump Proposed Efficiency: 0.98 SL, %/h (if > 12 kW), Required Efficiency: 0.84 SL, %/h (if > 12 kW)

1 WH-2: Electric Storage Water Heater, Capacity: 10 gallons No minimum efficiency requirement applies

1 IEWH-1: Electric Instantaneous Water Heater, Capacity: 0 gallons No minimum efficiency requirement applies

Mechanical Compliance Statement

Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2022) Standard requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Name - Title Signature Date

09/03/2026Ethan MansfieldEthan Mansfield - Mechanical Engineer

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 5 of 16

Inspection Checklist

Energy Code: 90.1 (2022) Standard

Requirements: 94% were addressed directly in the COMcheck software

Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.

Plan Review

Section

& Req.ID Plan Review Complies? Comments/Assumptions

4.2.2, 6.4.4.2.1, 6.7.2

[PR2]1

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: M001, M100, M101

4.2.2, 7.7.1, 10.4.2

[PR3]1

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed.

Hot water system sized per manufacturer's sizing guide.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: P001, P100, P200

4.2.2, 8.4.1.1, 8.4.1.2, 8.7

[PR6]2

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: TBD

4.2.5.2

[PR5]1

Commissioning shall be performed as stated in Sections 5.9.2, 6.9.2, 7.9.2, 8.9.2, 9.9.2, 10.9.2, 11.2(d), and G1.2.1(c). Commissioning must utilize ASHRAE/IES Standard 202 or other generally accepted engineering standards acceptable to the building official.

FPT and verification requirements for commissioning are as stated in Section

4.2.5.1. Commissioning shall document

compliance of the building systems, controls, and building envelope with required provisions of this standard. Commissioning requirements shall be incorporated into the construction documents.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: M001, M100, M101

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 6 of 16

Footing / Foundation Inspection

Section

& Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions

6.4.3.7

[FO9]3

Freeze protection and snow/ice melting system sensors for future connection to controls.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 7 of 16

Plumbing Rough-In Inspection

Section

& Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions

7.4.4.1

[PL2]3

Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use).

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: P001, P100, P200

7.4.4.2

[PL3]1

Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: P001, P100, P200

7.4.6

[PL4]3

Heat traps installed on non-circulating storage water tanks.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: P001, P100, P200

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 8 of 16

Mechanical Rough-In Inspection

Section

& Req.ID Mechanical Rough-In Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.4.1.4, 6.4.1.5

[ME1]2

HVAC equipment efficiency verified.

Non-NAECA HVAC equipment labeled as meeting 90.1.

Efficiency: Efficiency: Complies

Does Not Comply

Not Observable

Not Applicable

See the Mechanical Systems list for values

6.4.4.1.2

[ME8]2

HVAC ducts and plenums insulated per Table 6.8.2. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection.

R- R- Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.4.1.3

[ME9]2

HVAC piping insulation thickness.

Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection.

in. in.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.4.1.4

[ME41]3

Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.4.2.1

[ME10]2

Ducts and plenums having pressure class ratings are Seal Class A construction.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.8.1-15, 6.8.1-16

[ME110]2

Electrically operated DX-DOAS units meet requirements per Tables 6.8.1-15 or 6.8.1-16.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.4.4.2.2

[ME11]3

Ductwork operating >3 in. water column requires air leakage testing.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.1, 6.5.1.1, 6.5.1.3, 6.5.1.4

[ME12]1

Air economizers provided where required (and not exempted), meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, air relief, and provide a means to relieve excess outside air during operation.

Complies

Does Not Comply

Not Observable

Not Applicable

6.5.1.4

[ME16]1

Economizer operation will not increase heating energy use during normal operation.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.2.1

[ME17]1

Zone controls can limit reheating, recooling, simultaneous heating and cooling and sequence heating and cooling to each zone.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.2.3

[ME19]3

Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 9 of 16

Section

& Req.ID Mechanical Rough-In Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.5.2.4.1

[ME68]3

Humidifiers with airstream mounted preheating jackets have preheat auto-shutoff value set to activate when humidification is not required.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.2.4.2

[ME69]3

Humidification system dispersion tube hot surfaces in the airstreams of ducts or air-handling units insulated >= R-0.5.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.2.5

[ME70]3

Preheat coils controlled to stop heat output whenever mechanical cooling, including economizer operation, is active.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.2.6

[ME106]3

Units that provide ventilation air to multiple zones and operate in conjunction with zone heating and cooling systems are prevented from using heating or heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.3.4

[ME108]2

Parallel-flow fan-powered VAV air terminals have automatic controls to a) turn off the terminal fan except when space heating is required or if required for ventilation; b) turn on the terminal fan as the first stage of heating before the heating coil is activated; and c) during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.3.8

[ME109]2

Required minimum outdoor air rate is the larger of minimum outdoor air rate or minimum exhaust air rate required by Standard 62.1, Standard 62.2, Standard 170, or applicable codes or accreditation standards. Outdoor air ventilation systems shall comply with one of the following: a) design minimum system outdoor air provided < 135% of the required minimum outdoor air rate,

b) dampers, ductwork, and controls allow the system to supply <= the required minimum outdoor air rate with a single set-point adjustment., or c) system includes exhaust air energy recovery complying with Section 6.5.6.1.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.3.9

[ME110]2

Zones serving rooms required to have automatic partial OFF or automatic full OFF lighting controls per Section 9.4.1.1, where the ASHRAE Standard

62.1 occupancy category permits ventilation air to be reduced to zero when the space is in occupied-standby mode and when using the Ventilation Rate Procedure, shall meet the following within five minutes of all rooms in that zone entering occupied-standby mode.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.3.2.2

[ME23]2

VAV fans have static pressure sensors positioned so setpoint <=1.2 in. w.c.

design pressure.

Complies

Does Not Comply

Not Observable

Not Applicable

N/A

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 10 of 16

& Req.ID Mechanical Rough-In Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.5.3.2.3

[ME24]2

Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure. Controls provide: zone damper monitoring or indicator of static pressure need;

autodetection, alarm, and operator override of zones excessively triggering reset logic.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

N/A

6.5.3.2.4

[ME102]2

Return and relief fans used to meet Section 6.5.1.1.5 have relief air rate controlled to maintain building pressure through differential supply-return airflow tracking. Systems with supply fans allowed to control the relief system based on oudoor air damper position.

Fans have variable speed control or other devices for managing total return/relief fan system demand per section threshold.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.3.3

[ME42]3

Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for values

6.4.3.4.1

[ME3]3

Stair and elevator shaft vents have motorized dampers that automatically close.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.3.5

[ME43]3

Multiple zone HVAC systems have supply air temperature reset controls.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Mechanical Systems list for values Location on plans/spec:

M001, M100, M101

6.5.4.2

[ME25]3

HVAC pumping systems with >= 3 control values designed for variable fluid flow (see section details).

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.6.1, 6.5.6.1.1

[ME56]1

Nontransient dwelling units shall be provided with outdoor air energy recovery ventilation systems that meet the requirements of Section 6.5.6.1.1

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.6.1, 6.5.6.1.2

[ME110]1

Fan systems serving spaces other than nontransient dwelling units have an energy recovery system meet the requirements in Tables 6.5.6.1.2-1 and 6.5.6.1.2-2

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.5.7.1

[ME100]2

Conditioned supply air to space with mechanical exhaust <= the greater of criteria of supply flow, required ventilation rate, exhaust flow minu the available transffer air (see section details).

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.7.2.1

[ME32]2

Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.4.3.4.2, 6.4.3.4.3

[ME4]3

Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 11 of 16

& Req.ID Mechanical Rough-In Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.5.7.2.4

[ME49]3

Approved field test used to evaluate design air flow rates and demonstrate proper capture and containment of kitchen exhaust systems.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.8.1

[ME34]2

Unenclosed spaces that are heated use only radiant heat.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

7.4.2

[ME36]2

Service water heating equipment meets efficiency requirements.

Complies

Does Not Comply

Not Observable

Not Applicable

6.4.3.9

[ME63]2

Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F.

Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 85F.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.10

[ME73]3

Doors separating conditioned space from the outdoors have controls that disable/reset heating and cooling system when open.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Building entrances have automatic closing devices.

6.4.3.4.5

[ME39]3

Parking garage ventilation shall meet the following: 1) Separate ventilation systems and control systems for each section, 2) Control systems shall automatically detect and control contaminant levels and capable to reduce airflow to 20% or less of design capacity and 3) The ventilation system for each section shall have controls that result in fan motor demand <= 30% of design wattage at 50% of the design airflow.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.4.3.4.4

[ME5]3

Ventilation fans >0.75 hp have automatic controls to shut off fan when not required.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: HVAC systems intended to operate continuously.

6.4.3.8

[ME6]1

Demand control ventilation provided for spaces larger than the floor area of Table 6.4.3.8 based on occupant outside airflow in cfm per 1000 sq ft and served by an air economizer, automatic damper or with design airflow > 3000 cfm

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.5.3.2.1

[ME40]2

DX cooling systems >= 75 kBtu/h (>= 65 kBtu/h effective 1/2016) and chilled-water and evaporative cooling fan motor hp >= ¼ designed to vary supply fan airflow as a function of load and comply with operational requirements.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

See the Mechanical Systems list for values

6.4.4.1.1

[ME7]3

Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 12 of 16

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 13 of 16

Rough-In Electrical Inspection

Section

& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions

8.4.2

[EL10]2

At least 50% of all 125 volt 15- and 20-Amp receptacles are controlled by an automatic control device.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Receptacles intended for 24 hour operation of equipment.

Location on plans/spec: TBD

8.4.3

[EL11]2

New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. In buildings with a digital control system the energy use is transmitted to to control system and displayed graphically.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: TBD

10.4.1

[EL9]2

Electric motors meet requirements where applicable.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: M001, M100, M101

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 14 of 16

Final Inspection

Section

& Req.ID Final Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.4.3.6

[FI6]3

When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited.

Humidity control prohibits the use of fossil fuel or electricity to produce RH > 30% in the warmest zone humidified and RH < 60% in the coldest zone dehumidified.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

N/A

6.7.3.1

[FI7]3

Furnished HVAC as-built drawings submitted within 90 days of system acceptance.

Complies

Does Not Comply

Not Observable

Not Applicable

6.7.3.2

[FI8]3

Furnished O&M manuals for HVAC systems within 90 days of system acceptance.

Complies

Does Not Comply

Not Observable

Not Applicable

6.7.3.3

[FI9]1

An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.7.3.2

[FI10]1

HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

7.4.4.3

[FI11]3

Public lavatory faucet water temperature <=110°F.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

P001, P10, P200

7.4.4.4

[FI12]3

Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

P001, P100, P200

6.4.3.1.1

[FI2]2

Heating and cooling to each zone is controlled by a thermostat control.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

10.4.3

[FI24]2

Elevators are designed with the proper lighting, ventilation power, and standby mode.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

10.5.1

[FI25]1

The building site contains on-site renewable energy with a rated capacity of not less than 0.50 W/ft2 or 1.7 Btu/ft2 of the three largest floors.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

7.4.3.1

[FI45]2

First 8 ft of outlet piping in nonrecirculating storage system, or branch piping connected to recirculated, heat traced, or impredance heated piping is insulated.

Complies

Does Not Comply

Not Observable

Not Applicable

P001, P100, P200

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 15 of 16

& Req.ID Final Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

10.4.5

[FI26]2

Air curtain unit performance tested in accordance with ANSI/AMCA 220 or ISO 27327-1 . Automatic controls comply with Section 6.4.3.9.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

10.4.7

[FI27]2

Whole-Building Energy Monitoring devices shall be installed and complies with Section 10.4.7.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

6.4.3.1.2

[FI3]3

Thermostatic controls have a 5 °F deadband.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

11.5.2.3.3a

[FI55]2

W05: Point of Use Water Heater energy credit measure requires hot water to be supplied from localized source without recirculation or heat trace. Pipe insulation according to Table 6.8.3-1 and volume of water in piping limited to 2 oz for nonresidential lavatories or 0.25 oz for all other plumbing fixtures.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Mechanical Systems list for values

6.4.3.2

[FI20]3

Temperature controls have setpoint overlap restrictions.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

11.5.2.4

[FI60]2

P01: Energy Monitoring energy credit measure requires projects that are not required to have electrical energy monitoring systems installed shall be equipped to measure, monitor, record, and report energy consumption data in compliance with Section 8.4.3.

Complies

Does Not Comply

Not Observable

Not Applicable

11.5.2.5.3

[FI62]2

L03: Occupancy Sensors Control Areas energy credit measure requires buildings use “Simplified Building Method Compliance Path,” or in spaces where automatic partial OFF or automatic full OFF is not required, it shall be installed in accordance with Section 11.5.2.5.3.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Interior Lighting fixture schedule for values Location on plans/spec:

TBD

11.5.2.7.2

[FI67]2

Q02: Efficient Kitchen Equipment energy credit measure requires buildings with a commercial kitchen with at least one gas or electric fryer and all other cooking appliances comply with Section 11.5.2.7.2.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

TBD

11.5.2.8.1

[FI69]2

G01: Lighting Load Management energy credit measure requires luminaires have dimming capability and load management controls reduce general lighting power with continuous dimming in 75% of the project area during peakprice periods coincident with high building load.

Complies

Does Not Comply

Not Observable

Not Applicable

Energy credit params:

Percentage lighting load management (in %): 0.0

6.4.3.3.1

[FI21]3

HVAC systems equipped with at least one automatic shutdown control.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Systems designed for continuous operation.

11.5.2.8.2

[FI70]2

G02: HVAC Load Management energy credit measure requires load management shall a) increase cooling set point > 3F or reduce cooling capacity to 60% of installed capacity; b) for electric heating, reduce heating set point > 3F or reduce heating capacity to 60% of installed capacity; and c) provide excess outdoor air and reduce outdoor air in accordance with ASHRAE Standard 62.1, Section 6.2.5.2.

Complies

Does Not Comply

Not Observable

Not Applicable

Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 03, 2026, 01:27 PM (PDT) 16 of 16

& Req.ID Final Inspection

Plans Verified Value

Field Verified Value Complies? Comments/Assumptions

6.4.3.3.2

[FI22]3

Setback controls allow automatic restart and temporary operation as required for maintenance.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.3.3.4

[FI23]3

Zone isolation devices and controls. Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.3.5

[FI5]3

Heat pump controls prevent supplemental electric resistance heat from coming on when not needed.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101

6.4.3.12

[FI200]3

Air economizer has a fault detection and diagnostics (FDD) system (see details for configuration and operational requirements).

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec:

M001, M100, M101