Exhibit F--Chiloquin Fitness Center Expansion--Electrical Comcheck--2026-09-05.pdf
PDF 598 KB Posted
- Solicitation number
- S-Q10089-00017928
- Issued by
- Jackson County, Cheshire CDP, Oregon
About this file
This is an Electrical Compliance Report prepared by Kennedy Davidson, Electrical Engineer, for the Klamath Tribes Fitness Center Addition project in Chiloquin, Oregon. The report documents energy code compliance using the ASHRAE 90.1 (2022) Standard and COMcheckWeb software for an addition project with a total floor area of 19,549 square feet classified as a nonresidential exercise center. The project is located at 320 Chiloquin Boulevard, Chiloquin, Oregon 97624, in Climate Zone 5b. The compliance certificate was issued on September 2, 2026, with the engineer's signature dated September 4, 2026. The project includes comprehensive interior and exterior lighting design specifications, HVAC load management systems, energy monitoring capabilities, and occupancy sensor controls, with the interior lighting design performing 40 percent better than code requirements and exterior lighting performing 17 percent better than code.
The report details proposed interior lighting power of 8,429 watts against an allowed 11,542 watts, utilizing LED fixtures with automatic controls including local control with restricted manual on and automatic full-off functionality at 50 percent reduction. Exterior lighting power totals 280 tradable watts against an allowed 339.2 watts, incorporating daylight shutoff and lighting setback controls on LED wall pack fixtures at both the entrance and upper exterior door areas. Energy credits claimed include occupancy sensor control areas (4.0 points), reduced lighting power (12.0 points), energy monitoring (4.0 points), and HVAC load management (13.0 points). The project failed the renewable energy requirement, proposing zero watts of on-site renewable energy against a required 9,774 watts capacity. The inspection checklist indicates 83 percent of energy code requirements were addressed directly through the COMcheck software, with all plan review sections, rough-in electrical inspections, and final inspection items marked as compliant.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 1 of 10
Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
Performance Sim. Specs:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
90.1 (2022) Standard Klamath Tribes Fitness Center Addition Chiloquin, Oregon 5b Addition 160921 EnergyPlus 24.1.0 (EPW: TBD) false false false false false
Construction Site: Owner/Agent: Designer/Contractor:
320 Chiloquin Blvd.
Chiloquin , Oregon 97624
Notes:
Energy Credits
Description Credit
L03 Occupancy Sensor Control Areas 4.0
L06 Reduced lighting power 12.0
Q02 Efficient kitchen equipment 0.0
H03 5% cooling efficiency improvement 0.0
H02 5% heating efficiency improvement 0.0
P01 Energy monitoring 4.0
G02 HVAC Load Management 13.0
G01 Lighting Load Management 0.0
Not applicable
Renewable energy
Number of Floors:
Area of Three Largest Floors:
Proposed Capacity:
Required Capacity:
Exception:
19549 None
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 2 of 10
On-Site Renewable Energy
System Capacity Units
Unspecified 0 Watts
Renewables Fail: Proposed: 0 Watts Required: 9774 Watts
Building Area
Description Floor Area
1-Exercise Center (Exercise Center) : Nonresidential 19549
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 3 of 10
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
90.1 (2022) Standard Klamath Tribes Fitness Center Addition Chiloquin, Oregon 5b Addition
Construction Site: Owner/Agent: Designer/Contractor:
320 Chiloquin Blvd.
Chiloquin , Oregon 97624
Allowed Interior Lighting Power
A B C D
Area Category Floor Area (ft2) Allowed Watts / ft2 Allowed Watts
1-Fitness Center (Gymnasium/Fitness Center:Exercise Area) 14075 0.82 11542
Total Allowed Watts: 14075
Proposed Interior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
1-Fitness Center (Gymnasium/Fitness Center:Exercise Area)
LB1: LB1: LED: 17 82 1394
RD4: RD4: LED: 13 15 195
RT1: RT1: LED: 115 32 3680
RT1H: RT1H: LED: 64 47 3008
S1: S1: LED: 4 38 152
Total Proposed Watts: 8429
Proposed Interior Lighting Controls
Fixture Lighting Control
1-Fitness Center (Gymnasium/Fitness Center:Exercise Area)
LB1: LB1: LED: Local Control, Restricted Manual On, Auto Full Off(50%)
RD4: RD4: LED: Local Control, Restricted Manual On, Auto Full Off(50%)
RT1: RT1: LED: Local Control, Restricted Manual On, Auto Full Off(50%)
RT1H: RT1H: LED: Local Control, Restricted Manual On, Auto Full Off(50%)
S1: S1: LED: Local Control, Restricted Manual On, Auto Full Off(50%)
Interior Lighting PASSES: Design 40% better than code
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 4 of 10
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2022) Standard requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Kennedy Davidson - Electrical Engineer 9/4/26
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 5 of 10
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Exterior Lighting Zone:
90.1 (2022) Standard Klamath Tribes Fitness Center Addition Chiloquin, Oregon 5b Addition Developed rural area (LZ1)
Construction Site: Owner/Agent: Designer/Contractor:
320 Chiloquin Blvd.
Chiloquin , Oregon 97624
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Watts / ft2 Tradable Wattage
Allowed Watts (B X C)
Exterior Door (Pedestrian and vehicular entrances and exits)
32 ft of door width
5.60 No 179.2
Total Tradable Watts (a): 179.2
Base Site Allowance (b): 160
Total Allowed Watts: 339.2
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A base site allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
Exterior Door (Pedestrian and vehicular entrances and exits, 32 ft of door width): Tradeable Wattage
WPE: WPE: LED: 4 40 160
WPH: WPH: LED: 2 60 120
Total Tradable Proposed Watts: 280
Proposed Exterior Lighting Controls
Fixture Lighting Control
Exterior Door (Pedestrian and vehicular entrances and exits, 32 ft of door width)
WPE: WPE: LED: Daylight Shutoff, Lighting Setback
WPH: WPH: LED: Daylight Shutoff, Lighting Setback
Exterior Lighting PASSES: Design 17% better than code
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 6 of 10
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 90.1 (2022) Standard requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Kennedy Davidson - Electrical Engineer 9/4/26
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 7 of 10
Inspection Checklist
Energy Code: 90.1 (2022) Standard
Requirements: 83% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section # & Req.ID Plan Review Complies? Comments/Assumptions
4.2.2, 8.4.1.1, 8.4.1.2, 8.7
[PR6]2
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
4.2.2, 9.4.3,
9.7 [PR4]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
9.7 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLANS
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 8 of 10
Rough-In Electrical Inspection
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
8.4.2
[EL10]2
At least 50% of all 125 volt 15- and 20-Amp receptacles are controlled by an automatic control device.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Receptacles intended for 24 hour operation of equipment.
Location on plans/spec: TBD
8.4.3
[EL11]2
New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. In buildings with a digital control system the energy use is transmitted to to control system and displayed graphically.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
9.5.2.2
[EL8]1
Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
9.4.1.1
[EL1]2
Automatic control requirements prescribed in Table 9.6.1, for the appropriate space type, are installed. Mandatory lighting controls (labeled as 'REQ') and optional choice controls (labeled as 'ADD1' and 'ADD2') are implemented.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
9.4.1.1
[EL2]2
Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
9.4.1.1f
[EL13]1
Daylight areas under skylights and roof monitors that have more than 150 W combined input power for general lighting are controlled by photocontrols.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
9.4.1.4
[EL3]2
Automatic lighting controls for exterior lighting installed according to Section 9.4.1.4.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLANS
9.4.1.3
[EL4]1
Separate lighting control devices for specific uses installed per approved lighting plans.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: LIGHTING PLAN
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 9 of 10
Final Inspection
Section
& Req.ID Final Inspection Complies? Comments/Assumptions
8.7.3.1
[FI16]3
Furnished as-built drawings for electric power systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
8.7.3.2
[FI17]3
Furnished O&M instructions for systems and equipment to the building owner or designated representative.
Complies
Does Not Comply
Not Observable
Not Applicable
9.2.2.1
[FI18]1
Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values
9.4.2
[FI19]1
Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values
11.5.2.4
[FI60]2
P01: Energy Monitoring energy credit measure requires projects that are not required to have electrical energy monitoring systems installed shall be equipped to measure, monitor, record, and report energy consumption data in compliance with Section 8.4.3.
Complies
Does Not Comply
Not Observable
Not Applicable
11.5.2.5.3
[FI62]2
L03: Occupancy Sensors Control Areas energy credit measure requires buildings use “Simplified Building Method Compliance Path,” or in spaces where automatic partial OFF or automatic full OFF is not required, it shall be installed in accordance with Section 11.5.2.5.3.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values Location on plans/spec: TBD
11.5.2.7.2
[FI67]2
Q02: Efficient Kitchen Equipment energy credit measure requires buildings with a commercial kitchen with at least one gas or electric fryer and all other cooking appliances comply with Section 11.5.2.7.2.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: TBD
11.5.2.8.1
[FI69]2
G01: Lighting Load Management energy credit measure requires luminaires have dimming capability and load management controls reduce general lighting power with continuous dimming in 75% of the project area during peakprice periods coincident with high building load.
Complies
Does Not Comply
Not Observable
Not Applicable
Energy credit params: Percentage lighting load management (in %): 0.0
11.5.2.8.2
[FI70]2
G02: HVAC Load Management energy credit measure requires load management shall a) increase cooling set point > 3F or reduce cooling capacity to 60% of installed capacity; b) for electric heating, reduce heating set point > 3F or reduce heating capacity to 60% of installed capacity; and c) provide excess outdoor air and reduce outdoor air in accordance with ASHRAE Standard 62.1, Section 6.2.5.2.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: Klamath Tribes Fitness Center Addition Report Date: Sep 02, 2026, 03:02 PM (PDT) 10 of 10
File details come from the government source that posted it. Updated .