Addendum #3 is a modification to the original bidding documents for RFP-KTHFS-2026-003, issued by Klamath Tribal Health and Family Services (KTHFS) for the Chiloquin Fitness Center Expansion Project in Chiloquin, Oregon. The project consists of construction of a 20,000+ square foot addition to the existing KTHFS Fitness Center, including a community room, workout room, teaching kitchen, wellness center, smoothie bar, additional offices, restrooms, and showers. The final date for RFP questions is Thursday, October 1, 2026, at 12:00 p.m., with a submission deadline of Wednesday, October 7, 2026. Addendum #3 provides clarifications and updates to specifications and drawings, including revisions to Section 11 30 13 (Appliances), mechanical schedule changes specifying Daikin equipment instead of Trane, updated electrical disconnect sizes and breaker configurations on drawing E202, and revised panel schedules on drawing E501. Key questions addressed include AWI QCP certification requirements (not required for project registration), inspection scope (no inspection required), permitted cable types (both MC and Romex allowed with Romex restricted to concealed walls only), door specifications in the workout area (two 10' x 9' overhead sectional garage doors with specification section 08 36 13), and signage responsibility (Owner-Provided, Contractor-Installed with coordination required on types, locations, and quantities).
The project establishes clear delineation between contractor-furnished and owner-furnished equipment. KTHFS will supply all appliances, furnishings, furniture, exercise equipment, kitchen appliances, restroom accessories, and other non-structural items for installation by contractors, while the contractor is responsible for furnishing and installing specific items including a 1/2 HP GE continuous-feed waste disposer (Model GFC525N), GE 30" wall-mount range hood (Model PCST22U1WSS), Demonstration Mirrors (Mirrorlite 48" x 72" x 1.25", quantity two for the training kitchen), cooking exhaust systems, and all related plumbing and electrical connections. KTHFS will continue occupying adjacent portions of the existing building during construction, requiring contractors to maintain all emergency building exits, limit utility outages to unoccupied hours, provide seven business days notice for life safety system disruptions, and coordinate all work with KTHFS Facilities/Security Director and Health Project Manager. Mechanical equipment includes five Daikin rooftop units (RTU-1 through RTU-5) with specifications detailed in the revised schedules, and all HVAC systems must comply with ASHRAE 90.1-2022 energy code requirements with demand control ventilation, supply and return smoke detectors, and single-zone VAV controls.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 1
KLAMATH TRIBAL HEALTH & FAMILY SERVICES
3949 S. 6th St.
Klamath Falls, OR 97603
Addendum #3
Project: RFP-KTHFS-2026-003
CHILOQUIN FITNESS CENTER EXPANSION PROJECT
FINAL DATE FOR RFP QUESTIONS:
Thursday, October 1, 2026 @ 12:00 p.m.
SUBMISSION DEADLINE: Wednesday, October 7, 2026
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 2
Table of Contents
Summary 3
Addendum 3 Updates 5
Section 11 30 13 – Appliances 7
M001 – Schedules and Notes Plan Sheet 9
E202 – Roof Power Plan Sheet 10
E501 – Electrical Panel Schedules Plan Sheet 11
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 3
SUMMARY
1. PROJECT
1.1 Project Name: RFP-KTHFS-2026-003 – Chiloquin Fitness Center Expansion Project.
1.2 The project consists of the construction of a 20,000+ SF addition to the existing KTHFS
Fitness Center in Chiloquin, Oregon. The project consists of a community room, a workout room, teaching kitchen, a wellness center, a smoothie bar, and additional offices, restrooms, and showers.
2. DESCRIPTION OF ALTERATIONS WORK
2.1 KTHFS will remove the following items before the start of work:
2.1.1 Existing FFE and fitness equipment in existing rooms that are part of the scope of work.
3. WORK BY KTHFS
3.1 Items noted not in contract (NIC) will be supplied and installed by KTHFS before the date of substantial completion. Some items include:
3.1.1 Moveable cabinets.
3.1.2 Furnishings.
3.1.3 Small equipment
3.1.4 Rugs.
3.1.5 Plateware, silverware, glassware, cooking vessels, linens.
3.1.6 Copiers, office supplies
3.2 KTHFS will supply the following for installation by the supplier of the equipment
3.2.1 All furnishings, furniture, and moveable equipment
3.2.2 Exercise equipment, sauna, cold plunge, weights, red light therapy, tables.
3.2.3 Kitchen appliances, ice machine, commercial style dishwasher, coolers and freezers, ranges, etc.
3.2.4 Restroom accessories, dispensers (i.e., soap dispensers, towel dispensers, seat protection dispensers, feminine hygiene dispensers, toilet paper dispensers
3.2.5 Artwork or wall-mounted equipment
3.2.6 Health assessment equipment
3.2.7 If an item is not attached to the structure, KTHFS is providing unless noted otherwise.
4. OWNER OCCUPANCY
4.1 KTHFS intends to continue to occupy adjacent portions of the existing building during the entire construction period. Maintain all exits from the existing facility.
4.2 Cooperate with KTHFS to minimize conflict and to facilitate KTHFS operations.
5. CONTRACTOR USE OF SITE AND PREMISES
5.1 Construction operations: Limited to areas noted on drawings.
5.1.1 Locate and conduct construction activities in ways that limit disturbance to site.
5.2 Arrange use of site and premises to allow:
5.2.1 Owner occupancy.
5.2.2 Work by others.
5.2.3 Work by KTHFS.
5.3 Provide access to and from site as required by law and/or by KTHFS:
5.3.1 Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 4
5.3.2 Do not obstruct roadways, sidewalks, or other public ways.
5.4 Utility outages and shutdown:
5.4.1 Limit disruption of utility services to hours the site is unoccupied.
5.4.2 Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm systems, without seven (7) business day notice to KTHFS and authorities having jurisdiction.
5.4.3 Prevent accidental disruption of utility services or other facilities.
6. WORK SEQUENCE
6.1 Coordinate construction schedule and operations with KTHFS Facilities/Security Director and KTHFS Health Project Manager.
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 5
ADDENDUM NO. 003
TO ALL PLAN HOLDERS:
This Addendum forms a part of the Contract Documents and modifies the original bidding documents released for bid preparation. Please notify everyone concerned as your sub-contractors and suppliers of the issuance and contents of this addendum prior to date of bid opening.
THE FINAL DATE RFP QUESTIONS WILL BE ACCEPTED IS THURSDAY, OCTOBER 1, 2026, AT 12:00 P.M.
QUESTIONS AND CLARIFICATIONS:
Q1: Project Certification – Is this project itself required to be registered and issued an AWI QCP Certificate of Compliance, or is the requirement solely for the millwork manufacturer / installer to hold current AWI QCP Certification?
A1: It is not required for the project to be registered.
Q2: Inspection Scope – Please confirm if AWI QCP installation inspection services are required to be contracted for this specific scope or its self-certification / compliance documentation by an AWI QCP certified shop is sufficient.
A2: No inspection is required.
Q3: Can you please clarify if MC Cable and Romex cables are permitted for branch circuits? Section 26 05 19 2.01K seems to allow MC, but Section 2.05 says only with written approval. Romex is not mentioned in those sections, but 26 05 29 3.01E seems to allow the use of Romex.
A3: Both MC and Romex cables are good to use. Romex cables can only be used if they are concealed within the walls; Romex cables cannot be put above any dropped or suspended ceilings.
Q4: I see there are 2 doors in the workout area, and maybe a counter door. These doors are not listed in the door schedule. Do you know if there will be another addendum that will have these listed and if they will have a spec section to follow?
A4: All doors in the workout area have tags included on the Floor Plan, A111. Doors 107D and 107E are the overhead sectional garage doors, 10’ wide x 9’ tall. Spec section was included, refer to Section 08 36 13 – Sectional Doors.
Q5: I found accessibility sign requirements and room names, but no architectural sign schedule or sign locations. Please confirm which room identification, restroom, directional, and exterior signs are in this bid, and provide sign types, sizes, finishes, copy, and quantities. Please also confirm whether AED and fire extinguisher cabinet markings are included with the cabinets, and whether MEP identification labels are being carried by those trades. I can price the signage once that scope is defined A5: Signage will be Owner Provided, Contractor Installed. Coordinate with owner on which rooms are to have signage, signage type, locations, etc.
SPECIFICATIONS:
Reference: Description:
Section 01 10 00 Summary Addendum #3 (REPLACED) Section 11 30 13 Appliances Addendum #3 (REPLACED)
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 6
Revised Sections:
Section 11 30 13 – Appliances
Section 1.01, Item A. REVISE “All appliances provided by KTHFS and installed by contractor unless noted otherwise below.” (Now Section 1.1, Item 1.1.1. of this Addendum).
Section 2.01, Item E. Cooking Exhaust. REVISE “Furnish and installation by contractor.” (Now Section 2.01, Subsection 2.1.1, Item 2.1.1.2. of this Addendum).
Section 2.01, Item G. Waste Disposer. REVISE “Furnish and installation by contractor.” (Now Section 2.01, Subsection 2.1.1, Item 2.1.1.1. of this Addendum).
Section 2.02, ADD Item B. “B. Demonstration Mirrors.” and subsections of Item B. (Section 2.2, Item 2.2.2. of this Addendum)
DRAWINGS:
M001 Schedules and Notes Revised mechanical schedule, manufacturer to show Daikin equipment instead of Trane.
E202 Roof Power Plan Revised disconnect size to coordinate with updated mechanical schedule.
E501 Electrical Panel Schedules Revised breaker sizes to coordinate with updated mechanical schedule.
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 7
SECTION 11 30 13 - APPLIANCES
1. PART 1 – GENERAL
1.1. Section includes:
1.1.1. All appliances provided by KTHFS and installed by contractor unless noted otherwise below.
1.2. Related requirements
1.2.1. Section 221005 – Plumbing Piping: Plumbing connections for appliances.
1.2.2. Section 260583 – Wiring Connections: Electrical connections for appliances.
1.3. Reference standards
1.3.1. UL (DIR) – Online Certifications Directory; Current Edition.
1.4. Submittals
1.4.1. See RFP-KTHFS-2026-003—Chiloquin Fitness Center Expansion RFP Packet, for submittal procedures.
1.4.2. Product Data: Manufacturers’ data indicating dimensions, capacity, and operating features of each piece of equipment specified.
1.4.3. Copies of Warranties: Submit manufacturer warranty and ensure that forms have been completed in KTHFS name and registered with manufacturer.
1.5. Quality Assurance
1.5.1. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than three years of documented experience.
1.5.2. Electric Appliances: Listed and labeled by UL (DIR) and complying with NEMA Standards (National Electrical Manufacturers Association).
1.6. Warranty
1.6.1. See Section 017800 – Closeout Submittals, for additional warranty requirements.
1.6.2. Provide five (5) year manufacturer warranty on refrigeration system of refrigerators.
1.6.3. Provide ten (10) year manufacturer warranty on magnetron tube of microwave ovens.
1.6.4. Provide ten (10) year manufacturer warranty on tube and door liner of dishwashers.
2. PART 2 – PRODUCTS
2.1. Kitchen Appliances
2.1.1. Contractor Furnished / Contractor Installed:
2.1.1.1. Waste Disposer: Corded
2.1.1.1.1. Power: 1/2 HP.
2.1.1.1.2. GE 1/2 HP Continuous-Feed Disposer
2.1.1.1.3. Model: GFC525N: www.geappliances.com/#sle
2.1.1.2. Cooking Exhaust: Range Hood
2.1.1.2.1. Exterior Finish: Stainless-steel
2.1.1.2.2. GE 30” Wall-Mount Pyramid Chimney Hood
2.1.1.2.3. Model: GE Profile #PCST22U1WSS: www.geappliances.com
2.1.2. KTHFS Furnished / Contractor Installed
2.1.2.1. Refrigerator: Free-standing, bottom-mounted freezer.
2.1.2.1.1. Exterior Finish: Stainless-steel
2.1.2.1.2. Teaching Kitchen location
2.1.2.1.3. Model: GE Profile Series Energy Star 22.1 Cu. Ft. counter-depth French-door refrigerator; #PYE22KYN.
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 8
2.1.2.2. Refrigerator / Freezer: Free-Standing Convertible Unit.
2.1.2.2.1. Quantity: Two (2). One (1) Cooler and One (1) Freezer
2.1.2.2.2. Smoothie Bar location
2.1.2.2.3. Manufacturer: Basis of Design – True Food Service Equipment, Inc. T-
23FG-FLX-HC-FGD01.
2.1.2.3. Ice Maker.
2.1.2.3.1. Manufacturer:
2.1.2.3.1.1. Basis of Design – Hoshizaki KM-250B_F Series
2.1.2.3.1.2. Air-cooled.
2.1.2.3.1.3. Smoothie Bar location.
2.1.2.4. Range: Electric, slide-in, with glass-ceramic cooktop
2.1.2.4.1. Exterior Finish: Stainless-steel
2.1.2.4.2. Model: GE Profile Energy Star 30-inch Smart Slide-in Fingerprint
Resistant Front-Control Induction and Convection Range with No Preheat Air Fry; #PHS93EYPFS: www.geappliances.com
2.1.2.5. Microwave: Countertop.
2.1.2.5.1. Exterior Finish: Stainless-steel.
2.1.2.5.2. Model: GE Profile Series 2.2 Cu. Ft. Countertop Sensor Microwave Oven;
#PCST22U1WSS.
2.1.2.6. Dishwasher
2.1.2.6.1. Finish: Stainless-steel
2.1.2.6.2. GE Profile Series Stainless Steel Interior Dishwasher with Microban
Antimicrobial Technology; Normal height countertop; #PDP715SYV:
www.geappliances.com
2.1.2.7. Glasswasher
2.1.2.7.1. Finish: Stainless-steel
2.1.2.7.2. Lamber 16 x 16 Square basket glasswasher; #DSP3
2.2. Other Equipment
2.2.1. Provide equipment eligible for Energy Star Rating: Energy Star Rated.
2.2.2. Demonstration Mirrors:
2.2.2.1. Mirrorlite Hanging and Suspended Glassless Mirror
2.2.2.1.1. Size: 48” x 72” x 1.25”
2.2.2.1.2. Quantity: Two (2)
2.2.2.1.3. Location: Training Kitchen
2.2.2.1.4. Contractor Furnished / Contractor Installed per manufacturer recommendation for suspended ceiling grids.
3. PART 3 – EXECUTION
3.1. Examination
3.1.1. Verify utility rough ins are provided and correctly located.
3.2. Installation
3.2.1. Install in accordance with manufacturers’ instructions.
3.3. Adjusting
3.3.1. Adjust equipment to provide efficient operation.
3.4. Cleaning
3.4.1. Remove packing materials from equipment and properly discard.
3.4.2. Wash and clean equipment.
A A
D
F F
G
10 11
1" / 12" 1/2" / 12"
"2
4 6 9
B
C
E E
R1
R1
M
IN
M
IN
1" / 12"
1" / 12"
RTU-1
RTU-2
RTU-3
R T
U -4
R T
U -5
RTU-1
100A/3P/3R
DP - 1
100A/3P/3R
DP - 2
60A/3P/3R
DP - 3
60A/3P/3R
DP - 4
60A/3P/3R
DP - 5
GFI/WP
LRP:5 - 43
GFI/WP
LRP:5 - 43
GFI/WP
LRP:4 - 41
GFI/WP
LRP:4 - 41
GFI/WP
LRP:4 - 41
HT HT J
HEATING CABLE
HT HT HT HT
J J
HEATING CABLE HEATING CABLE
HEATING CABLE
HT
HT
HT
HT
HT
HT
J
HT
HEATING CABLE
J
SMC #1
SMC #1 SMC #1
SMC #2
SMC #2
1345 NW WALL, SUITE 101
BEND, OREGON 97701
(541) 318-0404 cea@cea-engineering.com
COPYRIGHT 2026
STEELE ASSOCIATES ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L C
N
W P
O T
T S
C T
S
U
IT
E
B E
N D
O
R
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
5 4 3 2 16
B
C
D
E
B
C
D
E
AA
/2
/2
:5 :2
P
M
E202
CEACEA
17127.02
P E
R M
IT
S
E T
R O
O F
P O
W E
R P
L A
N
ROOF POWER PLAN
09/04/2026
K L A
M A
T H
T R
IB
E
S F
IT
N
E S
S A
D D
IT
IO
N
SCALE : 1/8" = 1'-0"
0' 4' 8' 16' 24'2'
1/8" = 1'-0"
1 ROOF POWER PLAN
POWER GENERAL NOTES:
A. UNLESS OTHERWISE NOTED, 120V, 20A/1P BREAKERS SHALL UTILIZE #
12 AWG CONDUCTORS. EXCEPTION: WHERE BRANCH CIRCUIT IS IN
EXCESS OF 125 LINEAR FEET, CONDUCTORS SHALL BE #10 AWG.
EQUIPMENT GROUNDING CONDUCTOR SHALL MATCH PHASE
CONDUCTOR FOR 20A/1P CIRCUITS.
B. BRANCH CIRCUIT CONDUCTORS SIZED TO PREVENT VOLTAGE DROP
MAY BE REDUCED IN SIZE AS LOAD SUPPLIED BY REMAINING CIRCUIT
DECREASES. VOLTAGE DROP SHALL NOT EXCEED THREE PERCENT AT
THE FARTHEST BRANCH CIRCUITS.
C. MULTIWIRE BRANCH CIRCUITS SHALL BE INSTALLED PER ARTICLE 210.4
OF THE NEC. EACH MULTIWIRE CIRCUIT SHALL BE PROVIDED WITH A
MEANS THAT WILL SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED
CONDUCTORS AT THE POINT WHERE THE BRANCH CIRCUIT
ORIGINATES. I.E. BREAKER HANDLE-TIE.
D. MAINTAIN A MINIMUM SEPARATION OF 12" BETWEEN CENTERLINE OF
ALL RECEPTACLES SET INTO OPPOSITE SIDES OF ALL SOUND
ISOLATION WALLS. WHERE ABOVE NOTED CONDITION OCCURS AND
REQUIRES A CONDUIT CONNECTION BETWEEN BOXES, UTILIZE
FLEXIBLE TYPE CONDUIT.
E. DEVICES INDICATED ON THIS DRAWINGS ARE DIAGRAMMATICAL ONLY.
CONTRACTOR SHALL REFER TO ARCHITECTURAL ELEVATIONS FOR
LOCATIONS OF OUTLETS, DEVICES, ETC. PRIOR TO ROUGH-IN.
F. REFERENCE MECHANICAL DRAWINGS FOR EXACT LOCATIONS AND
QUANTITIES OF DUCT SMOKE DETECTORS, FIRE/SMOKE DAMPERS AND
SMOKE CONTROL DAMPERS.
G. CONTRACTOR TO UPDATE PANEL DIRECTORY UPON COMPLETION.
NEW AND REUSED CIRCUITS ARE TO BE DISTINGUISHED FROM
EXISTING AND NOT RE-USED CIRCUITS BY THE USE OF A BOLD TYPE
FONT.
H. EXTEND RELOCATED MECHANICAL EQUIPMENT CONNECTIONS AS
REQUIRED. COORDINATE WITH MECHANICAL CONTRACTOR.
SMC #1
GUTTER 1..................................................26'
DS TO GROUND (2 @ 12' * 2)................. 48'
SUB-TOTAL: 74' +/-
GUTTER 2.................................................... 91'
DS TO GROUND (4 @ 14' * 2)......................112'
SUB-TOTAL: 203 +/-
TOTAL: 277' +/-
[PRELIMINARY DESIGN BASED ON SEPARATING GUTTERS
AND SERVING GUTTER WITH A 30A2P FEED / CONTROLLER]
ESTIMATED TOTAL HEAT TRACE SYSTEM CABLE LENGTH:
SMC #2
GUTTER 1..................................................110'
DS TO GROUND (6 @ 13' * 2)................. 156'
SUB-TOTAL: 266' +/-
GUTTER 2.................................................... 16'
DS TO GROUND (1 @ 11' * 2)......................22'
SUB-TOTAL: 38 +/-
TOTAL: 304' +/-
[PRELIMINARY DESIGN BASED ON SEPARATING GUTTERS
AND SERVING GUTTER WITH A 30A2P FEED / CONTROLLER]
REV. DATE DESCRIPTION
2 09/28/2026 Bidding Addendum #3
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 9
1345 NW WALL, SUITE 101
BEND, OREGON 97701
(541) 318-0404 cea@cea-engineering.com
COPYRIGHT 2026
STEELE ASSOCIATES ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L C
N
W P
O T
T S
C T
S
U
IT
E
B E
N D
O
R
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
5 4 3 2 16
B
C
D
E
B
C
D
E
AA
/2
/2
:5 :2
P
M
E501
CEACEA
17127.02
P E
R M
IT
S
E T
E L E
C T
R
IC
A L
P A
N E
L S
C H
E D
U L
E S
ELECTRICAL PANEL
SCHEDULES
09/04/2026
K L A
M A
T H
T R
IB
E
S F
IT
N
E S
S A
D D
IT
IO
N
Notes:
Total Est. Demand Current: 220 A
Receptacle 16380 VA 80.53% 13190 VA Total Conn. Current: 292 A
Lighting 4734 VA 125.00% 5918 VA Total Est. Demand: 79421 VA
Kitchen Equipment - Non-Dwelling Unit 61400 VA 65.00% 39910 VA Total Conn. Load: 105224 VA
Equipment 22824 VA 90.00% 20542 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 305 A 282 A 292 A
Total Load: 36464 VA 33845 VA 34915 VA
83 84
81 82
79 80
77 78
75 Spare -- 20 A 1 0 76
73 Spare -- 20 A 1 0 74
71 Spare -- 20 A 1 0 0 1 20 A -- Spare 72
69 Spare -- 20 A 1 0 0 1 20 A -- Spare 70
67 0 1 20 A -- Spare 68
65 Receptacle-Kitchen Recept... 20 A 1 900 0 1 20 A -- Spare 66
63 Dishwasher Kitche... 20 A 1 1200 900 1 20 A Recept... Receptacle-Kitchen 64
61 Equipment Equip... 20 A 1 1000 900 1 20 A Kitche... Kitchen Equipment - Non-Dwelling Unit 62
59 Refrigerator Kitche... 20 A 1 800 4000 -- -- -- -- 60
57 -- -- -- -- 0 4000 2 50 A Kitche... Oven(55/3G) 58
55 SMC#1(30/3G) Equip... 30 A 2 3324 5000 -- -- -- -- 56
53 Equipment Kitche... 20 A 1 1200 5000 -- -- -- -- 54
51 Motor Kitche... 20 A 1 900 5000 3 60 A Equip... WH-1(70/3G) 52
49 Motor Kitche... 20 A 1 900 900 1 20 A Kitche... Motor 50
47 Lighting Lighting 20 A 1 1175 1397 1 20 A Lighting Lighting 48
45 Lighting Lighting 20 A 1 280 755 1 20 A Lighting Lighting 46
43 Receptacle-Roof Recept... 20 A 1 360 1177 1 20 A Lighting Lighting 44
41 Receptacle-Bathrooms Recept... 20 A 1 1080 900 1 20 A Kitche... Motor 42
39 Receptacle-Wellness Recept... 20 A 1 720 1080 1 20 A Recept... Receptacle-Physical Therapy 40
37 Motor Kitche... 20 A 1 900 900 1 20 A Recept... Receptacle-Sauna 38
35 Sauna Equip... 20 A 1 1200 720 1 20 A Recept... Receptacle-Massage/Chiro 36
33 Water Fountain Equip... 20 A 1 500 360 1 20 A Recept... Receptacle-Cafe/Red Light 34
31 -- -- -- -- 4000 1200 1 20 A Equip... Cold Plunge 32
29 Oven(55/3G) Kitche... 50 A 2 4000 900 1 20 A Recept... Receptacle-Health Assess. 30
27 -- -- -- -- 4000 4000 -- -- -- -- 28
25 Oven(55/3G) Kitche... 50 A 2 4000 4000 2 50 A Kitche... Oven(55/3G) 26
23 Refrigerator Kitche... 20 A 1 800 4000 -- -- -- -- 24
21 Refrigerator Kitche... 20 A 1 800 4000 2 50 A Kitche... Oven(55/3G) 22
19 Refrigerator Kitche... 20 A 1 800 800 1 20 A Kitche... Refrigerator 20
17 Receptacle-Kitchen Kitche... 20 A 1 1200 1200 1 20 A Kitche... Equipment 18
15 Receptacle-Microwave Kitche... 20 A 1 1200 1200 1 20 A Kitche... Receptacle-Kitchen 16
13 Receptacle-Kitchen Recept... 20 A 1 900 1200 1 20 A Kitche... Receptacle-Kitchen 14
11 Receptacle-General Kitchen Recept... 20 A 1 1620 1200 1 20 A Kitche... Dishwasher 12
9 Spare -- 20 A 1 0 1200 1 20 A Kitche... Dishwasher 10
7 Receptacle-Fitness Studio Recept... 20 A 1 900 1080 1 20 A Recept... Receptacle 8
5 Receptacle-Office Recept... 20 A 1 1080 600 1 20 A Equip... Hoods 6
3 Receptacle-Office Recept... 20 A 1 1080 720 1 20 A Recept... Receptacle-I.T/Storage 4
1 Receptacle-Office Recept... 20 A 1 1080 1200 1 20 A Kitche... Receptacle-Kitchen 2
CKT Circuit Description Demand
Code TRIP P
A B C
P TRIP
Demand
Code Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 300 A
Supply From: DP Phases: 3 Mains Type: MLO
Location: I.T. 137 Volts: 120/208 Wye A.I.C. Rating: 35k
Branch Panel: LRP:5
Notes:
Receptacle 30020 VA 66.66% 20010 VA Total Est. Demand Current: 111 A
Motor 1000 VA 100.00% 1000 VA Total Conn. Current: 143 A
Lighting 4389 VA 125.00% 5487 VA Total Est. Demand: 39871 VA
Kitchen Equipment - Non-Dwelling Unit 5300 VA 70.00% 3710 VA Total Conn. Load: 51510 VA
Equipment 11000 VA 90.00% 9900 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 166 A 136 A 129 A
Total Load: 19786 VA 16254 VA 15471 VA
83 84
81 82
79 80
77 78
75 76
73 74
71 Gym Fan Equip... 20 A 1 500 72
69 Gym Fan Equip... 20 A 1 500 70
67 Spare -- 20 A 1 0 68
65 Spare -- 20 A 1 0 0 1 20 A -- Spare 66
63 Spare -- 20 A 1 0 0 1 20 A -- Spare 64
61 Spare -- 20 A 1 0 0 1 20 A -- Spare 62
59 Receptacle-Storage Recept... 20 A 1 720 0 1 20 A -- Spare 60
57 Receptacle-Fitness Equipment Recept... 20 A 1 1000 720 1 20 A Recept... Receptacle 58
55 Receptacle-Fitness Equipment Recept... 20 A 1 1000 1080 1 20 A Recept... Receptacle-Lounge 56
53 Receptacle-Fitness Equipment Recept... 20 A 1 1000 1000 1 20 A Recept... Receptacle-Fitness Equipment 54
51 Receptacle-Fitness Equipment Recept... 20 A 1 1000 1000 1 20 A Recept... Receptacle-Fitness Equipment 52
49 Receptacle-Fitness Equipment Recept... 20 A 1 1000 1000 1 20 A Recept... Receptacle-Fitness Equipment 50
47 Receptacle-Smoothie Cafe Recept... 20 A 1 360 1500 -- -- -- -- 48
45 Refrigerator-Smoothie Kitche... 20 A 1 800 1500 2 20 A Equip... WH-2 46
43 Receptacle-Community Room Recept... 20 A 1 180 3500 1 40 A Equip... IEWH-1(40/2G) 44
41 Receptacle-Roof Recept... 20 A 1 540 180 1 20 A Recept... Receptacle-Community Room 42
39 TV Equipment Equip... 20 A 1 500 1080 1 20 A Recept... Receptacle-Community Room 40
37 TV Equipment Equip... 20 A 1 500 1306 1 20 A Lighting Lighting 38
35 Dishwasher-Smoothie Kitche... 20 A 1 1200 500 1 20 A Equip... Projector 36
33 Receptacle-Smoothie Cafe Recept... 20 A 1 180 500 1 20 A Equip... Projector 34
31 Ice Maker-Smoothie Kitche... 20 A 1 1200 900 1 20 A Kitche... Disposal-Smoothie 32
29 Treadmill Recept... 20 A 1 1200 1200 1 20 A Kitche... Freezer-Smoothie 30
27 Treadmill Recept... 20 A 1 1200 180 1 20 A Recept... Receptacle-Community Room 28
25 Treadmill Recept... 20 A 1 1200 1200 1 20 A Recept... Treadmill 26
23 Receptacle-I.T. Equipment Recept... 20 A 1 360 1200 1 20 A Recept... Treadmill 24
21 Receptacle-I.T. Equipment Recept... 20 A 1 360 1200 1 20 A Recept... Treadmill 22
19 Receptacle-I.T. Equipment Recept... 20 A 1 360 1200 1 20 A Recept... Treadmill 20
17 Fire Alarm Control Panel Equip... 20 A 1 500 360 1 20 A Recept... Receptacle-I.T. Equipment 18
15 Lighting-Lobby/Storage Lighting 20 A 1 486 360 1 20 A Recept... Receptacle-I.T. Equipment 16
13 Receptacle Recept... 20 A 1 1200 360 1 20 A Recept... Receptacle-I.T. Equipment 14
11 Water Fountain Equip... 20 A 1 500 1123 1 20 A Lighting Lighting-Offices/Fitness 12
9 Receptacle-Fitness Recept... 20 A 1 720 1474 1 20 A Lighting Lighting-Kitchen 10
7 Receptacle-Fitness Recept... 20 A 1 900 500 1 20 A Equip... Water Fountain 8
5 Overhead Door Motor 30 A 1 500 1080 1 20 A Recept... Receptacle-Lobby 6
3 Overhead Door Motor 30 A 1 500 1080 1 20 A Recept... Receptacle-Mech/Bathrooms 4
1 Receptacle-Fitness Storage Recept... 20 A 1 1080 180 1 20 A Recept... Receptacle-Community Room 2
CKT Circuit Description Demand
Code TRIP P
A B C
P TRIP
Demand
Code Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: DP Phases: 3 Mains Type: MLO
Location: MECH 105 Volts: 120/208 Wye A.I.C. Rating: 35k
Branch Panel: LRP:4
(1) Provide breaker with ARMS function
Notes:
Receptacle 46400 VA 60.78% 28200 VA
Motor 1000 VA 100.00% 1000 VA
Lighting 9114 VA 125.00% 11393 VA Total Est. Demand Current: 1530 A
Kitchen Equipment - Non-Dwelling Unit 66700 VA 65.00% 43355 VA Total Conn. Current: 1448 A
HVAC 63619 VA 100.00% 63619 VA Total Est. Demand: 551266 VA
Existing Load 292700 VA 125.00% 365875 VA Total Conn. Load: 521684 VA
Equipment 42472 VA 90.00% 38225 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
1448 A
521684 VA
3 SPD 3 60 A 0 VA
2 DP 3 1000 A 228991 VA
1 MDP(1) 3 1200 A 292700 VA
CKT Circuit Description # of Poles Trip Rating
Load
Remarks
Provide SPD in switchboard
Notes:
Enclosure: NEMA 3R
Mounting: Exterior pad Wires: 4 Mains Rating: 2000 A
Supply From: Phases: 3 Mains Type: MLO
Location: Volts: 120/208 Wye A.I.C. Rating: 100k
Switchboard: MSB
Notes:
Receptacle 46400 VA 60.78% 28200 VA
Motor 1000 VA 100.00% 1000 VA Total Est. Demand Current: 515 A
Lighting 9114 VA 125.00% 11393 VA Total Conn. Current: 636 A
Kitchen Equipment - Non-Dwelling Unit 66700 VA 65.00% 43355 VA Total Est. Demand: 185407 VA
HVAC 63619 VA 100.00% 63619 VA Total Conn. Load: 228991 VA
Equipment 42472 VA 90.00% 38225 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
636 A
228991 VA
9 SMC#2(30/3G) 2 30 A 3648 VA
8 Gen Control Panel(70/3G) 2 60 A 5000 VA
7 LRP:5 3 300 A 105224 VA
6 LRP:4 3 200 A 51510 VA
5 RTU-5(40/3G) 3 35 A 6768 VA
4 RTU-4(40/3G) 3 35 A 6768 VA
3 RTU-3(55/3G) 3 50 A 12586 VA
2 RTU-2(85/3G) 3 80 A 18749 VA
1 RTU-1(85/3G) 3 80 A 18749 VA
CKT Circuit Description # of Poles Trip Rating Load Remarks
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 1000 A
Supply From: MSB Phases: 3 Mains Type: MLO
Location: MECH 105 Volts: 120/208 Wye A.I.C. Rating: 65k
Distribution Panel: DP Exterior Utility transformer
REV. DATE DESCRIPTION
1 09/25/2026 Bidding Addendum #2
2 09/28/2026 Bidding Addendum #3
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 10
1. HEATING AND COOLING EQUIPMENT AND SYSTEMS CAPACITY DO NOT
EXCEED THE LOADS.
2. THE SUPPLY OF HEATING AND COOLING ENERGY TO EACH ZONE IS
CONTROLLED BY INDIVIDUAL THERMOSTATIC CONTROLS THAT
RESPOND TO TEMPERATURE WITHIN THE ZONE.
3. WHERE USED TO CONTROL BOTH HEATING AND COOLING, ZONE
THERMOSTATIC CONTROLS PROVIDE A TEMPERATURE RANGE OR
DEADBAND OF AT LEAST 5°F (2.8°C) WITHIN WHICH THE SUPPLY OF
HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING
SHUT OFF OR REDUCED TO A MINIMUM.
4. PROVIDE CONTROLS FOR EACH HVAC SYSTEM THAT VARY THE START-
UP TIME OF THE SYSTEM TO JUST MEET THE TEMPERATURE SET POINT
AT TIME OF OCCUPANCY.
5. PROVIDE EACH ZONE WITH THERMOSTATIC SETBACK CONTROLS THAT
ARE CONTROLLED BY PROGRAMMABLE CONTROL SYSTEM.
6. SHUTOFF DAMPER CONTROLS: OUTDOOR AIR SUPPLY AND EXHAUST
TO BE EQUIPPED WITH NOT LESS THAN CLASS I MOTORIZED DAMPERS.
7. ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND
CONNECTIONS OF LOW-PRESSURE SUPPLY AND RETURN DUCTS ARE
TO BE SECURELY FASTENED AND SEALED WITH GASKETS, MASTICS
(ADHESIVES), MASTIC-PLUS-EMBEDDED-FABRIC SYSTEMS OR TAPES
INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S
INSTALLATION INSTRUCTIONS.
8. THE CONSTRUCTION DOCUMENTS REQUIRE THAT AN OPERATING AND
MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING OWNER BY
THE MECHANICAL CONTRACTOR.
9. FAN SYSTEM DESIGN CONDITIONS DOES NOT EXCEED THE ALLOWABLE
FAN SYSTEM MOTOR NAMEPLATE HP OR FAN SYSTEM BHP.
10. FOR EACH FAN, THE SELECTED FAN MOTOR IS NO LARGER THAN THE
FIRST AVAILABLE MOTOR SIZE GREATER THAN THE BRAKE
HORSEPOWER (BHP).
11. COOLING SYSTEMS DO NOT USE HOT GAS BYPASS.
12. MOTORS FOR FANS THAT ARE NOT LESS THAN 1/12 HP AND LESS THAN
1 HP ARE ELECTRONICALLY COMMUTATED MOTORS OR HAVE A
MINIMUM MOTOR EFFICIENCY OF 70 PERCENT. PROVIDE MEANS TO
ADJUST MOTOR SPEED.
13. HVAC DUCTS AND PLENUMS SHALL BE INSULATED IN ACCORDANCE
WITH C403.11.1 AND CONSTRUCTED IN ACCORDANCE WITH C403.11.2.
14. HEAT PUMP CONTROLS SHALL PREVENT SUPPLEMENTAL ELECTRIC
RESISTANCE HEAT FROM COMING ON WHEN NOT NEEDED.
15. TEMPERATURE CONTROLS SHALL HAVE SETPOINT OVERLAP
RESTRICTIONS.
16. PROVIDE AUTOMATIC CONTROLS WITH SETBACK TO 55°F (HEAT) AND
85°F (COOL); 7-DAY CLOCK, 2-HOUR OCCUPANT OVERIDE, 10-HOUR
BACKUP.
17. SYSTEMS SHALL INCLUDE OPTIMUM START CONTROLS.
18. FURNISHED HVAC AS-BUILT DRAWINGS SUBMITTED WITHIN 90 DAYS OF
SYSTEM ACCEPTANCE.
19. PROVIDE AIR SYSTEM BALANCING REPORT FOR HVAC SYSTEMS.
20. COMPLIANCE WITH SECTION 6 - "HEATING, VENTILATION AND AIR
CONDITIONING" OF THE ASHRAE STANDARD 90.1 - 2022 SHALL BE
ACHIEVED BY MEETING ALL REQUIREMENTS OF SECTIONS: SECTION
6.1 - "GENERAL", SECTION 6.2 - "COMPLIANCE PATHS", SECTION
6.7 -"SUBMITTALS", AND SECTION 6.8 - " MINIMUM EQUIPMENT
EFFICIENCY TABLES".
ENERGY CODE COMPLIANCE REQUIREMENTS
1. TEMPERATURE CONTROL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LOW
VOLTAGE TEMPERATURE CONTROL WIRING REQUIRED FOR THIS PROJECT.
2. CONTRACTOR SHALL COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR
TO FABRICATING AND/OR INSTALLING ANY OF THEIR WORK.
3. ALL BASE BUILDING SUPPLY AND RETURN DUCTWORK SHALL BE OF SHEET
METAL CONSTRUCTION. INSULATE ALL OUTSIDE AIR DUCTWORK AND EXHAUST
AIR DUCTWORK FROM EXHAUST FAN BDD TO EXTERIOR TERMINATION W/
INSULATION AS REQUIRED BY OMSC 604 & ASHRAE 90.1. NOTE THAT ALL
INDICATED DUCT SIZES ARE CLEAR INSIDE DIMENSIONS.
4. WHERE FLEXIBLE DUCT IS USED, IT SHALL NOT EXCEED 10'-0" IN LENGTH FOR 8"
DIAMETER DUCTS AND LARGER, 5'-0" FOR 6" DIAMETER DUCTS AND SMALLER.
FLEXIBLE DUCTWORK SHALL BE INSTALLED PER THE MANUFACTURERS
INSTRUCTIONS, W/ REMAINING RUN-OUT LENGTHS TO BE CONSTRUCTED FROM
ROUND GALVANIZED DUCT.
5. ALL LOW VELOCITY DUCTWORK SHALL BE CONSTRUCTED FOR 2.0" STATIC
PRESSURE.
6. ALL SUPPLY AIR DUCT JOINTS (LOW VELOCITY) SHALL BE SEALED WITH HARD
CAST DT-5300 TAPE W/ RTA-50 ADHESIVE OR NEXUS "TDF" TYPE FLANGE
JOINTS.
7. PROVIDE COMPLETE TESTING & BALANCING SERVICES. BY CERTIFIED T&B
CONTRACTOR. SUBMIT WRITTEN REPORT NOTING ANY DEFICIENCIES.
8. ALL EQUIPMENT SHALL HAVE PERMANENT NAME PLATES. CONDENSING UNITS
TO HAVE NAMEPLATES IDENTIFYING. WHICH FURNACE THE CONDENSING UNIT
SERVES.
9. PROVIDE O&M MANUALS & OWNER TRAINING.
10. ALL EXPOSED ROUND DUCTWORK TO BE OF GALVANIZED SPIRAL
CONSTRUCTION CAPABLE OF ACCEPTING & MAINTAINING A PAINTED FINISH.
GENERAL NOTES
MINIMUM DUCT INSULATION
PER ASHRAE 90.1 TABLE 6.8.2
DUCTWORK OUTSIDE
HERMAL ENVELOPE
(SEE NOTE 1)
UNCONDITIONED
SPACE OR BURIED
INDIRECTLY CONDITIONED
SPACE (SEE NOTES 2,3)
HEATING & COOLING
R-12 R-6 R-1.9
HEATING ONLY
R-12 R-6 R-1.9
COOLING ONLY
R-8 R-6 R-1.9
NOTES:
1. INCLUDES ATTICS ABOVE INSULATED CEILINGS, PARKING GARAGES, CRAWL
SPACES.
2. INCLUDES RETURN AIR PLENUMS.
3. RETURN DUCTS DO NOT REQUIRE INSULATION.
COPYRIGHT 2026
STEELE ASSOCIATES ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L C
N
W P
O T
T S
C T
S
U
IT
E
B E
N D
O
R
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
5 4 3 2 16
B
C
D
E
B
C
D
E
AA
1345 NW WALL, SUITE 101
BEND, OREGON 97701
(541) 318-0404 cea@cea-engineering.com
/2
/2
:2 :4
P
M
M001
KSEM
E1432
P E
R M
IT
S
E T
S C
H E
D U
L E
S
N O
T E
S
SCHEDULES & NOTES
09/04/2026
K L A
M A
T H
T R
IB
E
S F
IT
N
E S
S A
D D
IT
IO
N
4. PROVIDE W/ DEMAND CONTROL VENTILATION.
3. PROVIDE W/ SUPPLY AND RETURN SMOKE DETECTORS.
2. PROVIDE W/ SINGLE ZONE VAV CONTROL.
1. PROVIDE W/ VIBRATION ISOLATION.
NOTES:
PACKAGED ROOF TOP UNIT - AIR COOLED SCHEDULE
MARK MFR MDL
SAF
CFM
OA
CFM ESP
COOLING HEATING
VOLTAGE PH MCA MOP
IEER
(SEER2) WEIGHT DOWN/HORIZ. ECONOMIZER? NOTES
TOTAL
MBH
SENSIBLE
MBH EDB EWB
AMBIENT
TEMP
ELEC. STRIP
CAPACITY (KW)
HEAT PUMP
CAPACITY (MBH)
RTU-1 DAIKIN DSH1503D 5,000 1,490 0.5 150 143 80 67 95 30 143 208 3 65.1 80 14.2 1,400 DOWN YES 1, 2, 3, 4
RTU-2 DAIKIN DSH1503D 5,000 1,875 0.5 150 143 80 67 95 30 143 208 3 65.1 80 14.2 1,400 DOWN YES 1, 2, 3, 4
RTU-3 DAIKIN DSH1023D 3,400 785 0.75 102 87.4 80 67 95 30 97 208 3 43.7 50 15.5 1,200 DOWN YES 1, 3
RTU-4 DAIKIN DSH0483D 1,600 490 0.5 48 46 80 67 95 15 45 208 3 23.5 35 (13.7) 600 DOWN NO 1, 4
RTU-5 DAIKIN DSH0483D 1,600 215 0.5 48 46 80 67 95 15 45 208 3 23.5 35 (13.7) 600 DOWN NO 1
1. PROVIDE TRIM PACKAGE, SAFETY LIMITS, COLOR BY ARCHITECT. PROVIDE WALL MOUNTED THERMOSTAT.
NOTES:
ELECTRIC WALL HEATER
MARK MFR MDL CFM WATTS
ELECTRICAL
WEIGHT NOTESVOLTS PH AMPS
EWH-1 QMARK CWH1202DSF 50 1500 208 1 7.3 10 WALL MOUNTED. INTEGRAL THERMOSTAT.
DAMPER SCHEDULE
MARK MFR MDL ROUND DAMPER DIAMETER CFM NOTES
BD-1 PROLON PL-AV20 20" 2,720
ZD-1 PROLON PL-AV12 12" 790
ZD-2 PROLON PL-AV16 16" 1,350
ZD-3 PROLON PL-AV16 16" 1,260
1. PROVIDE W/ BACKDRAFT DAMPER.
NOTES:
EXHAUST FAN SCHEDULE
MARK MFR MDL CFM ESP
ELECTRICAL
WEIGHT LBS NOTESVOLTS PH FLA
EF-1 GREENHECK SP-A90 80 0.2 115 1 0.17 20 1
EF-2 GREENHECK SP-A390 320 0.2 115 1 1.42 20 1
COLOR SELECTION/FINISH OF ALL GRILLES AND DIFFUSERS SHALL BE BY ARCHITECT.
NOTES:
AIR DEVICE SCHEDULE
MARK MFR MDL SYSTEM TYPE NOTES
A TITUS PAS SUPPLY 24"x24" LAY-IN FACE DIFFUSER, STEEL, NECK SIZE AS INDICATED ON PLANS. PROVIDE W/ INTEGRAL BALANCING DAMPER.
B TITUS PAS SUPPLY 12"x12" LAY-IN FACE DIFFUSER, STEEL, NECK SIZE AS INDICATED ON PLANS. PROVIDE W/ INTEGRAL BALANCING DAMPER.
C TITUS 300RL SUPPLY SURFACE MOUNT LOUVERED SUPPLY GRILLE, STEEL. NECK SIZE AS INDICATED ON PLANS. PROVIDE W/ OPPOSED BLADE DAMPER.
D TITUS PAR RETURN 24"x24" FLUSH FACE, LAY-IN PERFORATED FACE DIFFUSER. NECK SIZE AS INDICATED ON PLANS.
E TITUS 350RL RETURN SURFACE MOUNT LOUVERED RETURN GRILLE, STEEL. NECK SIZE AS INDICATED ON PLANS.
VENTILATION SCHEDULE
ROOM NAME
ROOM
NUMBER
OCCUPANCY BASED
AREABASED
/ EZ =
CFM OSA
CALCULATED NOTESPEOPLE
CFM PER
PERSON TOTAL CFM AREA CFM/SF
TOTAL
CFM
CHIRO OFFICE 109 1 5 5 116 SF 0.06 7 0.8 15
COMMUNITY ROOM 108 230 5 1150 4656 SF 0.06 279 0.8 1787
COMMUNITY ROOM STORAGE 129 0 0 0 532 SF 0.06 32 0.8 40
FACILITY MANAGER OFFICE 134 1 5 5 96 SF 0.06 6 0.8 14
FACILITY STORAGE 132 0 0 0 163 SF 0.06 10 0.8 13
FITNESS STORAGE 102 0 0 0 445 SF 0.06 27 0.8 34
FITNESS STUDIO 130 16 20 320 1154 SF 0.06 69 0.8 487
HALL 123 0 5 0 709 SF 0.06 43 0.8 54
HALL 169 0 5 0 426 SF 0.06 26 0.8 32
HEALTH ASSESS. 120 3 7.5 22.5 161 SF 0.18 29 0.8 65
I.T. OFFICE 136 2 5 10 97 SF 0.06 6 0.8 20
KITCHEN STORAGE 116 0 0 0 76 SF 0.06 5 0.8 6
LOBBY 100 5 5 25 691 SF 0.06 41 0.8 84
LOUNGE 124 15 7.5 112.5 451 SF 0.18 81 0.8 243
MAIN WORKOUT SPACE 107 45 20 900 4405 SF 0.06 264 0.8 1456
MASSAGE 110 2 5 10 115 SF 0.06 7 0.8 22
OFFICE 112 1 5 5 99 SF 0.06 6 0.8 14
OFFICE 131 1 5 5 99 SF 0.06 6 0.8 14
OFFICE 132 1 5 5 97 SF 0.06 6 0.8 14
PHYSICAL THERAPY 112 2 5 10 184 SF 0.06 11 0.8 27
RED LIGHT 113 1 5 5 92 SF 0.06 5 0.8 14
REGISTERED DIETITIAN OFFICE 128 2 5 10 99 SF 0.06 6 0.8 20
SAUNA ROOM 115 2 5 10 201 SF 0.06 12 0.8 28
SMOOTHIE CAFE 125 2 5 10 174 SF 0.06 10 0.8 26
STORAGE 114 0 0 0 81 SF 0.06 5 0.8 7
STUDIO STORAGE 133 0 0 0 229 SF 0.06 14 0.8 18
TEACHING KITCHEN 119 10 7.5 75 803 SF 0.12 96 0.8 215
TRAINERS 106 3 5 15 250 SF 0.06 15 0.8 38
WELLNESS 111 2 5 10 357 SF 0.06 21 0.8 40
REV. DATE DESCRIPTION
1 09/25/2026 BIDDING ADDENDUM #2
2 09/28/2026 BIDDING ADDENDUM #3
HVLS FAN SCHEDULE
MARK MFR MDL SERVICE DIAMETER RPM AMPS VOLT PH WEIGHT NOTES
HVLS-1 BIG ASS FANS ESSENCE MAIN WORKOUT SPACE 10' - 0" 107 10 120 1 85
HVLS-2 BIG ASS FANS ESSENCE MAIN WORKOUT SPACE 10' - 0" 107 10 120 1 85
RFP-KTHFS-2026-003 – ADDENDUM #3 – Chiloquin Fitness Center Expansion Project Page 11
| Addendum 3--RFP Sheet.pdf |
| Chiloquin Fitness Center - Addendum #3.pdf |
| E202 - ROOF POWER PLAN |
| E501 - ELECTRICAL PANEL SCHEDULES |
| M001 - SCHEDULES & NOTES |
File details come from the government source that posted it. Updated .