Exhibit C5 Erosion and Sediment Control.pdf
PDF 65 KB Posted
- Attached to
- Operations and Maintenance services for Fort Smith, AR and Full Maintenance services for Fayetteville, AR
- Solicitation number
- 47PH0220R0002
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 This is a sample and is not intended to be comprehensive. Excerpts are from United States Green Building Council (USGBC).
· Quality Assurance/Quality Control Processes
· Composting
· Landscape Management and Grounds Maintenance
· Storm-Water Management Plan
· Erosion and Sediment Control
· Integrated Pest Management (IPM)
· Chemical Treatment Purchasing and Application
· Training
· Performance Measurement
· Guidance for Resources and Implementation
· Responsible Parties
· Goals and Scope related services portion of the plan shall address the following items:
Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth conditions Used only when Contractor is required to perform activities that disturbs the existing grounds
IPM, Erosion Control, Landscape Management Plan1
EROSION AND SEDIMENT CONTROL
EXHIBIT C5
File details come from the government source that posted it. Updated .