Exhibit C4 Building Exterior and Hardscape Plan.pdf
PDF 59 KB Posted
- Attached to
- Operations and Maintenance services for Fort Smith, AR and Full Maintenance services for Fayetteville, AR
- Solicitation number
- 47PH0220R0002
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
· Quality Assurance/Quality Control Processes
· Fertilizer use
· Landscape waste
· Animal and vegetation pest control
· Cleaning of sidewalks, pavement, and other Hardscape
· Cleaning equipment
· Cleaning of building exterior
· Snow and Ice removal (Snow and Ice Removal Plan can be substituted for this item)
· Paints and Sealants Used on the Building Exterior
· Sustainable Building Exterior, Sidewalks, and Pavement Cleaning
· Use of Chemical Concentrates and Dilution Systems
· Maintenance Equipment
· Training
· Performance Measurement
· Guidance for Resources and Implementation
· Responsible Party
· Goals and Scope address the following items:
surrounding landscapes. At a minimum, the custodial and related services portion of the plan shall enhance diversity and protect wildlife, while supporting building performance and integration into have the lowest environmental impact possible and that these practices preserve ecological integrity, the listed work items. The plan helps ensure that grounds/site/building exterior management practices The Contractor shall submit to the CO a detailed Building Exterior and Hardscape Plan that addresses
Used only when Contractor is required to provide pressure washing services
BUILDING EXTERIOR AND HARDSCAPE PLAN
EXHIBIT C4
File details come from the government source that posted it. Updated .