EXHIBIT C - Calculation of Self-Performed Work 36C24221R0008.docx

DOCX document 39 KB Posted

Attached to
Y1DA--36C24221R0008 is in replacement of 36C24220R0115 630-17-101 REPLACE COOLING TOWERS MANHATTAN 630-16-101 Replace Chillers Ph. II
Solicitation number
36C24221R0008
Issued by

About this file

This document contains details for a federal solicitation to replace cooling towers and chillers at a Department of Veterans Affairs medical center in Manhattan, New York. The solicitation is a service-disabled veteran-owned small business set-aside to be issued on or about October 29, 2020 via SAM.gov as replacement for solicitation number 36C24220R0115. The period of performance is 800 calendar days from notice to proceed. The estimated cost range for the project is $5-10 million to supply and install new cooling towers, chillers, piping, valves, electrical equipment, and related components. Interested parties must be registered in SAM.gov, D&B.com, and VIP.vetbiz.gov as a verified SDVOSB by the time of offer submission.

View the file

Other files

File Type Posted
36C24221R0008 0008.docx DOCX document
36C24221R0008 0007.docx DOCX document
36C24221R0008 0006.docx DOCX document
36C24221R0008 0005.docx DOCX document
NY 20210003 01-01-2021.pdf PDF
36C24221R0008 0004.docx DOCX document
Replace Cooling Towers Structural Drawings 630-17-101.pdf PDF
36C24221R0008 0003.docx DOCX document
36C24221R0008 0002.docx DOCX document
Replace Chillers Ph. II 630-16-101 Drawings Part 1.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part 2.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part I.pdf PDF
Replace Chillers Ph. II 630-16-101 Drawings Part 2.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Specs Part 2.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 3.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 2.pdf PDF
36C24221R0008 0001.docx DOCX document
Replace Cooling Towers 630-17-101 Specs Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 4.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24221R0008.docx DOCX document
36C24221R0008.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form 36C24221R0008.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24221R0008.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24221R0008.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO Request for Proposal 36C24221R0008

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %

File details come from the government source that posted it. Updated .