This notice solicits proposals for a federal construction contract to replace cooling towers and chillers at a Veterans Affairs medical center in New York City. The project involves selective demolition of existing cooling towers and associated equipment, installation of new cooling towers, concrete pads, chillers, piping, valves, electrical systems, and controls. Offerors must be verified as a Service-Disabled Veteran-Owned Small Business. The performance period is 800 calendar days from notice to proceed. Proposals are due via hard copy by the date specified in the solicitation, which will be posted on beta.sam.gov on or around October 29, 2020.

View the file

Other files

File Type Posted
36C24221R0008 0008.docx DOCX document
36C24221R0008 0007.docx DOCX document
36C24221R0008 0006.docx DOCX document
36C24221R0008 0005.docx DOCX document
NY 20210003 01-01-2021.pdf PDF
36C24221R0008 0004.docx DOCX document
Replace Cooling Towers Structural Drawings 630-17-101.pdf PDF
36C24221R0008 0003.docx DOCX document
36C24221R0008 0002.docx DOCX document
Replace Chillers Ph. II 630-16-101 Drawings Part 1.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part 2.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part I.pdf PDF
Replace Chillers Ph. II 630-16-101 Drawings Part 2.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 3.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 2.pdf PDF
36C24221R0008 0001.docx DOCX document
Replace Cooling Towers 630-17-101 Specs Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 4.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24221R0008.docx DOCX document
36C24221R0008.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form 36C24221R0008.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24221R0008.docx DOCX document
EXHIBIT C - Calculation of Self-Performed Work 36C24221R0008.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24221R0008.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA New York Harbor 423 East 23rd Street New York, NY 10010

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 41 - 1 03/04/2020

SECTION 23 05 41

NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 DESCRIPTION

Noise criteria, seismic restraints for equipment, vibration tolerance and vibration isolation for HVAC and plumbing work.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and SAMPLES.

B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

C. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

1.3 QUALITY ASSURANCE

A. Refer to article, QUALITY ASSURANCE in specification Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION.

B. Noise Criteria:

1. Noise levels in all 8 octave bands due to equipment and duct systems shall not exceed following NC levels:

TYPE OF ROOM NC LEVEL

Replace Cooling Tower Bancroft Architects + Engineers

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019

2. For equipment which has no sound power ratings scheduled on the plans, the contractor shall select equipment such that the fore-going noise criteria, local ordinance noise levels, and OSHA re-quirements are not exceeded. Selection procedure shall be in accordance with ASHRAE Fundamentals Handbook, Chapter 7, Sound and

Vibration.

3. An allowance, not to exceed 5db, may be added to the measured value to compensate for the variation of the room attenuating effect between room test condition prior to occupancy and design condition after occupancy which may include the addition of sound absorbing material, such as, furniture. This allowance may not be taken after occupancy. The room attenuating effect is defined as the difference between sound power level emitted to room and sound pressure level in room.

4. In absence of specified measurement requirements, measure equipment noise levels three feet from equipment and at an elevation of maxi-mum noise generation.

C. Seismic Restraint Requirements:

1. Equipment:

a. All mechanical equipment not supported with isolators external to the unit shall be securely anchored to the structure. Such

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019 mechanical equipment shall be properly supported to resist a horizontal force of 50 percent of the weight of the equipment furnished.

b. All mechanical equipment mounted on vibration isolators shall be provided with seismic restraints capable of resisting a horizontal force of 100 percent of the weight of the equipment furnished.

2. Piping: Refer to specification Section 23 05 11, COMMON WORK RESULTS

FOR HVAC and STEAM GENERATION.

3.

D. Allowable Vibration Tolerances for Rotating, Non-reciprocating Equip-ment: Not to exceed a self-excited vibration maximum velocity of 0.20 inch per second RMS, filter in, when measured with a vibration meter on bearing caps of machine in vertical, horizontal and axial directions or measured at equipment mounting feet if bearings are concealed.

Measurements for internally isolated fans and motors may be made at the mounting feet.

1.4 SUBMITTALS

A. Submit in accordance with specification Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, and SAMPLES.

B. Manufacturer's Literature and Data:

1. Vibration isolators:

a. Floor mountings

b. Hangers

c. Snubbers

d. Thrust restraints

2. Bases.

3. Seismic restraint provisions and bolting.

4. Acoustical enclosures.

C. Isolator manufacturer shall furnish with submittal load calculations for selection of isolators, including supplemental bases, based on lowest operating speed of equipment supported.

D. Seismic Requirements: Submittals are required for all equipment an-chors, supports and seismic restraints. Submittals shall include weights, dimensions, standard connections, and manufacturer's certification that all specified equipment will withstand seismic

Lateral Force requirements as shown on drawings.

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society of Heating, Refrigerating and Air-Conditioning

Engineers, Inc. (ASHRAE):

2009 ...................Fundamentals Handbook, Chapter 7, Sound and

Vibration

C. American Society for Testing and Materials (ASTM):

A123/A123M-09...........Standard Specification for Zinc (Hot-Dip

Galvanized) Coatings on Iron and Steel Products

A307-07b................Standard Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength

D2240-05(2010)..........Standard Test Method for Rubber Property -

Durometer Hardness

D. Manufacturers Standardization (MSS):

SP-58-2009..............Pipe Hangers and Supports-Materials, Design and

Manufacture

E. Occupational Safety and Health Administration (OSHA):

29 CFR 1910.95..........Occupational Noise Exposure

F. American Society of Civil Engineers (ASCE):

ASCE 7-10 ..............Minimum Design Loads for Buildings and Other

Structures.

G. American National Standards Institute / Sheet Metal and Air

001-2008................Seismic Restraint Manual: Guidelines for

Mechanical Systems, 3rd Edition.

H. International Code Council (ICC):

2009 IBC................International Building Code.

I. Department of Veterans Affairs (VA):

H-18-8 2010.............Seismic Design Requirements.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Type of isolator, base, and minimum static deflection shall be as required for each specific equipment application as recommended by isolator or equipment manufacturer but subject to minimum requirements indicated herein and in the schedule on the drawings.

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019

B. Elastometric Isolators shall comply with ASTM D2240 and be oil resistant neoprene with a maximum stiffness of 60 durometer and have a straight-line deflection curve.

C. Exposure to weather: Isolator housings to be either hot dipped galvanized or powder coated to ASTM B117 salt spray testing standards.

Springs to be powder coated or electro galvanized. All hardware to be electro galvanized. In addition provide limit stops to resist wind velocity. Velocity pressure established by wind shall be calculated in accordance with section 1609 of the International Building Code. A minimum wind velocity of 75 mph shall be employed.

D. Uniform Loading: Select and locate isolators to produce uniform loading and deflection even when equipment weight is not evenly distributed.

E. Color code isolators by type and size for easy identification of capacity.

2.2 SEISMIC RESTRAINT REQUIREMENTS FOR EQUIPMENTS

A. Bolt pad mounted equipment, without vibration isolators, to the floor or other support using ASTM A307 standard bolting material.

B. Floor mounted equipment, with vibration Isolators: Type SS. Where Type

N isolators are used provide channel frame base horizontal restraints bolted to the floor, or other support, on all sides of the equipment

Size and material required for the base shall be as recommended by the isolator manufacturer.

C. On all sides of suspended equipment, provide bracing for rigid supports and provide restraints for resiliently supported equipment.

2.3 VIBRATION ISOLATORS

A. Floor Mountings:

1. Double Deflection Neoprene (Type N): Shall include neoprene covered steel support plated (top and bottom), friction pads, and necessary bolt holes.

2. Spring Isolators (Type S): Shall be free-standing, laterally stable and include acoustical friction pads and leveling bolts. Isolators shall have a minimum ratio of spring diameter-to-operating spring height of 1.0 and an additional travel to solid equal to 50 percent of rated deflection.

3. Captive Spring Mount for Seismic Restraint (Type SS):

a. Design mounts to resiliently resist seismic forces in all direc-tions. Snubbing shall take place in all modes with adjustment to

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019 limit upward, downward, and horizontal travel to a maximum of

1/4-inch before contacting snubbers. Mountings shall have a minimum rating of one G coefficient of gravity as calculated and certified by a registered structural engineer.

b. All mountings shall have leveling bolts that must be rigidly bolted to the equipment. Spring diameters shall be no less than

0.8 of the compressed height of the spring at rated load. Springs shall have a minimum additional travel to solid equal to 50 percent of the rated deflection. Mountings shall have ports for spring inspection. Provide an all directional neoprene cushion collar around the equipment bolt.

4. Spring Isolators with Vertical Limit Stops (Type SP): Similar to spring isolators noted above, except include a vertical limit stop to limit upward travel if weight is removed and also to reduce movement and spring extension due to wind loads. Provide clearance around restraining bolts to prevent mechanical short circuiting.

Isolators shall have a minimum seismic rating of one G.

5. Pads (Type D), Washers (Type W), and Bushings (Type L): Pads shall be natural rubber or neoprene waffle, neoprene and steel waffle, or reinforced duck and neoprene. Washers and bushings shall be reinforced duck and neoprene. Washers and bushings shall be reinforced duck and neoprene. Size pads for a maximum load of 50 pounds per square inch.

6. Seismic Pad (Type DS): Pads shall be natural rubber / neoprene waffle with steel top plate and drilled for an anchor bolt. Washers and bushings shall be reinforced duck and neoprene. Size pads for a maximum load of 50 pounds per square inch.

B. Hangers: Shall be combination neoprene and springs unless otherwise noted and shall allow for expansion of pipe.

1. Combination Neoprene and Spring (Type H): Vibration hanger shall contain a spring and double deflection neoprene element in series.

Spring shall have a diameter not less than 0.8 of compressed oper-ating spring height. Spring shall have a minimum additional travel of 50 percent between design height and solid height. Spring shall permit a 15 degree angular misalignment without rubbing on hanger box.

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019

2. Spring Position Hanger (Type HP): Similar to combination neoprene and spring hanger except hanger shall hold piping at a fixed elevation during installation and include a secondary adjustment feature to transfer load to spring while maintaining same position.

3. Neoprene (Type HN): Vibration hanger shall contain a double deflection type neoprene isolation element. Hanger rod shall be separated from contact with hanger bracket by a neoprene grommet.

4. Spring (Type HS): Vibration hanger shall contain a coiled steel spring in series with a neoprene grommet. Spring shall have a diameter not less than 0.8 of compressed operating spring height.

Spring shall have a minimum additional travel of 50 percent between design height and solid height. Spring shall permit a 15 degree angular misalignment without rubbing on hanger box.

5. Hanger supports for piping 2 inches and larger shall have a pointer and scale deflection indicator.

6. Hangers used in seismic applications shall be provided with a hanger housing in operation to prevent spring from excessive upward travel

C. Snubbers: Each spring mounted base shall have a minimum of four all-directional or eight two directional (two per side) seismic snubbers that are double acting. Elastomeric materials shall be shock absorbent neoprene bridge quality bearing pads, maximum 60 durometer, replaceable and have a minimum thickness of 1/4 inch. Air gap between hard and resilient material shall be not less than 1/8 inch nor more than 1/4 inch. Restraints shall be capable of withstanding design load without permanent deformation.

D. Thrust Restraints (Type THR): Restraints shall provide a spring element contained in a steel frame with neoprene pads at each end attachment.

Restraints shall have factory preset thrust and be field adjustable to allow a maximum movement of 1/4 inch when the fan starts and stops.

Restraint assemblies shall include rods, angle brackets and other hardware for field installation.

2.4 BASES

A. Rails (Type R): Design rails with isolator brackets to reduce mounting height of equipment and cradle machines having legs or bases that do not require a complete supplementary base. To assure adequate

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019 stiffness, height of members shall be a minimum of 1/12 of longest base dimension but not less than 4 inches. Where rails are used with neoprene mounts for small fans or close coupled pumps, extend rails to compensate overhang of housing.

B. Integral Structural Steel Base (Type B): Design base with isolator brackets to reduce mounting height of equipment which require a complete supplementary rigid base. To assure adequate stiffness, height of members shall be a minimum of 1/12 of longest base dimension, but not less than four inches.

C. Inertia Base (Type I): Base shall be a reinforced concrete inertia base. Pour concrete into a welded steel channel frame, incorporating prelocated equipment anchor bolts and pipe sleeves. Level the concrete to provide a smooth uniform bearing surface for equipment mounting.

Provide grout under uneven supports. Channel depth shall be a minimum of 1/12 of longest dimension of base but not less than six inches. Form shall include 1/2-inch reinforcing bars welded in place on minimum of eight inch centers running both ways in a layer 1-1/2 inches above bottom. Use height saving brackets in all mounting locations. Weight of inertia base shall be equal to or greater than weight of equipment supported to provide a maximum peak-to-peak displacement of 1/16 inch.

D. Curb Mounted Isolation Base (Type CB): Fabricate from aluminum to fit on top of standard curb with overlap to allow water run-off and have wind and water seals which shall not interfere with spring action.

Provide resilient snubbers with 1/4 inch clearance for wind resistance.

Top and bottom bearing surfaces shall have sponge type weather seals.

Integral spring isolators shall comply with Spring Isolator (Type S) requirements.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Vibration Isolation:

1. No metal-to-metal contact will be permitted between fixed and floating parts.

2. Connections to Equipment: Allow for deflections equal to or greater than equipment deflections. Electrical, drain, piping connections, and other items made to rotating or reciprocating equipment (pumps, compressors, etc.) which rests on vibration isolators, shall be

Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019 isolated from building structure for first three hangers or supports with a deflection equal to that used on the corresponding equipment.

3. Common Foundation: Mount each electric motor on same foundation as driven machine. Hold driving motor and driven machine in positive rigid alignment with provision for adjusting motor alignment and belt tension. Bases shall be level throughout length and width.

Provide shims to facilitate pipe connections, leveling, and bolting.

4. Provide heat shields where elastomers are subject to temperatures over l00 degrees F.

5. Extend bases for pipe elbow supports at discharge and suction connections at pumps. Pipe elbow supports shall not short circuit pump vibration to structure.

6. Non-rotating equipment such as heat exchangers and convertors shall be mounted on isolation units having the same static deflection as the isolation hangers or support of the pipe connected to the equipment.

B. Inspection and Adjustments: Check for vibration and noise transmission through connections, piping, ductwork, foundations, and walls. Adjust, repair, or replace isolators as required to reduce vibration and noise transmissions to specified levels.

3.2 ADJUSTING

A. Adjust vibration isolators after piping systems are filled and equipment is at operating weight.

B. Adjust limit stops on restrained spring isolators to mount equipment at normal operating height. After equipment installation is complete, adjust limit stops so they are out of contact during normal operation.

C. Attach thrust limits at centerline of thrust and adjust to a maximum of

1/4inch movement during start and stop.

D. Adjust active height of spring isolators.

E. Adjust snubbers according to manufacturer's recommendations.

F. Adjust seismic restraints to permit free movement of equipment within normal mode of operation.

G. Torque anchor bolts according to equipment manufacturer's recommendations to resist seismic forces.

3.3 COMMISSIONING

A. Provide commissioning documentation in accordance with the requirements of section 23 08 00 COMMISSIONING OF HVAC SYSTEMS for all inspection, Bancroft-AE Project No. 17-112 23 05 41 - 2 03-06-2019 start up, and contractor testing required above and required by the

System Readiness Checklist provided by the Commissioning Agent.

B. Components provided under this section of the specification will be tested as part of a larger system. Refer to section 23 08 00

COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.

- - - E N D - - -

V A

N e w

Y o r k

H a r b o r

E a s t r d

S t r e e t

N w

Y o r k

N Y

R e p l a c e

C o o l i n g

T o w r

B a n c r o f t

A r c h i t e c t s

E n g i n e e s

T

S E L E C T I O N

G U I D E

F O R

V I B R A T I O N

I S O L A T O R

Q U I P M E

O

G R A D

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

Y P

I

L

M

F

F R I G E R A T I O N

M A C H I N

C

M P R E S S O R S

A N D

V A C U U M

P U M

U M

O

U P L

H

L

W

L

L

L

N e w

Y o r k

H a r b o r

E a s t r d

S t r e w

Y o r k

N Y

R e p l a c e

C o o l i n g

T o w n c r o f t

A r c h i t e c t s

E n g i n e e

U I P M E

G R A

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

R G

L I p o

U N T

L

L

L

L

O F

F A

O V E

O C C U P I E D

A R E A

P

O V

N T R I F U G A L

F A

T O

H

T O

R

R

R

R P M

O V

N e w

Y o r k

H a r b o r

E a s t r d

S t r e w

Y o r k

N Y

R e p l a c e

C o o l i n g

T o w n c r o f t

A r c h i t e c t s

E n g i n e e

U I P M E

G R A

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

O L I N G

T O W E

T O

R

R P M

O V

N e w

Y o r k

H a r b o r

E a s t r d

S t r e w

Y o r k

N Y

R e p l a c e

C o o l i n g

T o w n c r o f t

A r c h i t e c t s

E n g i n e e

U I P M E

G R A

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

F T

F L O O R

S P

O O R

M O U N T E

T H R U

H P

O V E

T O

R

R P M

O V

N e w

Y o r k

H a r b o r

E a s t r d

S t r e w

Y o r k

N Y

R e p l a c e

C o o l i n g

T o w n c r o f t

A r c h i t e c t s

E n g i n e e

T E

E d i t t h e

T a b l e a b o v e t o s u i t w h e r e i s o l a t o r o t h e r t h a n t h o s e s h o w n a r e u s e d s u c h a s f o r s e i s m i c r e s t r a i n t s a n d p o s i t i o n l i m i t s t o p

F o r s u s p e n d e d f l o o r s l i g h t e r t h a n i n c h t h i c k c o n c r e t e s e l e c t d e f l e c t i o n r e q u i r e m e n t s f r o m n e x t h i g h e r s p a n

D i r e c t b o l t f i r e p u m p s t o c o n c r e t e b a s e

P r o v i d e p a d s

D f o r d o m e s t i c w a t e r b o o s t e r p u m p p a c k a g

F o r p r o j e c t s i n s e i s m i c a r e a s u s e o n l y

S S

D S t y p e i s o l a t o r s a n d s n u b b e r

S u s p e n d e d

U s e

H i s o l a t o r s o f s a m e d e f l e c t i o n a s f l o o r m o u n t e d

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 1 03/04/2020

SECTION 23 05 93

TESTING, ADJUSTING, AND BALANCING FOR HVAC

A. Testing, adjusting, and balancing (TAB) of heating, ventilating and air conditioning (HVAC) systems. TAB includes the following:

1. Planning systematic TAB procedures.

2. Design Review Report.

3. Systems Inspection report.

4. Systems Readiness Report.

5. Balancing water distribution systems; adjustment of total system to provide design performance; and testing performance of equipment and automatic controls.

6. Vibration and sound measurements.

7. Recording and reporting results.

B. Definitions:

1. Basic TAB used in this Section: Chapter 38, "Testing, Adjusting and

Balancing" of 2011 ASHRAE Handbook, "HVAC Applications".

2. TAB: Testing, Adjusting and Balancing; the process of checking and adjusting HVAC systems to meet design objectives.

3. AABC: Associated Air Balance Council.

4. NEBB: National Environmental Balancing Bureau.

5. Hydronic Systems: Includes condenser water,

6. Flow rate tolerance: The allowable percentage variation, minus to plus, of actual flow rate from values (design) in the contract documents.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.

B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

C. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND

EQUIPMENT.

D. Section 23 07 11, HVAC, AND BOILER PLANT INSULATION:

E. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS. Equipment Insulation.

F. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 2 03/04/2020

G. Section 23 65 00, COOLING TOWERS.

1.3 QUALITY ASSURANCE

A. Refer to Articles, Quality Assurance and Submittals, in Section

23 05 11, COMMON WORK RESULTS FOR HVAC, and Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

B. Qualifications:

1. TAB Agency: The TAB agency shall be a subcontractor of the General

Contractor and shall report to and be paid by the General

Contractor.

2. The TAB agency shall be either a certified member of AABC or certified by the NEBB to perform TAB service for HVAC, water balancing and vibrations and sound testing of equipment. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the agency loses subject certification during this period, the General Contractor shall immediately notify the Resident Engineer and submit another TAB firm for approval. Any agency that has been the subject of disciplinary action by either the AABC or the NEBB within the five years preceding Contract Award shall not be eligible to perform any work related to the TAB. All work performed in this Section and in other related Sections by the TAB agency shall be considered invalid if the TAB agency loses its certification prior to Contract completion, performed by the predecessor agency.

3. TAB Specialist: The TAB specialist shall be either a member of AABC or an experienced technician of the Agency certified by NEBB. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject certification during this period, the General Contractor shall immediately notify the Resident Engineer and submit another TAB

Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC or the NEBB within the five years preceding Contract Award shall not be eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this Section and in other related Sections performed by the TAB specialist shall be considered invalid if the TAB Specialist

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 3 03/04/2020 loses its certification prior to Contract completion and must be performed by an approved successor.

4. TAB Specialist shall be identified by the General Contractor within

60 days after the notice to proceed. The TAB specialist will be coordinating, scheduling and reporting all TAB work and related activities and will provide necessary information as required by the

Resident Engineer. The responsibilities would specifically include:

a. Shall directly supervise all TAB work.

b. Shall sign the TAB reports that bear the seal of the TAB standard. The reports shall be accompanied by report forms and schematic drawings required by the TAB standard, AABC or NEBB.

c. Would follow all TAB work through its satisfactory completion.

d. Shall provide final markings of settings of all HVAC adjustment devices.

e. Permanently mark location of duct test ports.

5. All TAB technicians performing actual TAB work shall be experienced and must have done satisfactory work on a minimum of 3 projects comparable in size and complexity to this project. Qualifications must be certified by the TAB agency in writing. The lead technician shall be certified by AABC or NEBB

C. Test Equipment Criteria: The instrumentation shall meet the accuracy/calibration requirements established by AABC National

Standards or by NEBB Procedural Standards for Testing, Adjusting and

Balancing of Environmental Systems and instrument manufacturer. Provide calibration history of the instruments to be used for test and balance purpose.

D. Tab Criteria:

1. One or more of the applicable AABC, NEBB or SMACNA publications, supplemented by ASHRAE Handbook "HVAC Applications" Chapter 38, and requirements stated herein shall be the basis for planning, procedures, and reports.

2. Flow rate tolerance: Following tolerances are allowed. For tolerances not mentioned herein follow 2011 ASHRAE Handbook "HVAC

Applications", Chapter 38, as a guideline.

a. Chilled water and condenser water pumps: Minus 0 percent to plus

5 percent.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 4 03/04/2020

3. Systems shall be adjusted for energy efficient operation as described in PART 3.

4. Typical TAB procedures and results shall be demonstrated to the

Resident Engineer for one air distribution system (including all fans, three terminal units, three rooms randomly selected by the

Resident Engineer) and one hydronic system (pumps and three coils) as follows:

a. When field TAB work begins.

b. During each partial final inspection and the final inspection for the project if requested by VA.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, and SAMPLES.

B. Submit names and qualifications of TAB agency and TAB specialists within 60 days after the notice to proceed. Submit information on three recently completed projects and a list of proposed test equipment.

C. For use by the Resident Engineer staff, submit one complete set of applicable AABC or NEBB publications that will be the basis of TAB work.

D. Submit Following for Review and Approval:

1. Design Review Report within 90 days for conventional design projects after the system layout on air and water side is completed by the Contractor.

2. Systems inspection report on equipment and installation for conformance with design.

3. Systems Readiness Report.

4. Intermediate and Final TAB reports covering flow balance and adjustments, performance tests, vibration tests and sound tests.

5. Include in final reports uncorrected installation deficiencies noted during TAB and applicable explanatory comments on test results that differ from design requirements.

E. Prior to request for Final or Partial Final inspection, submit completed Test and Balance report for the area.

1.5 APPLICABLE PUBLICATIONS

A. The following publications form a part of this specification to the extent indicated by the reference thereto. In text the publications are referenced to by the acronym of the organization.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 5 03/04/2020

B. American Society of Heating, Refrigerating and Air Conditioning

Engineers, Inc. (ASHRAE):

2011 ...................HVAC Applications ASHRAE Handbook, Chapter 38, Testing, Adjusting, and Balancing and Chapter

48, Sound and Vibration Control

C. Associated Air Balance Council (AABC):

2002....................AABC National Standards for Total System

Balance

D. National Environmental Balancing Bureau (NEBB):

7th Edition 2005 ........Procedural Standards for Testing, Adjusting, Balancing of Environmental Systems

2nd Edition 2006 .......Procedural Standards for the Measurement of

Sound and Vibration

3rd Edition 2009 ........Procedural Standards for Whole Building Systems

Commissioning of New Construction

E. Sheet Metal and Air Conditioning Contractors National Association

(SMACNA):

3rd Edition 2002 ........HVAC SYSTEMS Testing, Adjusting and Balancing

PART 2 - PRODUCTS

2.1 INSULATION REPAIR MATERIAL

See Section 23 07 11, HVAC and BOILER PLANT INSULATION Provide for repair of insulation removed or damaged for TAB work.

PART 3 - EXECUTION

3.1 GENERAL

A. Refer to TAB Criteria in Article, Quality Assurance.

B. Obtain applicable contract documents and copies of approved submittals for HVAC equipment and automatic control systems.

3.2 DESIGN REVIEW REPORT

The TAB Specialist shall review the Contract Plans and specifications and advise the Resident Engineer of any design deficiencies that would prevent the HVAC systems from effectively operating in accordance with the sequence of operation specified or prevent the effective and accurate TAB of the system. The TAB Specialist shall provide a report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 6 03/04/2020

3.3 SYSTEMS INSPECTION REPORT

A. Inspect equipment and installation for conformance with design.

B. The inspection and report is to be done after air distribution equipment is on site and duct installation has begun, but well in advance of performance testing and balancing work. The purpose of the inspection is to identify and report deviations from design and ensure that systems will be ready for TAB at the appropriate time.

3.4 SYSTEM READINESS REPORT

A. Inspect each System to ensure that it is complete including installation and operation of controls. Submit report to RE in standard format and forms prepared and or approved by the Commissioning

Agent.

3.5 TAB REPORTS

A. Submit an intermediate report for 25 percent of systems and equipment tested and balanced to establish satisfactory test results.

B. The TAB contractor shall provide raw data immediately in writing to the

Resident Engineer if there is a problem in achieving intended results before submitting a formal report.

C. If over 20 percent of readings in the intermediate report fall outside the acceptable range, the TAB report shall be considered invalid and all contract TAB work shall be repeated and re-submitted for approval at no additional cost to the owner.

D. Do not proceed with the remaining systems until intermediate report is approved by the Resident Engineer.

3.6 TAB PROCEDURES

A. Tab shall be performed in accordance with the requirement of the

Standard under which TAB agency is certified by either AABC or NEBB.

B. General: During TAB all related system components shall be in full operation. Fan and pump rotation, motor loads and equipment vibration shall be checked and corrected as necessary before proceeding with TAB.

Set controls and/or block off parts of distribution systems to simulate design operation of variable volume air or water systems for test and balance work.

C. Allow 7 days time in construction schedule for TAB and submission of all reports for an organized and timely correction of deficiencies.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 7 03/04/2020

D. Water Balance and Equipment Test: Include circulating pumps, and condensers:

1. Adjust flow rates for equipment. Set coils and evaporator to values on equipment submittals, if different from values on contract drawings.

2. Primary-secondary (variable volume) systems: Coordinate TAB with

Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. Balance systems at design water flow and then verify that variable flow controls function as designed.

3. Record final measurements for hydronic equipment on performance data sheets. Include entering and leaving water temperatures for heating and cooling coils, and for convertors. Include entering and leaving air temperatures (DB/WB for cooling coils) for air handling units and reheat coils. Make air and water temperature measurements at the same time.

3.7 VIBRATION TESTING

A. Furnish instruments and perform vibration measurements as specified in

Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and

EQUIPMENT. Field vibration balancing is specified in Section 23 05 11, COMMON WORK RESULTS FOR HVAC. Provide measurements for all rotating

HVAC equipment of 1/2 horsepower and larger, including centrifugal/screw compressors, cooling towers, pumps, fans and motors.

B. Record initial measurements for each unit of equipment on test forms and submit a report to the Resident Engineer. Where vibration readings exceed the allowable tolerance Contractor shall be directed to correct the problem. The TAB agency shall verify that the corrections are done and submit a final report to the Resident Engineer.

3.8 SOUND TESTING

A. Perform and record required sound measurements in accordance with

Paragraph, QUALITY ASSURANCE in Section 23 05 41, NOISE and VIBRATION

CONTROL FOR HVAC PIPING and EQUIPMENT.

1. Take readings in rooms, approximately three percent of all rooms.

The Resident Engineer may designate the specific rooms to be tested.

2. Provide cooling tower sound measurements. Refer to Section 23 65 00, COOLING TOWERS.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 8 03/04/2020

B. Take measurements with a calibrated sound level meter and octave band analyzer of the accuracy required by AABC or NEBB.

C. Sound reference levels, formulas and coefficients shall be according to

2011 ASHRAE Handbook, "HVAC Applications", Chapter 48, SOUND AND

VIBRATION CONTROL.

D. Determine compliance with specifications as follows:

1. When sound pressure levels are specified, including the NC Criteria in Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and

EQUIPMENT:

a. Reduce the background noise as much as possible by shutting off unrelated audible equipment.

b. Measure octave band sound pressure levels with specified equipment "off."

c. Measure octave band sound pressure levels with specified equipment "on."

d. Use the DIFFERENCE in corresponding readings to determine the sound pressure due to equipment.

DIFFERENCE: 0 1 2 3 4 5 to 9 10 or More

FACTOR: 10 7 4 3 2 1 0

Sound pressure level due to equipment equals sound pressure level with equipment "on" minus FACTOR.

e. Plot octave bands of sound pressure level due to equipment for typical rooms on a graph which also shows noise criteria (NC) curves.

2. When sound power levels are specified:

a. Perform steps 1.a. thru 1.d., as above.

b. For indoor equipment: Determine room attenuating effect, i.e., difference between sound power level and sound pressure level.

Determined sound power level will be the sum of sound pressure level due to equipment plus the room attenuating effect.

c. For outdoor equipment: Use directivity factor and distance from noise source to determine distance factor, i.e., difference between sound power level and sound pressure level. Measured sound power level will be the sum of sound pressure level due to

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 9 03/04/2020 equipment plus the distance factor. Use 30 feet for sound level location.

3. Where sound pressure levels are specified in terms of dB(A), as in

Section 23 65 00, COOLING TOWERS, measure sound levels using the "A" scale of meter. Single value readings will be used instead of octave band analysis.

E. Where measured sound levels exceed specified level, the installing contractor or equipment manufacturer shall take remedial action approved by the Resident Engineer and the necessary sound tests shall be repeated.

F. Test readings for sound testing could go higher than 15 percent if determination is made by the Resident Engineer based on the recorded sound data.

3.9 MARKING OF SETTINGS

Following approval of Tab final Report, the setting of all HVAC adjustment devices including valves, splitters and dampers shall be permanently marked by the TAB Specialist so that adjustment can be restored if disturbed at any time. Style and colors used for markings shall be coordinated with the Resident Engineer.

3.10 IDENTIFICATION OF TEST PORTS

The TAB Specialist shall permanently and legibly identify the location points of duct test ports. If the ductwork has exterior insulation, the identification shall be made on the exterior side of the insulation.

All penetrations through ductwork and ductwork insulation shall be sealed to prevent air leaks and maintain integrity of vapor barrier.

3.11 PHASING

A. Phased Projects: Testing and Balancing Work to follow project with areas shall be completed per the project phasing. Upon completion of the project all areas shall have been tested and balanced per the contract documents.

B. Existing Areas: Systems that serve areas outside of the project scope shall not be adversely affected. Measure existing parameters where shown to document system capacity.

3.12 COMMISSIONING

of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS for all inspection, Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 05 93 - 10 03/04/2020 start up, and contractor testing required above and required by the

System Readiness Checklist provided by the Commissioning Agent.

B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00

COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.

- - E N D - - -

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 1 03/04/2020

SECTION 23 07 11

HVAC AND BOILER PLANT INSULATION

A. Field applied insulation for thermal efficiency and condensation control for

1. HVAC piping, and equipment.

B. Definitions

1. ASJ: All service jacket, white finish facing or jacket.

2. Air conditioned space: Space having air temperature and/or humidity controlled by mechanical equipment.

3. Cold: Equipment, piping handling media at design temperature of 60 degrees F or below.

4. Exposed: Piping, and equipment exposed to view in finished areas including mechanical and electrical equipment rooms or exposed to outdoor weather.

5. FSK: Foil-scrim-kraft facing.

6. Density: Pcf - pounds per cubic foot.

7. Runouts: Branch pipe connections up to one-inch nominal size to fan coil units or reheat coils for terminal units.

8. Thermal conductance: Heat flow rate through materials.

a. Flat surface: BTU per hour per square foot.

b. Pipe or Cylinder: BTU per hour per linear foot.

9. Thermal Conductivity (k): BTU per inch thickness, per hour, per square foot, per degree F temperature difference).

10. Vapor Retarder (Vapor Barrier): A material which retards the transmission (migration) of water vapor. Performance of the vapor retarder is rated in terms of permeance (perms). For the purpose of this specification, vapor retarders shall have a maximum published permeance of 0.1 perms and vapor barriers shall have a maximum published permeance of 0.001 perms.

11. HPS: High pressure steam (60 psig and above).

12. HPR: High pressure steam condensate return.

13. MPS: Medium pressure steam (16 psig thru 59 psig).

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 2 03/04/2020

14. MPR: Medium pressure steam condensate return.

15. LPS: Low pressure steam (15 psig and below).

16. LPR: Low pressure steam condensate gravity return.

17. PC: Pumped condensate.

18. HWH: Hot water heating supply.

19. HWHR: Hot water heating return.

20. GH: Hot glycol-water heating supply.

21. GHR: Hot glycol-water heating return.

22. FWPD: Feedwater pump discharge.

23. FWPS: Feedwater pump suction.

24. CTPD: Condensate transfer pump discharge.

25. CTPS: Condensate transfer pump suction.

26. VR: Vacuum condensate return.

27. CPD: Condensate pump discharge.

28. R: Pump recirculation.

29. FOS: Fuel oil supply.

30. FOR: Fuel oil return.

31. CW: Cold water.

32. SW: Soft water.

33. HW: Hot water.

34. CH: Chilled water supply.

35. CHR: Chilled water return.

36. GC: Chilled glycol-water supply.

37. GCR: Chilled glycol-water return.

38. RS: Refrigerant suction.

39. PVDC: Polyvinylidene chloride vapor retarder jacketing, white.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.

B. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.

D. Section 07 84 00, FIRESTOPPING.

E. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

F. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

G. Section 23 21 13, HYDRONIC PIPING.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 3 03/04/2020

1.3 QUALITY ASSURANCE

A. Refer to article QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK

RESULTS FOR HVAC.

B. Criteria:

1. Comply with NFPA 90A, particularly paragraphs 4.3.3.1 through

4.3.3.6, 4.3.10.2.6, and 5.4.6.4, parts of which are quoted as follows:

4.3.3.1 Pipe insulation and coverings, duct coverings, duct

linings, vapor retarder facings, adhesives, fasteners, tapes, and supplementary materials added to air ducts, plenums, panels, and duct silencers used in duct systems, unless otherwise provided for in 4.3.3.1.1 or 4.3.3.1.2., shall have, in the form in which they are used, a maximum flame spread index of 25 without evidence of continued progressive combustion and a maximum smoke developed index of 50 when tested in accordance with NFPA 255, Standard Method of Test of Surface Burning Characteristics of Building Materials.

4.3.3.1.1 Where these products are to be applied with adhesives, they shall be tested with such adhesives applied, or the adhesives used shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when in the final dry state. (See 4.2.4.2.)

4.3.3.1.2 The flame spread and smoke developed index requirements of 4.3.3.1.1 shall not apply to air duct weatherproof coverings where they are located entirely outside of a building, do not penetrate a wall or roof, and do not create an exposure hazard.

4.3.3.2 Closure systems for use with rigid and flexible air ducts tested in accordance with UL 181, Standard for Safety Factory- Made Air Ducts and Air Connectors, shall have been tested, listed, and used in accordance with the conditions of their listings, in accordance with one of the following:

(1) UL 181A, Standard for Safety Closure Systems for Use with Rigid Air Ducts and Air Connectors

(2) UL 181B, Standard for Safety Closure Systems for Use with Flexible Air Ducts and Air Connectors

4.3.3.3.1 In no case shall the test temperature be below 250°F.

4.3.10.2.6.1 Electrical wires and cables and optical fiber cables shall be listed as noncombustible or limited combustible and have a maximum smoke developed index of 50 or shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 5 ft or less when tested in accordance with NFPA 262, Standard Method of Test for Flame Travel and Smoke of Wires and Cables for Use in Air-Handling Spaces.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 4 03/04/2020

4.3.10.2.6.4 Optical-fiber and communication raceways shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 5 ft or less when tested in accordance with UL 2024, Standard for Safety Optical-Fiber Cable Raceway.

2. Test methods: ASTM E84, UL 723, or NFPA 255.

3. Specified k factors are at 75 degrees F mean temperature unless stated otherwise. Where optional thermal insulation material is used, select thickness to provide thermal conductance no greater than that for the specified material. For pipe, use insulation manufacturer's published heat flow tables. For domestic hot water supply and return, run out insulation and condensation control insulation, no thickness adjustment need be made.

4. All materials shall be compatible and suitable for service temperature, and shall not contribute to corrosion or otherwise attack surface to which applied in either the wet or dry state.

C. Every package or standard container of insulation or accessories delivered to the job site for use must have a manufacturer's stamp or label giving the name of the manufacturer and description of the material.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, and SAMPLES.

B. Shop Drawings:

1. All information, clearly presented, shall be included to determine compliance with drawings and specifications and ASTM, federal and military specifications.

a. Insulation materials: Specify each type used and state surface burning characteristics.

b. Insulation facings and jackets: Each type used. Make it clear that white finish will be furnished for exposed ductwork, casings and equipment.

c. Insulation accessory materials: Each type used.

d. Manufacturer's installation and fitting fabrication instructions for flexible unicellular insulation.

e. Make reference to applicable specification paragraph numbers for coordination.

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 5 03/04/2020

C. Samples:

1. Each type of insulation: Minimum size 4 inches square for board/block/ blanket; 6 inches long, full diameter for round types.

2. Each type of facing and jacket: Minimum size 4 inches square.

3. Each accessory material: Minimum 4 ounce liquid container or 4 ounce dry weight for adhesives / cement / mastic.

1.5 STORAGE AND HANDLING OF MATERIAL

Store materials in clean and dry environment, pipe covering jackets shall be clean and unmarred. Place adhesives in original containers.

Maintain ambient temperatures and conditions as required by printed instructions of manufacturers of adhesives, mastics and finishing cements.

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.

B. Federal Specifications (Fed. Spec.):

L-P-535E (2)- 99........Plastic Sheet (Sheeting): Plastic Strip; Poly

(Vinyl Chloride) and Poly (Vinyl Chloride -

Vinyl Acetate), Rigid.

C. Military Specifications (Mil. Spec.):

MIL-A-3316C (2)-90......Adhesives, Fire-Resistant, Thermal Insulation

MIL-A-24179A (1)-87.....Adhesive, Flexible Unicellular-Plastic

Thermal Insulation

MIL-C-19565C (1)-88.....Coating Compounds, Thermal Insulation, Fire-and

Water-Resistant, Vapor-Barrier

MIL-C-20079H-87.........Cloth, Glass; Tape, Textile Glass; and Thread, Glass and Wire-Reinforced Glass

D. American Society for Testing and Materials (ASTM):

A167-99(2004)...........Standard Specification for Stainless and

Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

B209-07.................Standard Specification for Aluminum and

Aluminum-Alloy Sheet and Plate

C411-05.................Standard test method for Hot-Surface

Performance of High-Temperature Thermal

Insulation

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 6 03/04/2020

C449-07.................Standard Specification for Mineral Fiber

Hydraulic-Setting Thermal Insulating and

Finishing Cement

C533-09.................Standard Specification for Calcium Silicate

Block and Pipe Thermal Insulation

C534-08.................Standard Specification for Preformed Flexible

Elastomeric Cellular Thermal Insulation in

Sheet and Tubular Form

C547-07.................Standard Specification for Mineral Fiber pipe

Insulation

C552-07.................Standard Specification for Cellular Glass

Thermal Insulation

C553-08.................Standard Specification for Mineral Fiber

Blanket Thermal Insulation for Commercial and

Industrial Applications

C585-09.................Standard Practice for Inner and Outer Diameters of Rigid Thermal Insulation for Nominal Sizes of Pipe and Tubing (NPS System) R (1998)

C612-10.................Standard Specification for Mineral Fiber Block and Board Thermal Insulation

C1126-04................Standard Specification for Faced or Unfaced

Rigid Cellular Phenolic Thermal Insulation

C1136-10................Standard Specification for Flexible, Low

Permeance Vapor Retarders for Thermal

Insulation

D1668-97a (2006)........Standard Specification for Glass Fabrics (Woven and Treated) for Roofing and Waterproofing

E84-10..................Standard Test Method for Surface Burning

Characteristics of Building

Materials

E119-09c................Standard Test Method for Fire Tests of Building

Construction and Materials

E136-09b................Standard Test Methods for Behavior of Materials in a Vertical Tube Furnace at 1380 F

E. National Fire Protection Association (NFPA):

90A-09..................Standard for the Installation of Air

Conditioning and Ventilating Systems

Replace Cooling Tower Bancroft Architects + Engineers

02-15

Contract No. VA36C24218C0016 Station Project No. 630-17-101 Bancroft-AE Project No. 17-112 23 07 11 - 7 03/04/2020

96-08...................Standards for Ventilation Control and Fire

Protection of Commercial Cooking Operations

101-09..................Life Safety Code

251-06..................Standard methods of Tests of Fire Endurance of

Building Construction Materials

255-06..................Standard Method of tests of Surface Burning

Characteristics…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .