EXHIBIT A - Past Performance Relevancy Questionnaire 36C24221R0008.docx

DOCX document 27 KB Posted

Attached to
Y1DA--36C24221R0008 is in replacement of 36C24220R0115 630-17-101 REPLACE COOLING TOWERS MANHATTAN 630-16-101 Replace Chillers Ph. II
Solicitation number
36C24221R0008
Issued by

About this file

This document contains a past performance questionnaire and details for a federal contract opportunity for replacement of cooling towers and chillers at a Department of Veterans Affairs medical center in Manhattan, New York. The opportunity is a service-disabled veteran-owned small business set-aside with an estimated value between $5-10 million. Offerors must demonstrate experience on similar projects as a prime or subcontractor within the past five years. The scope of work involves demolishing existing equipment and infrastructure and installing new cooling towers, chillers, piping, valves, electrical systems, and other components. The period of performance is 800 calendar days from notice to proceed. Responses are due on October 29, 2020 in hard copy submitted to the point of contact.

View the file

Other files

File Type Posted
36C24221R0008 0008.docx DOCX document
36C24221R0008 0007.docx DOCX document
36C24221R0008 0006.docx DOCX document
36C24221R0008 0005.docx DOCX document
NY 20210003 01-01-2021.pdf PDF
36C24221R0008 0004.docx DOCX document
Replace Cooling Towers Structural Drawings 630-17-101.pdf PDF
36C24221R0008 0003.docx DOCX document
36C24221R0008 0002.docx DOCX document
Replace Chillers Ph. II 630-16-101 Drawings Part 1.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part 2.pdf PDF
Replace Chillers Ph. II 630-16-101 Specs Part I.pdf PDF
Replace Chillers Ph. II 630-16-101 Drawings Part 2.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Specs Part 2.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 3.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 2.pdf PDF
36C24221R0008 0001.docx DOCX document
Replace Cooling Towers 630-17-101 Specs Part 1.pdf PDF
Replace Cooling Towers 630-17-101 Drawings Part 4.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24221R0008.docx DOCX document
36C24221R0008.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form 36C24221R0008.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24221R0008.docx DOCX document
EXHIBIT C - Calculation of Self-Performed Work 36C24221R0008.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1: Prepare no more than three (3) Part 1 forms:

Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed any later than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or _Subcontractor

2. Contract Number

3. Original Contract $ Value Current/Final Contract $ Value

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date:

2. Current Schedule: _____________________

3. Estimate/Final Completion Date:

4. Primary cause for Contract Modifications

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

In addition, address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.

Part 2, Additional offeror information required.

A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:

(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner)

Page 1 of Page 1 of

File details come from the government source that posted it. Updated .