View the file

Other files

File Type Posted
Industry Questions and Answers Amendment 0002.pdf PDF
Amendment 0002.pdf PDF
SOW SEED - Amendment 1.pdf PDF
MM Site Visit Sign In Sheet 10 Jan.pdf PDF
Industry Questions and Answers.pdf PDF
Amendment 0001.pdf PDF
W911S822R0022 Solicitation Final.pdf PDF
Exhibit 13 - Additional Requirements.pdf PDF
Exhibit 4 - Eng Form 4025-R.pdf PDF
Exhibit 23 - TEMPORARY ENVIRONMENTAL CONTROLS.docx DOCX document
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Exhibit 12 - Contractor AIE Long Term Badge Application.pdf PDF
Exhibit 21 - QUALITY CONTROL.docx DOCX document
Exhibit 5 - Blank Daily Inspection.pdf PDF
Attachment 7 - Pricing Proposal Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Consent Letter.docx DOCX document
Attachment 3 - SEED Statement of Work.pdf PDF
Exhibit 8 - HJB Form 225 Instructions.pdf PDF
Exhibit 1 - SEED As-Builts and DDC.pdf PDF
Exhibit 20 - GOVERNMENTAL SAFETY REQUIREMENTS.docx DOCX document
Exhibit 19 - SUSTAINABILITY REPORTING.docx DOCX document
Exhibit 10 - WAWF Checklist.pdf PDF
Exhibit 3 - Certified Payroll Instructions.pdf PDF
Exhibit 17 - PROJECT SCHEDULE.docx DOCX document
Exhibit 14 - WORK RESTRICTIONS.docx DOCX document
Exhibit 25 - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.docx DOCX document
Attachment 4 - Past Performance Questionnaire.docx DOCX document
Exhibit 16 - ADMINISTRATIVE REQUIREMENTS.docx DOCX document
Exhibit 11 - Contractor Vendor Pass Request (Up to 90 Days).pdf PDF
Exhibit 2 - SEED Equipment Specs.pdf PDF
Exhibit 22 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.docx DOCX document
Exhibit 15 - MEASUREMENT AND PAYMENT.docx DOCX document
Exhibit 24 - SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS.docx DOCX document
Exhibit 18 - SUBMITTAL PROCEDURES.docx DOCX document
Exhibit 9 - HJB Form 225.pdf PDF
Attachment 5 - Specific Relevant Contracts.docx DOCX document
Attachment 6 - Wage Determination.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUBMITTAL REGISTERCONTRACT NUMBER
(ER 415-1-10)
TITLE AND LOCATION:PROJECT NAMECONTRACTORSPECIFICATION SECTION
TYPE OF SUBMITTALCLASSIFICATIONCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT
ACTION
ACTIVITY NOTRANSMITTAL NOITEM NUMBERSPECIFICATION PARAGRAPH NUMBERDESCRIPTION OF ITEMS SUBMITTEDDATADRAWINGINSTRUCTIONSSCHEDULESSTATEMENTSREPORTSCERTIFICATIONSSAMPLESRECORDSO & M MANUALINFORMATION ONLYGOVERNMENT APPROVEDAPPROVEDREVIEWERSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYCODEDATESUBMIT TO GOVERN-MENTCODEDATEREMARKS
abcdefghIjklmnopqrstuvwxyzaa
01000-4As-Built Contract DrawingsXRE
01000-5Certificates of ComplianceXRE
01000-9Blasting PlanXSO/RE
01000-18Hurricane and Severe Storm PlanXSO/RE
01000-19(b)Letter Appointing SuperintendentXRE
01000-19(b)Power of Attorney & Copy Resol. F/Local Reps.XXRE
01000-19(b)List of SubcontractorsXRE
01000-19(b)Completed Electronic Submittal RegisterXRE
01000-19(d)(1)Daily ReportXREN/A - Received on a daily basis.
01130-4.1Environmental Protection PlanXPDRE
01130-4.2Logs - Final Summary ReportXRE
ENG FORM 4288-R, JAN 97EDITION OF MAR 95 IS OBSOLETE(PROPONENT CEM--CE)
AE=AREA ENGINEER; RE=RESIDENT ENGINEER; CO=CONSTRUCTION/OPERATIONS DIVISION; ED=ENGINEERING DIVISION; SO=SAFETY OFFICE; PD=PLANNING DIVISION
01330 -PAGE1OF5PAGES

Sheet2

SUBMITTAL REGISTERCONTRACT NUMBER
(ER 415-1-10)
TITLE AND LOCATION:CONSTRUCTION DREDGING, SAN JUAN HBR DEEPENING (PHASE I)CONTRACTORSPECIFICATION SECTION
TYPE OF SUBMITTALCLASSIFICATIONCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT
ACTION
ACTIVITY NOTRANSMITTAL NOITEM NUMBERSPECIFICATION PARAGRAPH NUMBERDESCRIPTION OF ITEMS SUBMITTEDDATADRAWINGINSTRUCTIONSSCHEDULESSTATEMENTSREPORTSCERTIFICATIONSSAMPLESRECORDSO & M MANUALINFORMATION ONLYGOVERNMENT APPROVEDAPPROVEDREVIEWERSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYCODEDATESUBMIT TO GOVERN-MENTCODEDATEREMARKS
abcdefghIjklmnopqrstuvwxyzaa
05101-2.2.2Materials ListXRE
05101-2.2.3Shipping BillXRE
05101-2.3.1Welding Procedures for Structural SteelXED
05101-2.3.2Structural Steel Welding RepairsXED
05101-2.4Tests, Inspections, and VerificationsXRE
05101-2.5.1Qualification of Welders and Welding OperatorsXRE
05101-2.5.2Application Qualification for Steel StudsXRE
05101-2.6Materials Disposition RecordsXRE
05502-3.1Shop Fabricated Metal ItemsXED
05502-3.2.1Miscellaneous Metals and Standard Metal ArticlesXRE
05502-3.2.2Shop Fabricated Metal ItemsXRE
ENG FORM 4288-R, JAN 97EDITION OF MAR 95 IS OBSOLETE(PROPONENT CEM--CE)
AE=AREA ENGINEER; RE=RESIDENT ENGINEER; CO=CONSTRUCTION/OPERATIONS DIVISION; ED=ENGINEERING DIVISION; SO=SAFETY OFFICE; PD=PLANNING DIVISION
01330 -PAGE2OF5PAGES

Sheet3

SUBMITTAL REGISTERCONTRACT NUMBER
(ER 415-1-10)
TITLE AND LOCATION:Contract NameCONTRACTORSPECIFICATION SECTION
TYPE OF SUBMITTALCLASSIFICATIONCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT
ACTION
ACTIVITY NOTRANSMITTAL NOITEM NUMBERSPECIFICATION PARAGRAPH NUMBERDESCRIPTION OF ITEMS SUBMITTEDDATADRAWINGINSTRUCTIONSSCHEDULESSTATEMENTSREPORTSCERTIFICATIONSSAMPLESRECORDSO & M MANUALINFORMATION ONLYGOVERNMENT APPROVEDAPPROVEDREVIEWERSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYCODEDATESUBMIT TO GOVERN-MENTCODEDATEREMARKS
abcdefghIjklmnopqrstuvwxyzaa
02325-3.1.6Notice of Misplaced MaterialXRE
02412-2.1.1Pile Driving EquipmentXED
02412-2.1.2Pile Driving Record FormXED
02412-2.2Cap BlocksXED
02412-2.3MaterialsXRE
02412-2.4.1Driving Record FormsXED
02412-2.4.2Driving RecordsXRE
02495-3.1.1Installation PlanXED
02495-3.1.2Survey ReportXRE
05101-2.1Detail DrawingsXED
05101-2.1.1Materials OrdersXRE
ENG FORM 4288-R, JAN 97EDITION OF MAR 95 IS OBSOLETE(PROPONENT CEM--CE)
AE=AREA ENGINEER; RE=RESIDENT ENGINEER; CO=CONSTRUCTION/OPERATIONS DIVISION; ED=ENGINEERING DIVISION; SO=SAFETY OFFICE; PD=PLANNING DIVISION
01330 -PAGE3OF5PAGES

Sheet4

SUBMITTAL REGISTERCONTRACT NUMBER
(ER 415-1-10)
TITLE AND LOCATION:CONSTRUCTION DREDGING, SAN JUAN HBR DEEPENING (PHASE I)CONTRACTORSPECIFICATION SECTION
TYPE OF SUBMITTALCLASSIFICATIONCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT
ACTION
ACTIVITY NOTRANSMITTAL NOITEM NUMBERSPECIFICATION PARAGRAPH NUMBERDESCRIPTION OF ITEMS SUBMITTEDDATADRAWINGINSTRUCTIONSSCHEDULESSTATEMENTSREPORTSCERTIFICATIONSSAMPLESRECORDSO & M MANUALINFORMATION ONLYGOVERNMENT APPROVEDAPPROVEDREVIEWERSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYCODEDATESUBMIT TO GOVERN-MENTCODEDATEREMARKS
abcdefghIjklmnopqrstuvwxyzaa
05101-2.2.2Materials ListXRE
05101-2.2.3Shipping BillXRE
05101-2.3.1Welding Procedures for Structural SteelXED
05101-2.3.2Structural Steel Welding RepairsXED
05101-2.4Tests, Inspections, and VerificationsXRE
05101-2.5.1Qualification of Welders and Welding OperatorsXRE
05101-2.5.2Application Qualification for Steel StudsXRE
05101-2.6Materials Disposition RecordsXRE
05502-3.1Shop Fabricated Metal ItemsXED
05502-3.2.1Miscellaneous Metals and Standard Metal ArticlesXRE
05502-3.2.2Shop Fabricated Metal ItemsXRE
ENG FORM 4288-R, JAN 97EDITION OF MAR 95 IS OBSOLETE(PROPONENT CEM--CE)
AE=AREA ENGINEER; RE=RESIDENT ENGINEER; CO=CONSTRUCTION/OPERATIONS DIVISION; ED=ENGINEERING DIVISION; SO=SAFETY OFFICE; PD=PLANNING DIVISION
01330 -PAGE4OF5PAGES