Exhibit 25 - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.docx
DOCX document 18 KB Posted
- Solicitation number
- W911S822R0022
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
1. CONSTRUCTION AND DEMOLITION (C&D) WASTE PLANNING AND REPORTING
1.1. The DOD Integrated (Non-Hazardous) Solid Waste Management Policy requires all facilities to meet a non-hazardous solid waste diversion goal of 60% Construction and Demolition Diversion. Create a waste management plan in accordance with section 01 74 19 of the JBLM Design Standards to meet or exceed the 60% C&D waste diversion target.
1.2. Complete and submit quarterly C&D Diversion and Disposal Reporting Form (HJB Form 229) in accordance with form instructions and paragraph "Reports" in Section 01 74 19 of the JBLM Design Standards. The form and instructions can be accessed via the links at Division 01 Section 01 57 19 of the JBLM Design Standards website (http://www.lewis-mcchord.army.mil/designstandards/index1.htm). Section 01 74 19 can also be accessed via the Design Standards website.
-- End of Section -- 01 74 19 - 1
File details come from the government source that posted it. Updated .