View the file

Other files

File Type Posted
Industry Questions and Answers Amendment 0002.pdf PDF
Amendment 0002.pdf PDF
SOW SEED - Amendment 1.pdf PDF
MM Site Visit Sign In Sheet 10 Jan.pdf PDF
Industry Questions and Answers.pdf PDF
Amendment 0001.pdf PDF
W911S822R0022 Solicitation Final.pdf PDF
Exhibit 13 - Additional Requirements.pdf PDF
Exhibit 4 - Eng Form 4025-R.pdf PDF
Exhibit 23 - TEMPORARY ENVIRONMENTAL CONTROLS.docx DOCX document
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Exhibit 12 - Contractor AIE Long Term Badge Application.pdf PDF
Exhibit 21 - QUALITY CONTROL.docx DOCX document
Exhibit 5 - Blank Daily Inspection.pdf PDF
Attachment 7 - Pricing Proposal Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Consent Letter.docx DOCX document
Attachment 3 - SEED Statement of Work.pdf PDF
Exhibit 8 - HJB Form 225 Instructions.pdf PDF
Exhibit 1 - SEED As-Builts and DDC.pdf PDF
Exhibit 20 - GOVERNMENTAL SAFETY REQUIREMENTS.docx DOCX document
Exhibit 19 - SUSTAINABILITY REPORTING.docx DOCX document
Exhibit 10 - WAWF Checklist.pdf PDF
Exhibit 3 - Certified Payroll Instructions.pdf PDF
Exhibit 17 - PROJECT SCHEDULE.docx DOCX document
Exhibit 14 - WORK RESTRICTIONS.docx DOCX document
Exhibit 25 - CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.docx DOCX document
Attachment 4 - Past Performance Questionnaire.docx DOCX document
Exhibit 16 - ADMINISTRATIVE REQUIREMENTS.docx DOCX document
Exhibit 11 - Contractor Vendor Pass Request (Up to 90 Days).pdf PDF
Exhibit 2 - SEED Equipment Specs.pdf PDF
Exhibit 6 - 4288 Submittal Register.xlsx XLSX spreadsheet
Exhibit 22 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.docx DOCX document
Exhibit 24 - SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS.docx DOCX document
Exhibit 18 - SUBMITTAL PROCEDURES.docx DOCX document
Exhibit 9 - HJB Form 225.pdf PDF
Attachment 5 - Specific Relevant Contracts.docx DOCX document
Attachment 6 - Wage Determination.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEASUREMENT AND PAYMENT

1. PAYMENT

The price for each contract line item shall constitute full compensation for furnishing all plant, labor, materials, appurtenances, and incidentals and performing all operations necessary to construct and complete the items in accordance with these specifications and the applicable drawings, including surveying performed by the Contractor. The bid schedule shall define the contract line items. Work paid under one contract line item will not be paid for under any other contract line item. No separate payment will be made for the work, services, or operations required by the Contractor, as specified in throughout the DIVISION 01, GENERAL REQUIREMENTS, to complete the project in accordance with these specifications; all costs thereof shall be considered as incidental to the work.

1.1 PAYMENT INVOICE

1.1.1 Requests for payment shall be submitted in accordance with (IAW) Federal Acquisition Regulations (FAR) Subpart 32.9 entitled “Prompt Payment,” Paragraphs 52.232-5 and 52.232-27 entitled “Payments Under Fixed-Price Construction Contracts” and “Prompt Payment for Construction Contracts, respectively, and Defense Federal Acquisition Regulations System (DFARS) Clause 252.232-7003 entitled “Electronic Submission of Payment Requests and Receiving Reports.” Requests for payments to be made by DFAS will be submitted via Wide Area Work Flow (WAWF). Requests for payments to be made by paying offices other than DFAS shall be submitted in the number of copies and to the designated billing office as indicated in the Task Order. The DPW Procurement Technician, Contract Specialist, and COR for each Task Order will be identified in each Task Order.

1.1.2 When submitting requests for payments (invoices) via WAWF (IAW DFARS 252.232-7003), the Contractor shall follow the invoicing procedures below:

1.1.2.1 Prior to submitting each invoice, the Contractor shall ensure that they have provided the following:

1.1.2.1.1 All certified payrolls for the period in which they are invoicing. The instructions for providing certified payrolls can be found in Appendix A. These documents shall be emailed to the Contract Specialist associated with each individual Task Order with a carbon copy (CC) sent to the COR.

1.1.2.1.2 All submittals required for the period of performance of the invoice have been submitted and approved by the Government.

1.1.2.1.3 SF 1413 submitted for all subcontractors to the Contract Specialist with a CC to the COR (this shall be completed before the start of any work).

1.1.2.1.4 All daily reports have been submitted to the Government QAR and the percent complete on the daily reports is equal to or more than the billing percentage. Daily reports are not to be revised due to billing percentages; the approved daily reports establish the accepted percentages for billing.

1.1.2.2 The Contractor shall email the DPW Procurement Technician a copy of the following items and CC the COR. The subject line of the email shall include the Contract #, Task Order #, and Government PM Name. Items to be sent are:

1.1.2.2.1 Contractor’s invoice.

1.1.2.2.2 Contractor’s schedule of values (SOV). SOV shall be in tabular form showing a breakdown of the major elements of work from the approved project schedule.

1.1.2.2.3 WAWF Checklist (Appendix H). Note: the WAWF checklist is for DPW internal use only and will not be returned to the Contractor.

1.1.2.2.4 AF Form 3065 Contract Progress Report (Appendix G).

1.1.2.2.5 If the invoice being submitted is a final invoice, the Contractor shall also supply a release of claims for the Task Order.

1.1.3 For approved invoice forms, input the invoice information into WAWF and send a WAWF-generated e-mail to the Task Order Contract Administrator and Inspector (Task Order COR). Failure to notify the Contract Administrator and the Inspector via the WAWF email will result in the rejection of the WAWF invoice and will require resubmission. For disapproved invoice checklists, make the necessary corrections and submit a new Progress Report and Invoice Form.

--End of Section-- 01 22 00.00 - 2