ESBD_513148_1778762903916_17 Exhibit N - Work Order Form.docx
DOCX document 331 KB Posted
- Attached to
- REGISTRATION INSERTS PRINTING SERVICES
- Solicitation number
- 608-26-96636
- Issued by
- Travis County, Austin City, Texas
About this file
This is a Work Order Form template used by the Texas Department of Motor Vehicles (TxDMV) for contractors operating under TxDMV Contract No. 608-[XX-XXXXXX]. The form serves as a document to authorize and track specific work assignments issued to contractors. The work order captures essential project information including the contractor name, work order number, required start and end dates, work location(s), and the TxDMV authorized signatory (Adale Bishop, Contract Specialist). The form is designed to document deliverables with associated descriptions, numeric priority levels, and hours required for labor work, as well as materials and parts needed for completion.
The pricing structure on the work order template includes separate line items for labor costs and materials/parts costs, each with individual quantity and amount fields that total to a work order total amount and grand total. All monetary fields default to $0.00 on this template, indicating that specific pricing will be populated when actual work orders are issued. The form includes sections for both the TxDMV authorized signatory and the contractor's authorized signatory to execute the work order, along with date fields for official authorization. Additional work order terms may be incorporated through reference to form PCL-612, with the template revised as of May 22, 2025.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Order No. [XXXXX] under TxDMV Contract No. 608-[XX-XXXXXX]
TEXAS DEPARTMENT OF MOTOR VEHICLES
WORK ORDER FORM
Contractor’s Name
| Work Order Date |
| Work Order Number |
TxDMV Contact
TxDMV Phone
| Required Start Date |
| Required End Date |
TxDMV Email
Work Location(s)
| TxDMV Authorized Signatory |
| Full Name and Title: |
Adale Bishop, Contract Specialist
| Signature: |
| Date: |
| Contractor’s Authorized Signatory |
| Full Name and Title: |
| Signature: |
| Date: |
Work Order Summary
| Deliverable(s) Description |
| Numeric Priority |
| Hours |
| Amount |
[1,2,3]
$0.00
| Labor Total |
| $0.00 |
| Material(s) and Part(s) Description |
| Quantity |
| Price Per Unit |
| Amount |
$0.00
| Material(s) and Part(s) Total |
| $0.00 |
| Work Order Total |
| Amount |
| Grand Total |
| $0.00 |
Additional Work Order Terms
PCL-612 Form Revised: 2025-05-22 Page 1 of 10
Work Order No. [XXXXX] Page 2 of 2 under TxDMV Contract No. 608-[XX-XXXXX] image1.jpeg
File details come from the government source that posted it. Updated .