ESBD_396277_1739554263410_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf

PDF 122 KB Posted

Attached to
Hush House Transformer Replacement
Solicitation number
TMD25-ANG-WJ-24150007
Issued by
Harris County, Texas

About this file

This document is a Standard Operating Procedure (SOP) from Ellington Air Force Base in Houston, Texas, specifically addressing the inadvertent discovery of unmarked burials. The SOP, dated April 20, 2022, outlines procedures for multiple stakeholders including installation leadership, base civil engineers, security police, public affairs office, and contractors. The document establishes a clear chain of command and actions to be taken when unmarked burials are discovered during ground-disturbing activities such as construction, maintenance, or field exercises. The procedure requires immediate cessation of activities upon discovery, notification of unit commanders and the Environmental Manager (CEV), and securing of the discovery site.

The SOP is governed by several federal regulations including the Native American Graves Protection and Repatriation Act, Archaeological Resources Protection Act, and National Historic Preservation Act. Key responsibilities include the Environmental Manager's duties to protect the site, ensure proper handling of remains and artifacts, notify relevant authorities (including installation commander and medical examiner), and determine if discoveries fall under NAGPRA jurisdiction. The document includes a detailed flow chart illustrating the notification and response process, emphasizing site security, protection from vandalism and weather, and coordination with state police, the Archaeological Assistance Division of NPS, SHPO, and Tribes as necessary.

View the file

Other files

File Type Posted
ESBD_396277_1739554274379_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_396277_1739554242664_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_396277_1739554019240_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_396277_1739554089469_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_396277_1739554294506_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (01OCT23).pdf PDF
ESBD_396277_1739554059288_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_396277_1739553617667_ATTACHMENT G.2 Application for Texas Identification Number #_AP_152.pdf PDF
ESBD_396277_1739554039934_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_396277_1739553555834_TMD25-ANG-WJ-24150007 Hush House Transformer Replacement.pdf PDF
ESBD_396277_1739554191020_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_396277_1739553606718_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_396277_1739553662987_ATTACHMENT G.6 Preferred ALAMO Transformer Schematic.pdf PDF
ESBD_396277_1739554160285_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_396277_1739553641492_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_396277_1739554009810_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_396277_1739554170591_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_396277_1739553654889_ATTACHMENT G.5 Photo of Hush House Transformer.pdf PDF
ESBD_396277_1739554049653_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_396277_1739554232203_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_396277_1739554211970_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_396277_1739553997116_ATTACHMENT G.7 Project Map-Hush House Map.pdf PDF
ESBD_396277_1739554129070_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_396277_1739554029863_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_396277_1739554149784_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_396277_1739554119567_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_396277_1739554079011_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_396277_1739553628289_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 5.pdf PDF
ESBD_396277_1739554068682_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_396277_1739554099531_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_396277_1739554181602_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_396277_1739554252449_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_396277_1739554109501_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_396277_1739554201717_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_396277_1739554286258_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_396277_1739554139903_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_396277_1739554222221_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.V - ELLINGTON AFB (EF), HOUSTON, TEXAS

STANDARD OPERATING PROCEDURE (SOP) FOR INADVERTENT

DISCOVERY OF UNMARKED BURIALS

20 Apr 22

Contact: Mr. Mark Garcia, Ellington Field Environmental Manager (CEV) 281-929-2013, mark.garcia.16@us.af.mil

Statutory References:

1. Native American Graves Protection and Repatriation Act

2. Archaeological Resources Protection Act

3. National Historic Preservation Act and its implementing regulations

Regulations:

1. 42 CFR 10

2. 32 CFR 229

3. 36 CFR Part 800

Applies to:

1. Installation leadership

2. Training Site Manager

3. Base Civil Engineer

4. Real Property Office

5. Security Police

6. Public Affairs Office

7. Judge Advocates Office

8. Maintenance, utilities, and grounds crews and foremen

9. Unit commanders and unit/activity personnel

10. Tenants and contractors

Typical Situations: Ground disturbance from construction involving digging, bulldozing, clearing, or grubbing, maintenance or repair activities, off-road traffic, field units on exercise, outdoor recreation, observation of eroded areas.

Typical Triggering Event: Discovery of unmarked burial(s), including Native American burials or cemeteries from which headstones were relocated but not the physical remains.

Policy: In the event that an unanticipated discovery of cultural artifacts occurs, activity in the immediate vicinity should cease until an assessment of the materials can be made.

The unit commander/supervisor should be notified immediately so the CEV can be contacted.

Procedures: This section describes specific actions to be taken for discovery of unmarked burials. The flow chart (figure 5-3) is intended to be used by unit/activity level personnel, unit commanders, and similar personnel as a decision-making guide when inadvertent discoveries of burials are made as described under the applicability section of this SOP.

mailto:mark.garcia.16@us.af.mil https://www.nps.gov/subjects/nagpra/index.htm https://www.fs.usda.gov/lei/archeological-resources-protection.php#:~:text=It%20governs%20the%20excavation%20of,archaeological%20collections%20from%20those%20sites.

https://www.achp.gov/sites/default/files/2018-06/nhpa.pdf https://www.ecfr.gov/current/title-42/chapter-I/subchapter-A/part-10 https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800#:~:text=Section%20106%20of%20the%20National,to%20comment%20on%20such%20undertakings.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Scenario I: inadvertent discovery of burials.

A. Unit commander, environmental liaison, PA, Unit/activity personnel

a. Goals: understand the procedure when burials are inadvertently discovered so that the remains can be adequately protected.

B. Tasks:

a. Cease ground-disturbing activity when possible, human remains or burials are observed or encountered.

b. Unit personnel will report any observations or discoveries of human remains or burials immediately to the unit commander or facility manager and they will in turn notify the CEV immediately. They will await instructions from

CEV.

c. Secure the discovery location(s). Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure location if needed.

d. Coordinate with CEV on where and when activities can resume and give direction to the construction superintendent.

C. Environmental Manager

a. Goals: ensure that when each discovery occurs procedures are followed that will protect and properly treat any remains that are discovered.

D. Tasks:

a. ensure the site location and materials are properly protected.

b. Provide unit commander with necessary information so burials can be protected/avoided, etc.

c. ensure that all remains, and artifacts are accounted for and properly labeled and packaged if removed from the ground.

d. notify the installation commander.

e. notify the medical examiner.

f. determine if the remains and objects are NAGPRA related and initiate appropriate consultation if necessary.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024