ESBD_396277_1739554079011_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf
PDF 52 KB Posted
- Attached to
- Hush House Transformer Replacement
- Solicitation number
- TMD25-ANG-WJ-24150007
- Issued by
- Harris County, Texas
About this file
This document is Attachment G.F.2, a Contractor Hazardous Material Identification Form Close-Out Procedures for Ellington AFB (EF). The document outlines the close-out inspection process where the contractor must accompany the Project Manager's Representative and Environmental Manager to verify that all used and unused hazardous materials (HM) have been removed from the installation. The form is designated as Part II and must be attached to Part I.
The document includes signature fields for three parties: the Contractor, Project Manager/Representative CEV, and Environmental Manager, with corresponding date fields. This appears to be a standard form used for documenting compliance with hazardous material removal requirements at project completion.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.F.2 - ELLINGTON AFB (EF) CONTRACTOR HAZARDOUS
MATERIAL IDENTIFICATION FORM CLOSE-OUT PROCEDURES
Part II
Attach this part to Part I
Contractor shall accompany the Project Manager’s Representative and the
Environmental Manager on the close-out inspection to ensure all used and unused HM has been removed from the installation.
Close-out Approval Signatures:
Contractor
Signature Date
Project Manager
/Representative CEV
(Environmental Manager)