ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf
PDF 17 KB Posted
- Solicitation number
- TMD24-ANG-WJ-24150009
- Issued by
- Harris County, Texas
About this file
The document provided is an Ellington AFB (EF) Substitutions Request Form, which is part of a state and local contract opportunity for the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing. The project involves the repair of the existing radio frequency (RF) cable at the 35 localizer located at Ellington Field, Building 1452, Houston, Texas 77034. The scope of work includes manually trenching, removing previously damaged RF heliax cable, and replacing it with 150 linear feet of new cable and conduits.
The document outlines the process for requesting substitutions to the specified items, including providing justification, certifications, and attachments. It requires the contractor to reimburse the government for any review or redesign services and coordinate the installation to ensure no additional cost to the owner. The proposed substitution must have no adverse effect on other trades, the construction schedule, or warranty requirements, and maintenance and service parts must be locally available.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.S - ELLINGTON AFB (EF)
SUBSTITUTIONS REQUEST FORM
To: Project Manager
Specified Item:
Section Page Paragraph Description
The undersigned requests consideration of the following:
Proposed Substitution: ___________________________________________________
The undersigned certifies that the following paragraphs, unless modified or clarified by attachments, are correct:
1. The proposed substitution does not affect dimensions shown on the Drawings.
2. The undersigned will reimburse the Government for review or redesign services associated with re- approval by authorities.
3. The undersigned will coordinate installation and make changes to other Work which may be re- quired for the Work to be complete with no additional cost to
Owner.
4. The proposed substitution will have no adverse effect on other trades, the construction schedule, or specified warranty requirements.
5. Maintenance and service parts will be locally available for the proposed substitution.
6. Attached data includes support items listed in Section 01600, and applicable portions of the data are clearly identified.
7. Attached data also includes a description of any revisions to the Contract
Documents which the proposed substitution will require for its proper installation.
The undersigned further certifies that the function, appearance and quality of the proposed substitution are equivalent or superior to the specified item.
Submitted by:
Signature __________________________________________________________
Firm ______________________________________________________________
Address ____________________________________________________________
Date
Telephone
List of Attachments:
File details come from the government source that posted it. Updated .