ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf

PDF 108 KB Posted

Attached to
TMD Texas Air National Guard Ellington Field Cable Repair
Solicitation number
TMD24-ANG-WJ-24150009
Issued by
Harris County, Texas

About this file

The document is an attachment titled "ATTACHMENT G.F - Ellington AFB (EF) EMS Hazardous Material Procedures" related to a state and local contract opportunity for the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing to repair radio frequency (RF) cable at Ellington Field in Houston, Texas. The attachment outlines the contractor requirements for managing hazardous materials (HM) during the project, including establishing an HM storage and distribution system, reporting all HM to the installation's Hazardous Material Pharmacy (HMMP), maintaining an HM identification form and safety data sheets, and properly disposing of all used and unused HM prior to project closeout. The contractor must comply with all federal, state, and local environmental regulations and standards.

The contract opportunity is for 150 linear feet of new RF cable and conduits at the 35 localizer located at Ellington Field Building 1452 in Houston, Texas. The project is situated within Harris County. No additional details are provided regarding the pricing terms, set asides, incumbent contractor, funding sources, or contract duration.

View the file

Other files

File Type Posted
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062692834_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_371089_1723061838423_ATTACHMENT G.1 Direct Deposit Authorization Form.pdf PDF
ESBD_371089_1723062860299_ATTACH~3.PDF PDF
ESBD_371089_1723063388690_AT2598~1.PDF PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723062521452_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_371089_1723062307951_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_371089_1723061872655_ATTACHMENT G.2 Application for Texas Identification Number.pdf PDF
ESBD_371089_1723062831590_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_371089_1723063298033_ATTACH~2.PDF PDF
ESBD_371089_1723061940566_ATTACHMENT G.4 Pricing Schedule.pdf PDF
ESBD_371089_1723062969469_ATTACH~2.PDF PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723061909201_ATTACHMENT G.3 TMD Standard Terms and Conditions.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723063157585_ATTACH~2.PDF PDF
ESBD_371089_1723062600331_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_371089_1723062025654_ATTACHMENT G.6 Four (4) Site Photos.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723062100169_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_371089_1724098412133_ESBD Addendum 2 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063353258_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_371089_1723062252989_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_371089_1723062943009_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_371089_1723061959244_ATTACHMENT G.5 Photo Overview.pdf PDF
ESBD_371089_1723062876491_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062731760_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_371089_1723063286623_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062296770_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_371089_1723061785599_TMD24-ANG-WJ-24150009 Ellington Cable Repair.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723063135331_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.F - ELLINGTON AFB (EF) EMS HAZARDOUS

MATERIAL PROCEDURES

PART 1 – GENERAL

1. SUMMARY OF WORK

A. A key element to the Pollution Prevention program at Ellington Field is the control of

Hazardous Material (HM) office. To control HM use, a Hazardous Materials

Pharmacy (HAZMART) program has been fully implemented within Ellington Field.

The HAZMART focuses on source reduction as the preferred method of pollution prevention. Control of HM includes reducing the number of types and amounts of

HM used, and controlling its proper distribution, storage, use, and disposal. The

Contractor shall comply with all Federal, state, and local Environmental Management

System (EMS) environmental standards (ISO 14001:2015, the standard that we use as a management system for all environmental actions).

B. Contractor shall establish Hazardous Material (HM) storage and distribution system when HM is to be used. Hazard materials can represent many different chemicals used in a construction project. Flammables, Corrosives, adhesives, paints, etc.

a. All HM required to support the contract shall be reported to the Hazardous

Material Pharmacy (HMP) office using the Contractor HM Identification

Form attached. The Form may be altered to improve tracking. This listing will be provided prior to work beginning and will strictly be enforced by the

Project Manager. The form shall constitute a materials submittal in the form of a quarterly report being submitted to the Base Environmental Officer throughout the course of the project.

b. Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting.

c. Additional HM needed by the Contractor shall be identified to the Project

Manager’s Representative for approval by the HMMP. (See Attachment X)

C. Contractor shall register with the installation HMMP prior to start of work using HM to support the installation’s compliance with Executive Order 12856, Federal

Compliance with Right-to-Know Laws and Pollution Prevention Requirements.

D. Contractor shall maintain a Contractor HM Identification Form for all HM on the job site for inspection/verification.

E. Project Manager will verify that the HM identified to the HMMP is the only HM in use on the job site.

F. Contractor shall provide the following to the HMMP:

a. A list of each material and quantity of material for all proposed HM.

Hazardous Material (HM) shall be construed to mean any item that is:

i. A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).

ii. Regulated in its disposal by federal Environmental Protection Agency

(EPA) under 40 CFR.

iii. Hazardous as defined by federal Texas Department of Transportation

(TXDOT) regulations under 49 CFR.

iv. Hazardous as defined by the Dangerous Goods Regulations of the

International Air Transport Association.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

b. A binder containing all Safety Data Sheets (SDS) for each item on the HM list. Safety Data Sheets are provide information on hazards of working with a chemical and procedures that should be used to ensure safety. This listing shall also be provided electronically by individual SDS for processing prior to work beginning. These SDS shall also be maintained in a Binder within the

Job Trailer or wherever the construction project is headquartered out of.

c. Examples of hazardous materials used on the job site include, but are not limited to:

i. Petroleum based liquids/gases (gasoline, kerosene, diesel, propane, butane, acetylene, etc.).

ii. Adhesives and glues.

iii. Shot charges for anchor systems.

iv. Volatile solvents (such as PVC cleaner and glues, paint thinners).

v. Non-water-based paints.

vi. Liquid sealants.

vii. Epoxies and coating systems.

viii. Acidic or alkali cleaners.

G. Contractor shall establish a construction-specific HM storage and issue location that fully complies with federal, state and local environmental regulations. Once established, the contractor is required to notify the Project Manager so that the base environmental manager can visit the site and approved the storage location and inventory control of materials.

a. Materials issued shall be tracked for quantities used.

b. Unused materials shall be inventoried and removed from Base property prior to close-out of the contract or expiration date of the HM.

c. Reports of materials delivered, used and removed from the installation shall be submitted to the Project Manager monthly and prior to contract close-out.

H. Contractor shall accompany the Project Manager and the installation Environmental

Manager (CEV) on project close-out inspection to ensure all used and unused HM has been removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the government accepting beneficial occupancy of the facility or construction item.

2. SUPPLEMENTS

A. The supplements listed below are part of this specification.

a. Attachment G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage

Data

b. Attachment G.F.2 - Ellington AFB (EF) Contractor Hazardous Material

Identification Form Close-Out Procedures.