The document is an attachment (ATTACHMENT G.D - ELLINGTON AFB (EF) FIELD ENGINEERING) to a state and local contract opportunity involving the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing at Ellington Field in Houston, Texas. The Contractor is required to provide field engineering services, including survey work, civil/structural engineering, and preservation of survey markers for the construction project. The Contractor must retain a registered surveyor to lay out the work and maintain a survey during construction. The Contractor is responsible for providing GIS data and final locations of all building corners, utilities, and other infrastructure to integrate with the 147 CES Common Installation Picture.

The state and local contract opportunity is for the repair of the existing radio frequency (RF) cable at the 35 localizer at Ellington Field. The project involves manually trenching and removing the previously damaged RF heliax cable and replacing it with 150 linear feet of new cable and conduits. The contract is being issued by the Texas Military Department (TMD) located in the state of Texas and Harris County.

View the file

Other files

File Type Posted
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062692834_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_371089_1723061838423_ATTACHMENT G.1 Direct Deposit Authorization Form.pdf PDF
ESBD_371089_1723062860299_ATTACH~3.PDF PDF
ESBD_371089_1723063388690_AT2598~1.PDF PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_371089_1723062521452_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_371089_1723061872655_ATTACHMENT G.2 Application for Texas Identification Number.pdf PDF
ESBD_371089_1723062831590_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_371089_1723063298033_ATTACH~2.PDF PDF
ESBD_371089_1723061940566_ATTACHMENT G.4 Pricing Schedule.pdf PDF
ESBD_371089_1723062969469_ATTACH~2.PDF PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723061909201_ATTACHMENT G.3 TMD Standard Terms and Conditions.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723063157585_ATTACH~2.PDF PDF
ESBD_371089_1723062600331_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_371089_1723062025654_ATTACHMENT G.6 Four (4) Site Photos.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723062100169_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_371089_1724098412133_ESBD Addendum 2 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063353258_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_371089_1723062252989_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_371089_1723062943009_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_371089_1723061959244_ATTACHMENT G.5 Photo Overview.pdf PDF
ESBD_371089_1723062876491_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062731760_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_371089_1723063286623_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062296770_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_371089_1723061785599_TMD24-ANG-WJ-24150009 Ellington Cable Repair.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723063135331_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.D - ELLINGTON AFB (EF) FIELD ENGINEERING

PART 1 – GENERAL

1. REQUIREMENTS INCLUDED

A. The Contractor shall provide and pay for field engineering services for:

a. Survey work required in execution of work.

b. Civil, structural, or other professional engineering services specified or required to execute the Contractor’s construction method.

B. The method of field staking for the construction of the work shall be at the option of the Contractor.

C. The accuracy of any method of staking shall be responsibility of the Contractor. All engineering for vertical and horizontal control shall be the responsibility of the

Contractor.

a. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are carelessly or willfully disturbed by the

Contractor, the Contractor shall not proceed with any work until he has re-established such points, marks, lines, and elevations as may be necessary for the prosecution of the work.

b. The Contractor shall retain the services of a competent surveyor, registered in the State of Texas, to lay out the work and maintain a survey during construction. The Contractor shall be solely responsible for proper location of the work.

2. SURVEY REFERENCE POINTS

A. Locate and protect control points prior to starting site work and preserve all permanent reference points during construction.

a. Make no changes or relocations without prior written notice to the Project

Manager.

b. Report to the Project Manager when any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations.

3. PROTECT SURVEY REQUIREMENTS

A. Establish temporary benchmarks as needed, referenced to data established by survey control points. Record locations with horizontal and vertical data, on Record

Drawings.

B. Establish lines and levels, and locate and lay out, by instrumentation and similar appropriate means:

a. Site improvements, including utility slopes and invert elevations.

b. Batter boards for structures.

c. From time to time, verify layouts by same methods.

4. RECORDS

A. Maintain a complete, accurate log of al control and survey work as it progresses.

B. At Contract closeout, submit a survey of installation of roadways, drainage, site grading, buried utilities, and manholes at the same scale as the Construction

Documents indicating elevations and stationing at 100-foot increments.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

5. SUBMITTALS

A. On request of the Project Manager, submit documentation to verify accuracy of field engineering work.

B. Submit Drawings showing locations of all pipes and structures constructed. This

Drawing shall be included with the Record Drawings.

6. GEOSPATIAL DATA STANDARD

A. Prepare and furnish geographical Information System (GIS) electronic map of the site and site utilities that integrates into the 147 CES Common Installation Picture (CIP) using Geographical Positioning System (GPS) Geospatial Electronic data per ANG

ETL 19-12, Geographic Information System (GIS) Data Format Specifications Dated

18 November 2019.

B. At the end of the project all data points will need to be provided by the contractor.

Provide all final locations of the corners (outline) of building, valves, manholes, handholes, light poles, fire hydrants, outline of parking lots and other items to provide a complete picture of what has been built and installed. Provide enough data to enable the government to have the location of everything on the project.