ESBD_371089_1723062876491_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf

PDF 63 KB Posted

Attached to
TMD Texas Air National Guard Ellington Field Cable Repair
Solicitation number
TMD24-ANG-WJ-24150009
Issued by
Harris County, Texas

About this file

This document is an attachment to a state and local contract opportunity from the Texas Military Department (TMD), Texas Air National Guard (ANG) 147th Attack Wing. The attachment, titled "ATTACHMENT G.M - ELLINGTON AFB (EF) MATERIAL EQUIPMENT", provides details on the transportation, handling, storage, and protection requirements for the products involved in the project.

The project requires the repair of the existing radio frequency (RF) cable at the 35 localizer located at Ellington Field, Building 1452, in Houston, Texas. The scope includes manually trenching, removing previously damaged RF heliax cable, and replacing it with 150 linear feet of new cable and conduits. The project is for the Texas Air National Guard at Ellington Field, and the contract term is not specified.

View the file

Other files

File Type Posted
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062692834_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_371089_1723061838423_ATTACHMENT G.1 Direct Deposit Authorization Form.pdf PDF
ESBD_371089_1723062860299_ATTACH~3.PDF PDF
ESBD_371089_1723063388690_AT2598~1.PDF PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_371089_1723062521452_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_371089_1723062307951_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_371089_1723061872655_ATTACHMENT G.2 Application for Texas Identification Number.pdf PDF
ESBD_371089_1723062831590_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_371089_1723063298033_ATTACH~2.PDF PDF
ESBD_371089_1723061940566_ATTACHMENT G.4 Pricing Schedule.pdf PDF
ESBD_371089_1723062969469_ATTACH~2.PDF PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723061909201_ATTACHMENT G.3 TMD Standard Terms and Conditions.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723063157585_ATTACH~2.PDF PDF
ESBD_371089_1723062600331_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_371089_1723062025654_ATTACHMENT G.6 Four (4) Site Photos.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723062100169_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_371089_1724098412133_ESBD Addendum 2 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063353258_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_371089_1723062252989_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_371089_1723062943009_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_371089_1723061959244_ATTACHMENT G.5 Photo Overview.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062731760_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_371089_1723063286623_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062296770_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_371089_1723061785599_TMD24-ANG-WJ-24150009 Ellington Cable Repair.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723063135331_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_371089_1723062848141_ATTACH~2.PDF PDF
ESBD_371089_1723062652487_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_371089_1723062537933_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_371089_1723063316199_ATTACH~3.PDF PDF
ESBD_371089_1723063367434_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_371089_1723654956338_ESBD Addendum 1 - TMD24-ANG-WJ-24150009.pdf PDF
ESBD_371089_1723063015395_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_371089_1723062377226_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_371089_1723062990834_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_371089_1723063177299_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_371089_1723062041430_ATTACHMENT G.7 Trench Details.pdf PDF
ESBD_371089_1723062454062_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.M - ELLINGTON AFB (EF) MATERIAL EQUIPMENT

PART 1 – GENERAL

1. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions, apply to this Section.

2. SUMMARY

A. This Section includes:

a. Transportation and handling

b. Storage and protection

c. Product options

d. Substitutions

3. TRANSPORTATION AND HANDLING

A. Transport and handle Products in accordance with manufacturer's instructions.

B. Promptly inspect shipments to ensure that Products comply with requirements, quantities are correct, and Products are undamaged.

C. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage.

4. STORAGE AND PROTECTION

A. Store and protect Products in accordance with manufacturers' instructions, with seals and labels intact and legible.

B. Store sensitive Products in weather tight, climate-controlled enclosures.

C. For exterior storage of fabricated Products, place on sloped supports, above ground.

D. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.

E. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation or potential degradation of Product.

F. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

G. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement, or damage.

H. Arrange storage of Products to permit access for inspection. Periodically inspect to verify Products are undamaged and are maintained in acceptable condition.

I. Payment for materials stored on site will be made only when the request is accompanied by an inventory of stored materials along with copies of the supplier invoices for the stored materials. Only actual cost of the materials stored will be compensated.

5. PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Substitutions: Submit a request for substitution for any manufacturer not named in accordance with the following article.

6. SUBSTITUTIONS

A. Project Manager will consider requests for Substitutions during the submittal phase of the project.

B. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.

C. Document each request with complete data substantiating compliance of proposed

Substitution with Contract Documents.

D. A request constitutes a representation that the Contractor:

a. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.

b. Will provide the same warranty for the Substitution as for the specified

Product.

c. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner.

d. Waives claims for additional costs or time extension which may subsequently become apparent.

E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.

F. Substitution Submittal Procedure:

a. Submit three copies of request for Substitution for consideration on

Substitution Request Form attached to this section. Limit each Substitution

Request Form to one proposed Substitution.

b. Submit shop drawings, product data, and certified test results attesting to the proposed Product equivalence.

c. The Project Manager will notify Contractor in writing of decision to accept or reject re- quest.

G. If request for substitution is not accepted by the government, Contractor is responsible for sup- plying item as originally specified or an acceptable substitution without additional cost to the Owner.