This is a NASA Research & Education Support Services Work Plan for Established Program to Stimulate Competitive Research (EPSCoR) Solicitation Support in 2019, issued to Arctic Slope Technical Services, Inc. under contract NNH16CO92B, Task Order NNH16CP46T, Work Order D-23. The document outlines support for three distinct solicitation activities: 1) Research CAN 2019 (expecting 54 proposals), 2) ISS Flight Opportunity CAN 2019 (expecting 30 proposals), and 3) Rapid Response Solicitation (expecting 15 proposals).

The work plan covers comprehensive solicitation management services from September 2018 to January 2019, including pre-solicitation support, proposal intake, compliance checking, review process support, panel meeting coordination, and selection notification. Key activities include identifying and coordinating reviewers (120 total for Research CAN, 45 for ISS Flight Opportunity, and 35 for Rapid Response), managing online peer review periods, organizing panel meetings in the Washington, DC area, and handling administrative tasks such as travel arrangements and honoraria payments for non-civil servant reviewers. The performance period is from August 15, 2018, to January 31, 2019, with the Office of Education (OE) serving as the primary NASA organizational unit.

View the file

Other files

File Type Posted
AMD 05-NRESS III SF30 80HQTR26R0002.pdf PDF
AMD 05-Attachment A-SOW.pdf PDF
NRESS III 80HQTR26R0002 Questions and Answers 1-163.xlsx XLSX spreadsheet
AMD 04-Enclosure 3-GPM Labor Hours and PDs.pdf PDF
NRESS III 80HQTR26R0002 Questions and Answers 1-164.pdf PDF
AMD 3-NRESS III SF30 80HQTR26R0002.pdf PDF
AMD 2-Enclosure 5-RTO 1.pdf PDF
AMD 2-Enclosure 6-RTO 2.pdf PDF
AMD 2-Enclosure 7-RTO 3.pdf PDF
NRESS III 80HQTR26R0002 Questions and Answers 1-56.pdf PDF
AMD 2-Exhibit 1A-1B All IDIQ Std by CY.xlsx XLSX spreadsheet
AMD 2-NRESS III RFP 80HQTR26R0002.pdf PDF
ELibrary 1-NSPIRES IT and Software Components.pdf PDF
ELibrary 4-Selection and Evaluation Statement Ex.pdf PDF
ELibrary 6-Correspondence-Declined Non-Compliant.pdf PDF
ELibrary 13-Office of Education Work Order D-22-Redacted.pdf PDF
ELibrary 15-SLPSRA Work Plan E-15-Redacted.pdf PDF
ELibrary 16-Human Research Program Work Plan H-12-Redacted.pdf PDF
ELibrary 18-Lunar Data Analysis Program Work Plan S-311-Redacted.pdf PDF
ELibrary 2-NSPIRES System Diagram.pdf PDF
ELibrary 3-Panel Review Evaluation Ex.pdf PDF
ELibrary 8-Correspondence-Courtesy Status.pdf PDF
ELibrary 9-Correspondence-Selectable.pdf PDF
ELibrary 11-Ex Step-1 Discourage Letter.pdf PDF
ELibrary 20-Space Technology Research Grant Work Plan T-23-Redacted.pdf PDF
ELibrary 5-Split-Funding Advice to Award Office Ex.pdf PDF
ELibrary 7-Correspondence-Selected Notification Letter.pdf PDF
NRESS III RFP 80HQTR26R0002.pdf PDF
Attachment A-SOW.pdf PDF
Attachment B -DL Rates_ Indirect Rates_ and Fee.pdf PDF
Attachment D-GFP.pdf PDF
Attachment F-DOL Wage Determination 2015-4281.pdf PDF
Enclosure 2-Past Performance Questionnaire.pdf PDF
Enclosure 5-RTO 1.pdf PDF
Exhibit 1A-1B All IDIQ Std by CY.pdf PDF
Attachment G-Contract Historical Data.pdf PDF
Attachment H-OCI Avoidance Plan.pdf PDF
Attachment J-OCI DRD.pdf PDF
Enclosure 1-Contract Historical Data-Incumbent.pdf PDF
Enclosure 4-QASP.pdf PDF
Exhibit 2-11 All IDIQ by CY.pdf PDF
Attachment C-Financial Management Reporting (NF 533).pdf PDF
Enclosure 8-Optional C-SCRM Questionnaire.pdf PDF
Attachment E-Contract Data Requirements List.pdf PDF
Attachment I-Information Systems Security Plan.pdf PDF
Attachment K-Security Requirements DRD.pdf PDF
Attachment L-Requirements Statements List.pdf PDF
Enclosure 3-GPM Labor Hours and PDs.pdf PDF
Enclosure 6-RTO 2.pdf PDF
Enclosure 7-RTO 3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Plan D-23, EPSCoR Solicitation Support 2019 solicitation, review and selection process. This support will include assisting with panel set-up, identifying reviewers, and the on-line review. Additional deliverables or changes to the schedule (not significantly affecting the scope and/or costs of the Work Plan) may be designated from requirements specified by the appropriate NASA point-of-contact and documented in a signed milestone chart.

Basis made for the costing

• Number of expected proposals: 54

• Panel meeting location: Washington, DC area. (For the purpose of projecting cost, it is assumed that the panel meeting will be scheduled on a date when the NRESS suite is available. Otherwise, this Work Plan will have to be modified to reflect costs associated with meeting space outside of the NRESS suite.)

• Panel meeting date: April 2019 [Specific date TBD] (2 days)

• Number of reviewers: 120 (40 civil servants, 80 non-civil servants)

• On-line peer review period: 30 days

• Number of panelists: 10 (civil servants/IPAs) [No hotels or flights required.]

• Contractor to coordinate airfare, ground transportation, per diems, lodging, and honoraria for non-civil servant panelists, where permitted by regulations

• Contractor to provide AM/PM breaks and lunch in compliance with regulations

• Changes to the schedule will be specified and documented in a subsequent milestone chart.

• Honoraria: reviewers will be based on

• Coordinate and arrange honoraria payments for the reviewers

• For the purposes of projecting cost, it is assumed that each non-civil servant reviewer will read an average of 2 proposals.

Activity 2: Established Program to Stimulate Competitive Research (EPSCoR)

ISS Flight Opportunity CAN 2019

The ASTS Team will provide support for the entire EPSCoR Flight Opportunity CAN solicitation, review and selection process. This support will include assisting with panel set-up, identifying reviewers, and the on-line review. Additional deliverables or changes to the schedule (not significantly affecting the scope and/or costs of the Work Plan) may be designated from requirements specified by the appropriate NASA point-of-contact and documented in a signed milestone chart.

Basis made for the costing

• Number of expected proposals: 30

• Panel meeting location: Washington, DC area. (For the purpose of projecting cost, it is assumed that the panel meeting will be scheduled on a date when the NRESS suite is available. Otherwise, this Work Plan will have to be modified to reflect costs associated with meeting space outside of the NRESS suite.)

• Panel meeting date: May 2019 [Specific date TBD] (1 day)

• Number of reviewers: 45 (15 civil servants, 30 non-civil servants)

• On-line peer review period: 30 days

• Number of panelists: 10 (civil servants/IPAs) [No hotels or flights required.]

• Contractor to coordinate airfare, ground transportation, per diems, lodging, and honoraria for non-civil servant panelists, where permitted by regulations

• Contractor to provide AM/PM breaks and lunch in compliance with regulations

• Changes to the schedule will be specified and documented in a subsequent

• For the purposes of projecting cost, it is assumed that each non-civil servant reviewer will read an average of 2 proposals.

Activity 3: Established Program to Stimulate Competitive Research (EPSCoR)

Rapid Response Solicitation

The ASTS Team will provide support for the entire EPSCoR Rapid Response solicitation, review and selection process. This support will include assisting with proposal receipt, compliance checking, identifying reviewers, and the on-line review.

Additional deliverables or changes to the schedule (not significantly affecting the scope and/or costs of the Work Plan) may be designated from requirements specified by the appropriate NASA point-of-contact and documented in a signed milestone chart.

Basis made for the costing

• Number of expected proposals: 15

• Number of reviewers: 35 (10 civil servants, 25 non-civil servants)

• On-line peer review period: 30 days

• Panel meeting location: Per instructions from the Government, it is assumed that no face to face panel meeting will be held. It is further assumed that the SMD and commercial project officers will facilitate the selection process.

• Panel meeting date: N/A

• Number of panelists: N/A (civil servants/IPAs)

• For the purpose of projecting costs, because the Government has indicated that there will be no face to face panel meeting the following support is NOT costed:

o Coordination of airfare, ground transportation, per diems, lodging, and honoraria for non-civil servant panelists o Coordination of AM/PM breaks and lunch

• Changes to the schedule will be specified and documented in a subsequent

• For the purposes of projecting cost, it is assumed that each non-civil servant reviewer will read an average of 2 proposals. [It is further assumed that each proposal will be read 2 times.]

Performance Schedule

Activity 1: Established Program to Stimulate Competitive Research (EPSCoR)

Research CAN 2019

Primary Deliverable:

Solicitation posting, proposal intake, compliance checking, review process support, panel meeting support, and selection/non-selection notification support

Sept. – Nov. 2018 Pre-solicitation support December 2018 Release of solicitation on NSPIRES January 2019 Notice of Intent due date February 2019 Proposal due date/Solicitation closing date March 2019 Proposal screening completion date April 2019 Panel Meeting May 2019 Selection/Notification & Procurement packages June – Sept. 2019 Post-panel Activities, Lessons Learned & Monthly status reports due

Activity 2: Established Program to Stimulate Competitive Research (EPSCoR)

ISS Flight Opportunity CAN 2019

Primary Deliverable:

Solicitation posting, proposal intake, compliance checking, review process support, panel meeting support, and selection/non-selection notification support

Aug. – Oct. 2018 Pre-solicitation support and prior year close-out November 2018 Release of solicitation on NSPIRES February 2019 Proposal due date/Solicitation closing date April 2019 Proposal screening completion date May 2019 Panel Meeting May 2019 Selection/Notification & Procurement packages June – Sept. 2019 Post-panel Activities, Lessons Learned & Monthly status reports due

Activity 3: Established Program to Stimulate Competitive Research (EPSCoR)

Rapid Response Solicitation

Primary Deliverable:

Solicitation posting, proposal intake, compliance checking, review process support, panel meeting support, and selection/non-selection notification support

Aug. - Sept. 2018 Proposal screening completion

October 2018 On-line Review November 2018 Selection/Notification & Procurement packages Dec. 2018 – Feb. 2019 Post-selection reports & Lessons Learned Mar. – June 2019 Pre-solicitation support July 2019 Release of solicitation on NSPIRES August 2019 Proposal due date September 2019 Proposal compliance screening completion date

Performance Period

The performance period for this Work Plan is August 15, 2018 to January 31, 2019.

[Note: For the purpose of estimating costs, no projections are included for support that is requested beyond January 31, 2019, which is the current performance period end date for the OE Task Plan.]

Reporting

ASTS/NRESS will provide responses to inquiries and status updates as required by NASA. The reporting requirements are for the length of the performance period of this Work Plan.

Cost reporting (NF 533) will be by activity. In addition, frequent, informal communication with the COTR and the Customer Performance Monitor will be maintained. The contractor will provide responses to inquiries and status updates as required by NASA. The reporting requirements are for the length of the performance period of this task order.

A report will be provided naming each individual traveler, stating the purpose of their travel (e.g., peer review panel meeting), and with a breakdown of estimated costs for each traveler; e.g., for airfare, per diem, etc. This report will be provided to NASA before the travel occurs and must be approved by a civil servant that will serve as the authorization necessary for “invitational travel orders.” This report can be provided by email to the Program Manager and should be approved via return email to the contractor. Updates and changes to the report will be communicated also via email to the Program Manager.

This report will be due at least three weeks before the travel is to commence.

Labor Summary

A summary of proposed labor hours by labor category and Activity number is provided in the following table. Additional labor details and all cost information are provided in the attached cost sheets.

Attachment 1

Established Program to Stimulate Competitive Research (EPSCoR) Support

D-23

A. Performance Requirements

This work order invokes the following WBS Sections:

WBS 1.0 Research Announcement and Solicitation Planning and Support

Applies – All Sections AS REQUIRED

WBS 2.0 Notice of Intent to Propose

WBS 3.0 Proposal Documents, Panel, Review, and Selection Decision Support

Applies – All Sections AS REQUIRED

WBS 4.0 Panel and Peer Review Planning, Operations, Logistics, and Close-Out

Applies – All Sections AS REQUIRED

WBS 5.0 Programmatic Documentation, Analytics, and Reporting

Applies – All Sections AS REQUIRED

WBS 6.0 Process or Systems Improvements and User Acceptance