This is Amendment 5 to a Request for Proposals (RFP) for NASA Research and Education Support Services (NRESS) III, issued by NASA/Goddard Space Flight Center. The amendment extends the proposal submission deadline to February 24, 2026, at 3:00 p.m. Eastern Time and revises key solicitation requirements including the Statement of Work (SOW) with new Information Technology (IT) and policy compliance requirements, as well as the proposal preparation instructions and page limitations. The RFP solicitation number is 80HQTR26R0002, with a contract value range from a minimum of $2,000,000 to a maximum of $365,000,000 over the five-year base performance period beginning December 1, 2026. The contract type is Cost-Plus-Fixed-Fee (CPFF) Indefinite-Delivery Indefinite-Quantity (IDIQ) with task orders, and the incumbent contractor information is referenced as Contract Historical Data. Award is expected in December 2025, with a 60-day phase-in period to commence October 1, 2026, to be performed under a separate firm-fixed-price order.

The revised RFP requires offerors to submit four proposal volumes: Offer Volume (Section L.8), Mission Suitability Volume (Section L.10, limited to 50 pages), Cost Volume (Section L.11), and Past Performance Volume (Section L.12, limited to 50 pages for information from the offeror). Key proposal components include organizational conflict of interest avoidance plans, risk identification and management approaches, task order management procedures, staffing and phase-in plans, position qualifications, total compensation plans, and IPv6 and Artificial Intelligence (AI) disclosures. Evaluation will be based on Mission Suitability (weighted at 400 points for technical approach and 400 points for management approach, plus 200 points for IT Requirements Analysis), Cost (price analysis and cost realism), and Past Performance factors, with cost being significantly less important than the combined Mission Suitability and Past Performance factors. Proposals must be submitted electronically via NASA's Enterprise File Sharing and Sync Box (EFSS Box), and offerors should notify the Contracting Officer (Chanda Cannon) at least 48 hours before submission.

View the file

Other files

File Type Posted
NRESS III 80HQTR26R0002 Questions and Answers 1-163.xlsx XLSX spreadsheet
AMD 05-Attachment A-SOW.pdf PDF
AMD 04-NRESS III SF30 80HQTR26R0002.pdf PDF
AMD 04-Enclosure 3-GPM Labor Hours and PDs.pdf PDF
NRESS III 80HQTR26R0002 Questions and Answers 1-164.pdf PDF
AMD 3-NRESS III SF30 80HQTR26R0002.pdf PDF
AMD 2-Exhibit 2-11 All IDIQ by CY.xlsx XLSX spreadsheet
NRESS III 80HQTR26R0002 Questions and Answers 1-56.pdf PDF
AMD 2-Exhibit 1A-1B All IDIQ Std by CY.xlsx XLSX spreadsheet
AMD 2-Attachment A-SOW.pdf PDF
AMD 2-Enclosure 7-RTO 3.pdf PDF
AMD 2-Enclosure 6-RTO 2.pdf PDF
AMD 2-Enclosure 5-RTO 1.pdf PDF
AMD 2-NRESS III RFP 80HQTR26R0002.pdf PDF
Amendment 01-NRESS III SF30 80HQTR26R0002.pdf PDF
ELibrary 16-Human Research Program Work Plan H-12-Redacted.pdf PDF
ELibrary 1-NSPIRES IT and Software Components.pdf PDF
ELibrary 5-Split-Funding Advice to Award Office Ex.pdf PDF
ELibrary 14-Office of Education Work Order D-23-Redacted.pdf PDF
ELibrary 18-Lunar Data Analysis Program Work Plan S-311-Redacted.pdf PDF
ELibrary 4-Selection and Evaluation Statement Ex.pdf PDF
ELibrary 15-SLPSRA Work Plan E-15-Redacted.pdf PDF
ELibrary 10-Correspondence-Declined Notification Letter.pdf PDF
ELibrary 17-Management and IT Support Work Plan M-04-Redacted.pdf PDF
ELibrary 7-Correspondence-Selected Notification Letter.pdf PDF
ELibrary 19-Discovery AO 2019 Work Plan S-346-Redacted.pdf PDF
ELibrary 12-Ex Step-1 Encourage Letter.pdf PDF
ELibrary 13-Office of Education Work Order D-22-Redacted.pdf PDF
ELibrary 6-Correspondence-Declined Non-Compliant.pdf PDF
ELibrary 11-Ex Step-1 Discourage Letter.pdf PDF
ELibrary 3-Panel Review Evaluation Ex.pdf PDF
ELibrary 2-NSPIRES System Diagram.pdf PDF
ELibrary 20-Space Technology Research Grant Work Plan T-23-Redacted.pdf PDF
ELibrary 9-Correspondence-Selectable.pdf PDF
ELibrary 8-Correspondence-Courtesy Status.pdf PDF
Attachment I-Information Systems Security Plan.pdf PDF
Attachment F-DOL Wage Determination 2015-4281.pdf PDF
Attachment B -DL Rates_ Indirect Rates_ and Fee.pdf PDF
Attachment L-Requirements Statements List.pdf PDF
Exhibit 1A-1B All IDIQ Std by CY.pdf PDF
Attachment H-OCI Avoidance Plan.pdf PDF
Attachment D-GFP.pdf PDF
Enclosure 2-Past Performance Questionnaire.pdf PDF
NRESS III RFP 80HQTR26R0002.pdf PDF
Enclosure 5-RTO 1.pdf PDF
Attachment E-Contract Data Requirements List.pdf PDF
Enclosure 3-GPM Labor Hours and PDs.pdf PDF
Enclosure 6-RTO 2.pdf PDF
Enclosure 7-RTO 3.pdf PDF
Enclosure 4-QASP.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Chanda Cannon, Contracting Officer

This amendment is issued to extend the proposal due date, and to revise RFP provision GSFC 52.215-201 and Attachment A.

See details below.

NASA/Goddard Space Flight Center Headquarters Procurement Office Greenbelt, MD 20771

NASA/Goddard Space Flight Center Headquarters Procurement Office Greenbelt, MD 20771

N/A

80HQTR26R0002

1 78

See Block 16B

12/16/2025

80HQTR26R0002

Amendment 5

Amendment 5 is issued to:

1. Extend the proposal due date to February 24, 2026, at 3:00 p.m. Eastern Time (ET).

2. Revise Attachment A – Statement of Work (SOW) to incorporate additional Information

Technology (IT) and policy compliance requirements. Revisions are identified by yellow highlighting.

3. Revise RFP provision L.7 GSFC 52.215-201 Proposal Preparation – General Instructions (b)(1)

Proposal Content and Page Limitation chart is revised as follows:

Proposal Component Volume Reference Page Limitations

Offer Volume I L.8 None

Organizational Conflict of Interest Avoidance Plan

Mission Suitability Volume II L.10 50 Pages

Cover Page, Indices, Table of Contents, SOW Compliance Matrix, Total Compensation Plan, Phase-in Plan, Position Descriptions, and List of Acronyms

Excluded

Cost Volume III L.11 Mixed

(a) Table of Contents, Direct Labor Rates, Indirect Rates, and Fee Matrices (Attachment B)

None

(b) Cost Exhibits None

(c) Basis of Estimates 40 Pages*

Past Performance Volume IV L.12 Mixed

(a) Information from the Offeror 50 Pages

(b) Cover Page, Indices, Table of Contents, List of those sent Past Performance Questionnaires, Customer Evaluations, Termination/Descope information, and List of Acronyms

Excluded

*Prime Offeror individually and each Significant Subcontractor individually.

4. Revise GSFC 52.215-203 OFFER VOLUME. (APR 2022) to add number (9) under section (c)

ADDITIONAL INFORMATION TO BE FURNISHED as follows:

(9) Pv6 and Artificial Intelligence (AI) Disclosure

80HQTR26R0002

Amendment 5

Offerors shall notify the Contracting Officer of any contract specifications that do not comply with full feature functionality for IPv6. Offerors shall also disclose any intent to propose or use AI in the performance of contract requirements.

All other terms and conditions remain unchanged.

(End of Amendment 5)

RFP 80HQTR26R0002

9 Physical Inventory of

Capital Personal Property

Reporting

Section G

NFS 1852.245-78

Within 10 Days of

Annual Physical

Inventory

Property

Administrator

10 Reporting of Inventions Section G

NFS 1852.227-72

Section I

FAR 52.227-11

Interim Reports Every

12 Months (or sooner to preserve Patent

Rights) and Final

Report within 3

Months after Contract

Completion

Electronic or Hard

Copy Format/New

Technology

Representative or

Patent

Representative

11 Safety & Health

Reporting

Section H

NFS 1852.223-70

Section H

NFS 1852.223-75

Section H

GSFC 52.223-91

Monthly/Quarterly

Reports and As

Required

NASA Mishap

Information System

(NMIS)

12 Personal Identity

Verification (PIV)

Documentation and

Reporting

Section H

GSFC 52.204-99

HQ 52.204-98

10th Day of the Month and As Required

Electronic Format and Hard Copy/COR

& Code 240 OR HQ

Security Office

13 Organizational Conflicts of Interest (OCI)

Avoidance Plan

Section I

NFS 1852.237-72

Section J

Attachment H

Submit with the proposal by the proposal due date.

Electronic

Format/CO

14 Certificate of Insurance Section I

FAR 52.228-5

FAR 52.228-7

Section I

NFS 1852.228-75

As Specified by

FAR52.228-5

FAR 52.228-7

Electronic

Format/CO

15 Subcontract Notification Section I

FAR 52.244-2

30 Days Prior to

Subcontract Award

Date

Electronic or Hard

Copy Format/CO

16 Security Requirements for

Unclassified IT Resources

a. Information System

Security Plan

b. Contractor’s IT

Security POC

c. NASA Cybersecurity and Privacy

Awareness Training

d. IT Security Role

Based Training

e. Non-Federal System

Certification

Section I

NFS 1852.240-76

Deviation 25-22, Section J

Security

Requirements for

Unclassified IT

Resources

DRD, Attachment I

a. At start of phase-in, updated as required.

b. At start of phase-in, updated as required.

c. Prior to access to

NASA information and systems

d. Initial evidence at end of phase-in, updated annually on anniversary

Electronically to CO, COR, and NASA

Security Officer

(ISSO) or NASA

Information Owner

f. Info on Employees in

Sensitive

Positions/Assignments

Report date of initial training.

e. Prior to any transfer of NASA non-public information to the contractor, submitted annually.

f. At start of phase-in, submitted annually.

17 Cyber Supply Chain Risk

Management (C-SCRM)

Plan

Section I

NFS 1852.240-76

Deviation 25-22

IT DRD, Section J

Attachment K

Prior to any transfer of

NASA non-public information to the contractor, updated as required.

As specified by

1852.240-76

(Deviation 25-22) and

Attachment K

ICT/C-SCRM

Service Element

Lead

18 Service Contract

Reporting

Section I

FAR 52.204-14

FAR 52.204-15

Annually by October

31 and Revisions, if needed, by November https://www.sam.gov

NOTE: Unless otherwise specified, “day” means “calendar day”.

(End of Clause)

B.2 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES

(COST REIMBURSEMENT). (MAR 2022)

(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $2,000,000.00. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $365,000,000.00. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.

(b) The minimum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of

Funds clause, equals or exceeds the minimum amount stated in paragraph (a).

(c) The maximum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of

Funds clause, equals the maximum amount stated in paragraph (a).

(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the

Changes clause.

(End of clause)

B.3 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST

REIMBURSEMENT). (APR 2022)

(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment B, to calculate the proposed estimated costs for all task orders issued in accordance with the “Task

Ordering Procedure” clause of this contract.

(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.

(c) The Government and Contractor agree that the fixed fee percentage specified in Attachment

B shall be used to calculate the fixed fee dollars on all task orders issued in accordance with the

“Task Ordering Procedure” clause of this contract.

B.4 GSFC 52.232-94 ESTIMATED COST INCREASES. (DEC 2005)

(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.

(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.

(c) (1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:

Incurred costs to date

Projected cost to completion

Total cost at completion

Current negotiated estimated cost

Requested increase in estimated cost

(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:

(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.

(ii) Supporting explanation for the increases and projections, sufficient for the

Government to understand the reasons for the increased estimated cost.

B.5 NFS 1852.216-74 ESTIMATED COST AND FIXED FEE. (DEC 1991)

The estimated cost of this contract is to be negotiated by task order exclusive of the fixed fee of to be negotiated by task order. The total estimated cost and fixed fee is to be negotiated by task order and not to exceed the maximum ordering value specified in clause B.2.

B.6 NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of

Funds clause, the total amount allotted by the Government to this contract is identified on each task order. This allotment is for NASA Research and Education Support

Services (NRESS) III and covers the following estimated period of performance:

Identified on each task order.

(b) An additional amount, identified on each task order, is obligated under this contract for payment of fee.

PART I – THE SCHEDULE

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK. (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the

Supplies and/or Services To Be Provided clause of this contract in accordance with the

Attachment A - Statement of Work; Attachment G - Contract Historical Data, Attachment

L - Requirements Statements List and Task Orders issued hereunder.

C.2 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA). (MAR 2022)

(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance.

Reports shall address the accomplishments and progress of all work performed under each Task

Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task

Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.

(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including recommendations and conclusions based on the experience and results obtained. The Final Task

Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task

Order.

(c) Submission. The Contractor shall submit the reports required by this clause as follows:

Copies Report Type Addressee Mail Code

1 M, F Contracting Officer (CO) 173

1 M, F Contracting Officer's Representative (COR) DA030

[M=Monthly Report, F=Final Report]

(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order

SECTION D - PACKAGING AND MARKING

D.1 SECTION D CLAUSES INCORPORATED BY REFERENCE

NFS 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION. (SEP 2005)

(End of by reference clauses)

D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT. (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA

Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard

(NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA

Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA Headquarters

300 E St SW

Washington DC 20546

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

SECTION E - INSPECTION AND ACCEPTANCE

E.1 CLAUSES INCORPORATED BY REFERENCE

FAR 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)

E.2 GSFC 52.246-92 ACCEPTANCE -- SERVICES. (APR 2022)

The Contracting Officer or authorized representative will accomplish acceptance at the NASA

Headquarters facility or as specified in individual task orders issued. For the purpose of this clause, the Contracting Officer's Representative delegated on this contract is the authorized representative. The Contracting Officer reserves the right to unilaterally designate a different

Government agent as the authorized representative. The Contractor will be notified by a written notice or by a copy of the delegation of authority if different representative is designated.

E.3 GSFC 52.246-102 INSPECTION SYSTEM RECORDS. (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

SECTION F - DELIVERIES OR PERFORMANCE

F.1 CLAUSES INCORPORATED BY REFERENCE

FAR 52.242-15 STOP-WORK ORDER. (AUG 1989) ALTERNATE I (APR 1984)

F.2 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)

The effective ordering period of this contract shall be for a period of 5 years from the contract effective date of 12/01/2026.

F.3 GSFC 52.237-92 PLACE OF PERFORMANCE - SERVICES. (NOV 2013)

The services to be performed under this contact shall be performed at the following location(s):

Contractor’s facilities. Alternate places of performance may be specified in individual task orders issued.

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 CLAUSES INCORPORATED BY REFERENCE

NFS 1852.216-75 PAYMENT OF FIXED FEE. (DEC 1988)

NFS 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND

PATENT REPRESENTATIVE. (APR 2015)

NFS 1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

NFS 1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING.

(NOV 2004)

NFS 1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED

PROPERTY. (AUG 2015)

NFS 1852.245-75 PROPERTY MANAGEMENT CHANGES. (JAN 2011)

NFS 1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY.

(AUG 2015)

G.2 NFS 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD

Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at

1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the

NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.3 NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT

TO FAR 52.245–1. (JAN 2011)

For performance of work under this contract, the Government will make available Government property identified below or in Attachment D of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245–1, Government Property, as incorporated in this contract.

The Contractor shall use this property in the performance of this contract at the Contractor’s facilities and at other location(s) as may be approved by the Contracting Officer. Under FAR

52.245–1, the Contractor is accountable for the identified property.

G.4 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS. (MAR 2022)

The following personnel are authorized to issue orders under this contract. All designated personnel are employed by the NASA Goddard Space Flight Center unless otherwise indicated:

Contracting Officer, Code 173

G.5 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING. (JUN 2014)

(a) Requirements. This clause provides the supplemental instructions referred to in NASA FAR

Supplement (NFS) clause 1852.242-73. The NFS clause and NASA Procedural Requirements

(NPR) 9501.2E, “NASA Contractor Financial Management Reporting”, establish report due dates and other financial management reporting requirements. NPR 9501.2E permits withholding of payment for noncompliance.

(b) Supplemental instructions. (1) Monthly (NF 533M) reports are required. Quarterly (NF

533Q) reports are also required. The reporting structure shall be in accordance with Attachment

C of Section J of this contract.

(2) As stated in NPR 9501.2E, NASA strongly encourages electronic contractor cost reporting.

The preferred formats are Excel and Adobe. Contact the Contracting Officer for any E-Mail addresses that are not provided or which become noncurrent.

Distribution shall be as follows:

Contracting Officer, GSFC-1730

E-Mail: Chanda.M.Cannon@nasa.gov

Contracting Officer’s Representative, GSFC-5430

E-Mail: sara.m.riall@nasa.gov

Regional Finance Office Cost Team, Code 155.2

E-Mail: GSFC-rfocateam@lists.nasa.gov

Administrative Contracting Officer (if delegated)

(c) Web site. NPR 9501.2E, “NASA Contractor Financial Management Reporting”:

http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E

G.6 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY - OFF-SITE. (APR 2016)

(a) Performance of this contract requires that Contractor personnel and any furnished and/or acquired Government property at Contractor controlled and managed premises (offsite). The requirements for control and accountability of Government property differ depending upon the location of the property. The applicability of the clauses in this contract to off-site locations is indicated below.

(b) Clauses, if included in the contract, are applicable to both onsite and offsite locations.

FAR clause 52.245-1, “Government Property”

FAR clause 52.245-9, “Use and Charges”

NASA FAR Supplement clause 1852.245-70, “Contractor Requests for Government-Provided

Property”

NASA FAR Supplement clause 1852.245-72, “Liability for Government Property Furnished for

Repair or Other Services”

NASA FAR Supplement clause 1852.245-73, “Financial Reporting of NASA Property in the

Custody of Contractors"

NASA FAR Supplement clause 1852.245-74, “Identification and Marking of Government

Equipment”

NASA FAR Supplement clause1852.245-75, “Property Management Changes”

NASA FAR Supplement clause 1852.245-78, “Physical Inventory of Capital Personal Property”

NASA FAR Supplement clause 1852.245-79, “Records and Disposition Reports for Government

Property with Potential Historic or Significant Real Value”

NASA FAR Supplement clause 1852.245-83, “Real Property Management Requirements”

GSFC clause 52.245-99, “Supplemental Financial Reporting of NASA Property in the Custody of Contractors”

(c) Clauses, if included in the contract, are applicable to offsite locations only.

NASA FAR Supplement clause 1852.245-76, “List of Government Property Furnished Pursuant to FAR 52.245-1”

G.7 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA

PROPERTY IN THE CUSTODY OF CONTRACTORS (JUN 2019)

(a) In addition to the annual 1018 reporting required under clause NFS 1852.245-73 of this contract, the Contractor shall submit monthly property financial reports as described below if, at either award or any time during contract performance, the cumulative amount of NASA property is $10 million or more.

(1) Monthly property financial reports shall be submitted including item-level supporting data for all items acquired/fabricated/modified where the total acquisition cost of the item is $500,000 or more, in the contractor’s or its subcontractors’ possession. This data shall be submitted for all items in the property classifications of real property, equipment, special test equipment, special tooling, and agency peculiar property.

(2) Monthly data shall also be submitted for items of any acquisition cost in the classifications of materials and contract work-in-process (WIP). Specifically, itemized monthly data is required for materials and WIP line items when the estimated total acquisition cost of any item at completion will be $500,000 or more.

(b) The monthly reports shall be electronically submitted using the Contractor-Held Asset

Tracking System (CHATS) at https://chats.nasa.gov using the format described in the CHATS user’s manual.

(c) Acquisition costs shall be developed using actual costs to the greatest extent possible, especially costs directly related to fabrication such as labor and materials. Supporting documentation shall be maintained and available for all amounts reported, including any amounts developed using estimating techniques.

(d) All adjustments shall be thoroughly explained and directly related to a specific Government

Fiscal Year (GFY). If the GFY cannot be determined, the default shall be the previous GFY.

(e) Work Breakdown Structures (WBS) shall be provided for all Contractor acquired property

(CAP), WIP, and any new materials acquired. The format shall be a five digit numerical level.

(i.e., 803-10). If the WBS is not identifiable, contact the NASA GSFC Property Office for further guidance, as provided in paragraph (f)(4) below.

(f)(1) The data required for the monthly submission is due the 21st day after the close of the month.

e.g., August 21 for the month ending July 31

September 21 for the month ending August 31

October 21 for the month ending September 30

(2) The monthly property financial reports required by this clause are separate from, and in addition to the annual NF 1018 reports.

(3) Both the NF 1018 report data and the September monthly report data are as of September 30.

Corrections in monthly report data shall be handled as adjustments in the next monthly report after discovery of the error. (e.g., Errors in the September monthly report shall be reported as adjustments in the October monthly report. The NF 1018 shall reflect the corrected numbers and the contractor shall provide a note regarding the corrected monthly report error under Comments in the NF 1018.) Errors in the NF1018 found after the November 30 submission shall be reported as adjustments in the NF 1018 for the next reporting year, unless immediate correction and resubmission are directed by NASA.

(4) Questions may be directed to the following individuals of the NASA GSFC Property Office:

Angela King, (301) 286-3543, email angela.c.king@nasa.gov

Timothy Kelly (301) 286-8819, email: timothy.e.kelly@nasa.gov

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES INCORPORATED BY REFERENCE

NFS 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING. (NOV 2004)

NFS 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002)

H.2 NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING. (DEC 1988)

(a) The Contracting Officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5 - Organizational Conflicts of Interest.

(b) The nature of these conflicts are that in performing this contract, there are situations where the services performed may give rise to the significant potential organizational conflicts of interest listed below.

(1) There is a concern that the successful contractor or its subcontractor(s), as part of their performance of a government contract, obtains access to another contractor’s proprietary, business confidential, or financial data and/or non-public Government information, which may provide the firm an unfair competitive advantage in a future competition. The Contractor shall protect this data/information from unauthorized use and disclosure and agrees not to use it, either directly or indirectly, in any proposals responding to a future Government solicitation.

(2) There is a concern that the successful contractor or its subcontractor(s) judgment and objectivity in performing their contract requirements may be impaired due to the fact that the substance of the contractor’s performance has the potential to affect other interests of the contractor, thereby impairing the contractor’s judgment and objectivity.

(c) The restrictions upon future contracting are as follows:

(1) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as this data remain proprietary or confidential, the Contractor and its subcontractors shall protect this data from unauthorized use and disclosure and agree not to use this data, either directly or indirectly, in any proposals responding to a future Government solicitation.

Similarly, the Contractor and its subcontractors shall protect Government non-public information from unauthorized use and disclosure and agree not to use it, either directly or indirectly, in any proposals responding to a future Government solicitation.

If the Contractor and/or its subcontractor are unable to demonstrate adequate protection to ensure that non- public data/information could not be used to improve their competitive position in a future procurement, they will be ineligible for award of the contract resulting from such procurement.

(2) If the Contractor, through the performance of this contract, is required to participate in technical reviews or provide engineering consultation services on its own proposals/quotations, products, or services (or those of its affiliate(s) or competitor(s)) provided under a different contract(s), the Contractor shall be ineligible to perform such work as a prime or subcontractor.

H.3 NFS 1852.225-70 EXPORT LICENSES. (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export

Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.

In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at NASA HQ and other NASA centers, where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.4 GSFC 52.223-92 GOVERNMENT PROPERTY - COMPLIANCE WITH SAFETY

STANDARDS. (FEB 2016)

This contract involves the use of Government-furnished property or installation provided property. If any of the property does not conform to applicable Federal, state, or local safety standards, the Contractor shall promptly notify the Contracting Officer in writing with a copy to the NASA Headquarters Safety and Occupational Health, Dept. HQ:LM032

SECTION I - CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) clauses: https://www.acquisition.gov/browse/index/far

NASA FAR Supplement (NFS) clauses:

https://www.hq.nasa.gov/office/procurement/regs/NFS.pdf.https://www.hq.nasa.gov/office/procu rement/regs/NFS.pdf.

I.2 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR

Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.

(b) The use in this solicitation or contract of any NASA FAR Supplement (48 CFR Chapter

18) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.

I.3 CLAUSES INCORPORATED BY REFERENCE

FAR 52.202-1 DEFINITIONS. (JUN 2020)

FAR 52.203-3 GRATUITIES. (APR 1984)

FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)

FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT. (JUN 2020)

FAR 52.203-7 ANTI-KICKBACK PROCEDURES. (JUN 2020)

FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR

ILLEGAL OR IMPROPER ACTIVITY. (MAY 2014)

FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY. (MAY 2014)

FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO

INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEPT 2024)

FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS. (JUN 2020)

FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT.

(NOV 2021)

FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S). (NOV 2021)

Paragraph (b)(3) insert: Inspector General Hotline Posters may be obtained from https://oig.nasa.gov/hotline.html.

FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS. (JAN 2017)

FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL. (JAN 2011)

FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS. (JUN 2020)

FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (OCT

2018)

FAR 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR

INDEFINITE-DELIVERY CONTRACTS. (OCT 2016)

FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS. (DEC 2014)

FAR 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY

EXCLUDED. (JAN 2025)

FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS. (OCT 2018)

FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS. (NOV 2015)

FAR 52.210-1 MARKET RESEARCH. (NOV 2021)

FAR 52.215-2 AUDIT AND RECORDS - NEGOTIATION. (JUN 2020)

FAR 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. (OCT

1997)

FAR 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA - MODIFICATIONS. (JUN 2020)

FAR 52.215-14 INTEGRITY OF UNIT PRICES. (NOV 2021)

FAR 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR

POSTRETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS.

(JUL 2005)

FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997)

FAR 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND

DATA OTHER THAN CERTIFIED COST OR PRICING DATA -

MODIFICATIONS. (NOV 2021)

FAR 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES. (JUN 2020)

FAR 52.216-7 ALLOWABLE COST AND PAYMENT. (AUG 2018)

Paragraph a(3) insert: 30th day

FAR 52.216-8 FIXED FEE. (JUN 2011)

FAR 52.217-8 OPTION TO EXTEND SERVICES. (NOV 1999)

Insert paragraph a: 30 days before contract expiration.

FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (JAN 2025)

FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION. (JAN 2025) ALTERNATE I (MAR 2020).

Paragraph (h)(1) insert: The contractor represents its small business size status for each one of the NAICS codes assigned to this contract.

Representation under NAICS

541611

(Yes/No) Comments h(1) Small Business Concern under

NAICS Code h(2) Small Disadvantaged Business

Concern (if answered “Is” in #1) h(3) Women-Owned Small Business h(4) WOSB Joint Venture under

WOSB Program

JV Parties & UEIs:

h(5) EDWOSB Joint Venture JV Parties & UEIs:

h(6) Veteran-Owned Small Business h(7) Service-Disabled Veteran-Owned

Small Business (if answered “Is” in #6) h(8) SDVOSB Joint Venture under

SDVOSB Program

JV Parties & UEIs:

h(9)(i) HUBZone Small Business h(9)(ii) HUBZone Joint Venture (if answered “Is” in 9(i))

HUBZone JV Parties:

FAR 52.222-2 PAYMENT FOR OVERTIME PREMIUMS. (JUL 1990)

Paragraph (a) insert: $0

FAR 52.222-3 CONVICT LABOR. (JUN 2003)

FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)

FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN

2020)

FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUN 2020)

FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT. (DEC 2010)

FAR 52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)

FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS. (OCT 2025)

FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (JAN 2025)

FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION. (MAY 2024)

FAR 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION FEB

2025)

FAR 52.224-1 PRIVACY ACT NOTIFICATION. (APR 1984)

FAR 52.224-2 PRIVACY ACT. (APR 1984)

FAR 52.224-3 PRIVACY TRAINING. (JAN 2017)

FAR 52.226-7 DRUG-FREE WORKPLACE. (MAY 2024)

FAR 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING. (MAY 2024)

FAR 52.227-1 AUTHORIZATION AND CONSENT. (JUN 2020)

FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT. (JUN 2020)

FAR 52.227-14 RIGHTS IN DATA-GENERAL. (MAY 2014)

FAR 52.227-17 RIGHTS IN DATA - SPECIAL WORKS. (DEC 2007)

FAR 52.228-7 INSURANCE - LIABILITY TO THIRD PERSONS. (MAR 1996)

FAR 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS. (APR 1984)

FAR 52.232-17 INTEREST. (MAY 2014)

FAR 52.232-22 LIMITATION OF FUNDS. (APR 1984)

FAR 52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)

FAR 52.232-25 PROMPT PAYMENT. (JAN 2017) ALTERNATE I (FEB 2002)

FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT. (OCT 2018)

FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN

2013)

FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS. (MAR 2023)

FAR 52.233-1 DISPUTES. (MAY 2014) ALTERNATE I (DEC 1991)

FAR 52.233-3 PROTEST AFTER AWARD. (AUG 1996) ALTERNATE I (JUN 1985)

FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT

2004)

FAR 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION. (APR 1984)

FAR 52.237-3 CONTINUITY OF SERVICES. (JAN 1991)

FAR 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS. (APR 1984)

FAR 52.242-3 PENALTIES FOR UNALLOWABLE COSTS. (DEC 2022)

FAR 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS. (JAN 1997)

FAR 52.242-13 BANKRUPTCY. (JUL 1995)

FAR 52.243-2 CHANGES-COST-REIMBURSEMENT. (AUG 1987) ALTERNATE I

(APR 1984)

FAR 52.244-2 SUBCONTRACTS. (JUN 2020)

Paragraph (d) insert: Professional and consultant costs as defined in FAR

31.205-33

Paragraph (j) insert: TBD

FAR 52.244-5 COMPETITION IN SUBCONTRACTING. (AUG 2024)

FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES. (DEVIATION FEB 2025)

FAR 52.245-1 GOVERNMENT PROPERTY. (SEP 2021)

FAR 52.245-9 USE AND CHARGES. (APR 2012)

FAR 52.246-25 LIMITATION OF LIABILITY - SERVICES. (FEB 1997)

FAR 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS. (JAN 2025)

FAR 52.247-69 REPORTING REQUIREMENT FOR U.S.-FLAG AIR CARRIERS

REGARDING TRAINING TO PREVENT HUMAN TRAFFICKING.

(JAN 2025)

FAR 52.249-6 TERMINATION (COST-REIMBURSEMENT). (MAY 2004)

FAR 52.249-14 EXCUSABLE DELAYS. (APR 1984)

FAR 52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)

NFS 1852.203-70 DISPLAY OF INSPECTOR GENERAL HOTLINE POSTERS. (JUN

2001)

NFS 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS. (JUL 2023)

NFS 1852.215-84 OMBUDSMAN. (NOV 2023)

NFS 1852.216-89 ASSIGNMENT AND RELEASE FORMS. (AUG 2016)

NFS 1852.223-74 DRUG- AND ALCOHOL-FREE WORKFORCE. (OCT 2023)

NFS 1852.227-11 PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR (APR

2015).

NFS 1852.227-14 RIGHTS IN DATA—GENERAL (APR 2015).

NFS 1852.228-75 MINIMUM INSURANCE COVERAGE. (OCT 1988)

NFS 1852.237-72 ACCESS TO SENSITIVE INFORMATION. (JUN 2005)

NFS 1852.237-73 RELEASE OF SENSITIVE INFORMATION. (JUN 2005)

NFS 1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION. (APR

2001)

I.4 FAR 52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $25,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $10,000,000.00;

(2) Any order for a combination of items in excess of $10,000,000.00; or

(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection

52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the

Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

I.5 FAR 52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the

Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government shall order at least the quantity of supplies or services designated in the Schedule as the minimum.

(c) Except for any limitations on quantities in the Order Limitations clause or in the

Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 1 year from the end of the effective ordering period.

I.6 FAR 52.219-17 SECTION 8(a) AWARD. (OCT 2019)

(a) By execution of a contract, the Small Business Administration (SBA) agrees to the following:

(1) To furnish the supplies or services set forth in the contract according to the specifications and the terms and conditions by subcontracting with the Offeror who has been determined an eligible concern pursuant to the provisions of section 8(a) of the Small Business

Act, as amended (15 U.S.C. 637(a)).

(2) Except for novation agreements, delegates to the NASA GSFC Headquarters

Procurement Office the responsibility for administering the contract with complete authority to take any action on behalf of the Government under the terms and conditions of the contract;

provided, however that the contracting agency shall give advance notice to the SBA before it issues a final notice terminating the right of the subcontractor to proceed with further performance, either in whole or in part, under the contract.

(3) That payments to be made under the contract will be made directly to the subcontractor by the contracting activity.

(4) To notify the NASA GSFC Headquarters Procurement Office Contracting

Officer immediately upon notification by the subcontractor that the owner or owners upon whom

8(a) eligibility was based plan to relinquish ownership or control of the concern.

(5) That the subcontractor awarded a subcontract hereunder shall have the right of appeal from decisions of the cognizant Contracting Officer under the “Disputes” clause of the subcontract.

(b) The offeror/subcontractor agrees and acknowledges that it will, for and on behalf of the

SBA, fulfill and perform all of the requirements of the contract.

I.7 FAR 52.219-18 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a)

PARTICIPANTS. (OCT 2022)

(a) Offers are solicited only from—

(1) Small business concerns expressly certified by the Small Business Administration

(SBA) for participation in SBA's 8(a) program and which meet the following criteria at the time of submission of offer—

(i) The Offeror is in conformance with the 8(a) support limitation set forth in its approved business plan; and

(ii) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by SBA;

(2) A joint venture, in which at least one of the 8(a) program participants that is a party to the joint venture complies with the criteria set forth in paragraph (a)(1) of this clause, that complies with 13 CFR 124.513(c); or

(3) A joint venture—

(i) That is comprised of a mentor and an 8(a) protégé with an approved mentor-protégé agreement under the 8(a) program;

(ii) In which at least one of the 8(a) program participants that is a party to the joint venture complies with the criteria set forth in paragraph (a)(1) of this clause; and

(iii) That complies with 13 CFR…