ECIS_Draft_Quality_Assurance_Surveillance_Plan_20210304.pdf
PDF 320 KB Posted
- Attached to
- Engineering Contractor Instructor Services (ECIS) - Pre-Solicitation Notice Federal contract opportunity
- Solicitation number
- N6134021R0048
About this file
This document provides a Quality Assurance Surveillance Plan (QASP) for an Engineering Contractor Instructor Services contract to be awarded by the Naval Air Systems Command. The QASP defines performance metrics for instructor services and data deliverables. Key performance standards include maintaining a student pass rate of at least 95% and achieving 100% of scheduled instructor hours. The contractor must also meet standards for timely responses, curriculum updates, and backup support execution. Surveillance methods include inspection of performance data, customer feedback, and annual Contractor Performance Assessment Reporting System reports. The contracting officer's representative will evaluate the contractor quarterly on quality, schedule, management, and other areas to determine incentives for future option year awards. The QASP establishes quality assurance roles and responsibilities for government personnel and performance surveillance methods to ensure contract standards are met.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_2_Norfolk_VA_20210517.pdf | ||
| Appendix_6 _ZTF_San_Diego_CA_20210517.pdf | ||
| Att1_N6134021R0048_Pre-solicitation_Ntc.pdf | ||
| ECIS_Draft_PWS_20210517.pdf | ||
| Appendix_1_San_Diego_CA_20210517.pdf | ||
| Appendix_4_Pearl_Harbor_HI_20210517.pdf | ||
| A002 - ECIS CONFERENCE MEETING MIN.pdf | ||
| A004 - ECIS MOB CPSR.pdf | ||
| A005 - ECIS CPSR.pdf | ||
| A009 - INSTRUCTOR SCHEDULE REPORT.pdf | ||
| Appendix_3_Great_Lakes_IL_20210517.pdf | ||
| Appendix_7_New_London_CT_20210517.pdf | ||
| A001 - ECIS CFSR.pdf | ||
| A008 - TESTING AND EVALUATION REPORT.pdf | ||
| Appendix_5_Newport_RI_20210517.pdf | ||
| A003 - ECIS INVENTORY.pdf | ||
| A006 - ECIS QSP.pdf | ||
| A007 - ECIS OPSEC.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT TBD ECIS QASP
12 February 21
Attachment (TBD)
N61340-21-R-0048
Quality Assurance Surveillance Plan (QASP)
Engineering Contractor Instructor Services (ECIS) Contract
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the standards included in this contract and in subsequent Option Years. The objective of the QASP is to ensure adequate quality controls and appropriate surveillance methods are in place to ensure the
Contractor, and that performance is in accordance with the requirements of the contract.
This QASP is intended to accomplish the following:
Define the roles and responsibilities of the Government officials responsible for implementation of the QASP.
Provide the Contracting Officer’s Representative (COR) with a guide to systematically and effectively assure performance of the Contractor.
Outline the corrective procedures to be taken against the Contractor for unacceptable or deficient performance.
2. Authority
Authority for issuance of this QASP is provided under Section E – Inspection and Acceptance of the contract. The Government quality assurance surveillance of the training services is to be executed by the
Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the QASP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract and follow-on options. The QASP, on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s efforts assuring those efforts are timely, effective and are delivering the results specified in the contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting
Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is located at
NAWCTSD. The ACO will be designated in the contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the contract. The limitations of authority are contained in a written letter of appointment.
Attachment (TBD)
N61340-21-R-0048
5. Responsibilities
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms and conditions of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the
Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
The Contracting Officer is responsible for:
Contractor compliance with all requirements of the contract, contract administration, cost and property control.
Reviewing the COR assessment of the Contractor’s performance.
Administrative actions arising from unresolved differences between the COR and the Contractor.
Decisions that produce an increase or decrease in the scope of the contract or contract payment.
Evaluating the performance of the COR in monitoring PWS execution.
COR – The COR is responsible for technical administration of the contract and assures proper
Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the
Contractor deems may affect contract price, terms or conditions shall be referred to the Contracting
Officer for action.
The COR is responsible for:
Verifying that the Contractor performs the technical requirements of the contract in accordance with the contract terms and conditions and PWS.
Reviewing, commenting, and reporting on the Contractor’s progress and ensuring the Contractor complies with reporting requirements.
Notifying the Contractor of discrepancies observed during surveillance and notifying the
Contracting Officer concerning performance of services provided by the contractor.
Maintaining contract records (including all Contract Data Requirements List (CDRL) submissions) delivered for their respective site(s).
Maintaining clear and effective lines of communication with the Contractor that comply (where applicable) with the requirements of the PWS.
Tracking invoice totals against contract ceiling to ensure contract ceiling is not exceeded.
Reviewing Contractor invoices and ensuring the proper labor categories and hours are charged and appear consistent with performance and are reasonable for the work performed.
Monitoring the contract for violations or deviations and keeping track of funds available and expended.
Ensuring the contract does not become a vehicle for personal services.
Coordinating site entry for Contractor personnel (if required) and ensuring that site specific check-in and check-out procedures are adhered to.
The QA monitoring forms (refer to Enclosures (1) and (2)) used to document the inspection and evaluation of the contractor’s work performance.
In addition to the above guidance, the following restrictions apply to the COR:
The COR cannot award or sign any contract or contract modification.
Attachment (TBD)
N61340-21-R-0048
The COR cannot obligate payment of monies.
The COR cannot change schedules (other than the daily training schedule), funds, or scope of the contract.
The COR cannot make any contractual agreements, commitments, or modifications involving price, quantity, quality, or delivery schedule.
The COR is not authorized or expected to offer advice to the Contractor or to Contractor personnel on how the work should be performed.
6. Methods of QA Surveillance
a. Observation/Inspection: The COR will monitor work accomplished and output in by using random sampling, observations, reviews, and inspections and will document the findings on a Quality Assurance
Monitoring Form (Enclosure 1). If a discrepancy is observed, the Quality Assurance Specialist will complete a Discrepancy Work Order (DWO) and forward it to the COR.
b. Customer Feedback: Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. The customer will communicate complaints to the COR as opposed to the contractor. The COR will accept the customer complaints and will investigate using the Quality Assurance Monitoring Form – Customer
Complaint Investigation identified in Enclosure (2).
c. Contractor Performance Assessment Report System (CPARS): The COR will conduct visits weekly during the reporting period to discuss any technical issues that may be prevalent with the
Contractor site manager. The COR will note these discussions and include a narrative assessment of overall Contractor performance and customer satisfaction annually in the CPARS. As this information may affect future source selections throughout DoD, the annual Government entry into CPARS will be used appropriately as a complementary performance oversight and communication tool with the QASP.
d. QASP: The method of surveillance detailed in the Contract Instructor Services Performance Metrics
(Enclosure 3) and the Data Performance Standards (Enclosure 4) shall be used by the COR in the technical administration of this QASP. In addition to the below instruction, the form to be used for documentation of the QA surveillance is the Surveillance Activity Checklist provided as Enclosure (5) herein.
7. Surveillance
Enclosures (1) and (2) provide a format for the COR to document inspection and evaluation of the
Contractor’s work performance. Enclosures (3) and (4) set forth the contract instructor services performance and data standards and surveillance methods for the Contractor and COR while Enclosure
(5) identifies the incentives to the Contractor. Enclosure (6) provides definitions of the evaluation areas and ratings that are used in CPARS. Enclosure (7) provides the checklist and means for the COR to document the results of the surveillance. The COR will evaluate, on a quarterly basis, the Contractor’s performance in meeting the identified contractor instructor services and data performance standards
(Enclosures (3) and (4)) utilizing their existing CPARS evaluation format and checklist. The culmination of these quarterly evaluations will result in the required annual CPARS reports. The Contractor’s reported performance on CPARS will be evaluated, as described in Enclosure (5), in the event the
Government determines to award an additional option year. Before awarding an option, the Government will review the Contractor’s CPARS to determine whether the Contractor’s performance met or exceeded the Government’s expectation for quality performance, unless another circumstance justifies an extended contractual relationship. Even if the Contracting Officer determines that awarding the option is
Attachment (TBD)
N61340-21-R-0048 advantageous to the Government after considering price, past performance, and other factors, the
Government is still free to decline award of another option year. Thus, the Contracting Officer is not required to consider these factors in declining to award an option. The factors are only relevant if the
Contracting Officer is awarding the option.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete
QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the Surveillance Activity
Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
At the end of each month, the COR will prepare a written report for the Activities Requirements
Originator (ARO) summarizing the overall results of the quality assurance monitoring of the contractor’s performance. This written report which consists of the contractor’s submitted monthly report and the completed Quality Assurance Monitoring Forms (Enclosure 1) will become part of the QA documentation. The ARO may require the contractor’s project manager, or a designated alternate, to meet with the ARO, COR, and other Government personnel as deemed necessary to discuss performance evaluation.
9. Enclosures:
(1) Quality Assurance Monitoring Form
(2) Quality Assurance Monitoring Form- Customer Complaint Investigation
(3) Contract Instructor Services Performance Metrics
(4) Data Performance Standards
(5) Incentives
(6) Definitions for Evaluation Areas/Ratings
(7) Surveillance Activity Checklist
(8) Annual Surveillance
Enclosure 1
Attachment (TBD)
QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD: ___________________
SURVEILLANCE METHOD (Check): _____ Random Sampling
_____ 100% Inspection
_____ Periodic Inspection
_____ Customer Complaint
LEVEL OF SURVEILLANCE SELECTED (Check):
_____ Monthly
_____ Quarterly
_____ As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
OBSERVED SERVICE PROVIDER PERFORMANCE MEASUREMENT RATE = ______%
SERVICE PROVIDER’S PERFORMANCE (Check): ____ Meets Standards
____ Does Not Meet Standards
NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD:
PREPARED BY: __________________________________ DATE: _____________________
ENCLOSURE (1)
Enclosure 2
N61340-21-R-0048
QUALITY ASSURANCE MONITORING FORM –
CUSTOMER COMPLAINT INVESTIGATION
SERVICE or STANDARD:
SURVEY PERIOD: ___________________
DATE/TIME COMPLAINT RECEIVED: _____________ ________ AM / PM
SOURCE OF COMPLAINT: _______________________________ (NAME)
_______________________________ (ORGANIZATION)
_______________________________ (PHONE NUMBER)
_______________________________ (EMAIL ADDRESS)
NATURE OF COMPLAINT:
RESULTS OF COMPLAINT INVESTIGATION:
DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT: _________________ AM / PM
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:
RECEIVED AND VALIDATED BY:
PREPARED BY: __________________________________ DATE: _____________________
ENCLOSURE (2)
Enclosure 3
N61340-21-R-0048
CONTRACT INSTRUCTOR SERVICES
PERFORMANCE METRICS
PWS Task
Description
Performance Standard and Acceptable
Quality Level (AQL) Surveillance Method/Measure Incentives
Student Pass
Rate
The Contractor shall achieve a student pass rate of not less than 95% on each individual teacher and course.
100% Inspection by COR and customer feedback.
See enclosure
5.
Scheduled
Instructor
Hours
The Contractor shall achieve 100% of scheduled instructor hours per period of performance.
100% Inspection by COR
Management
Response
The Contractor shall provide timely responses to routine Government requests as described within the PWS and Appendices. The
Contractor shall provide timely responses to general Government requests for information or action within the timeframes requested.
100% Inspection by COR See enclosure
5.
Backup
Support
Execution
The Contractor shall achieve 100% of its backup support plan 100% Inspection by COR
See enclosure
5.
Great Lakes
Curriculum
Updates
The Contractor shall achieve 100% of the requested curriculum updates within the 3 business days from delivery to the Contractor.
100% Inspection by COR
Enclosure 3
ENCLOSURE (3)
Enclosure 4
DATA PERFORMANCE STANDARDS
Description Standard AQL Surveillance
Measure Incentives
Operational Security
(OPSEC) Plan
Submission is accurate and in accordance with the DID cited in the
CDRL.
95% acceptable on first submission to Government
100% acceptable on subsequent submission to
Government
100%
Inspection by
COR
See Enclosure 5
Conference Minutes
Submission is accurate and in accordance with the DID cited in the
CDRL.
95% acceptable on first submission to Government
100% acceptable on subsequent submission to
Government
100%
Mobilization CI
Contractor
Performance
Summary Report
Submission is accurate and in accordance with the DID cited in the
CDRL.
95% acceptable on first submission to Government
100% acceptable on subsequent submission to
Government
100%
Contractor
Performance
Summary Report
(CPSR)
Submission is accurate and in accordance with
100% acceptable on
Contractor Funding
Status Report
(CFSR)
Submission is accurate and in accordance with the DID cited in the
CDRL.
95% acceptable on first submission to Government
100% acceptable on subsequent submission to
Government
100%
Quality System Plan
Submission is accurate and in accordance with
100% acceptable on
Inventory Report
Submission is accurate and in accordance with
100% acceptable on subsequent submission to
Government
100%
Enclosure 4
N61340-21-R-0048
Testing and
Evaluation Report
Submission is accurate and in accordance with
100% acceptable on
Enclosure (4)
Enclosure 5
INCENTIVES
The following incentives shall apply to performance under this contract.
Assessment Period
Acceptable
Performance
Definition
How Measured Incentives
Base Period
06 Feb 2022 – 05 Jan 2023:
All measurement areas rated “Satisfactory.” See
Enclosure 4.
Endpoint of the assessment period ( 12th month) evaluation using CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for award of future option periods.*
(-) Does not meet the acceptable performance definition as a condition for award of future option periods.*
Option Year 1
06 Jan 2023 – 05 Jan 2024:
period (24th month) evaluation using the CPARS format covering the previous 12 months.
Option Year 2
06 Jan 2024 – 05 Jan 2025:
period (36th month) evaluation
Option Year 3
06 Jan 2025 – 05 Jan 2026:
period (48nd month) evaluation
Option Year 4
06 Jan 2026 – 05 Jan 2027:
period (60th month) evaluation for award of future option periods.*
* The Government reserves the right to not award additional options even if all regulatory requirements are met and the Contractor meets the acceptable performance definition.
ENCLOSURE (5)
Enclosure 6
N61340-21-R-0048
DEFINITIONS FOR EVALUATION AREAS/RATINGS
All PWS/CDRL tasks, including PWS/CDRL sub-tasks, will be assessed focusing on the following.
Quality of Product or Service – Assess the Contractor’s effort to provide value-added products and/or services in meeting the performance work statement (PWS) requirements and transform operational needs and requirements into an integrated solution. This shall include activities to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program value conditions.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the
Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of schedule disruptions, discuss causes, and assess the effectiveness of Contractor corrective actions.
Management –Discuss the extent to which the Contractor discharges its responsibility for coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit.
The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the Contractor’s actions appear or were ineffective.
ENCLOSURE (6)
Enclosure 7
N61340-21-R-0048
SURVEILLANCE ACTIVITY CHECKLIST
The COR will perform a quarterly assessment of Quality, Schedule, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure 6.
Quarterly Summary of Ratings:
Quality Schedule
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Management Other Areas
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Enclosure (7)
Description Surveillance
Method/Measure
Date
Planned
Date
Completed Quality Schedule Mgmt. Other
Success of Services
100% Inspection by COR of student pass rate and customer feedback.
TBD
Scheduled Instructor Hours 100% Inspection by COR
Operational Security (OPSEC) Plan
Contractor Performance Summary Report
(CPSR)
100% Inspection
Training Report
Quality Control (QC) Plan
Monthly Convening Report
Curriculum Recommendations Report
Testing and Evaluation Report
Instructor Schedule Report
Enclosure 8
N61340-21-R-0048
ANNUAL SURVEILLANCE
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure 4 and the monthly summary of ratings. This annual assessment will occur at the endpoint of each period and cover the previous 12 months.
Description Surveillance
Method/
Measure
Date Planned Date
Completed
Summary
Rating/Results
Quality of Product or
Service
Review of Quarterly
Ratings.
Schedule
Management
Other Areas
Enclosure (8)