A006 - ECIS QSP.pdf
PDF 258 KB Posted
- Attached to
- Engineering Contractor Instructor Services (ECIS) - Pre-Solicitation Notice Federal contract opportunity
- Solicitation number
- N6134021R0048
About this file
This document contains a Contract Data Requirements List (CDRL) and associated annex for a Quality System Plan (QSP) deliverable. The Navy seeks a QSP and site-specific Quality Control Plans (QCP) from the contractor awarded the Engineering Contractor Instructor Services (ECIS) contract. Draft plans are due within two weeks and one month of mobilization, with final plans due the last Friday of the first month of contract performance. Revisions will follow the same timeline. The Navy will review drafts within 15 days and finals within 10 days. The QCPs must cover inspection systems, frequencies, responsible individuals, and methods for identifying, preventing, and correcting deficiencies. Files of inspections and corrective actions must be retained and made available. The QSP and QCPs must be submitted electronically in Microsoft Office 2016 or later format to several Contracting Officer Representatives at multiple Navy sites.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_5_Newport_RI_20210517.pdf | ||
| A003 - ECIS INVENTORY.pdf | ||
| A007 - ECIS OPSEC.pdf | ||
| ECIS_Draft_Quality_Assurance_Surveillance_Plan_20210304.pdf | ||
| Appendix_2_Norfolk_VA_20210517.pdf | ||
| Appendix_6 _ZTF_San_Diego_CA_20210517.pdf | ||
| Appendix_3_Great_Lakes_IL_20210517.pdf | ||
| Appendix_7_New_London_CT_20210517.pdf | ||
| A001 - ECIS CFSR.pdf | ||
| A008 - TESTING AND EVALUATION REPORT.pdf | ||
| Att1_N6134021R0048_Pre-solicitation_Ntc.pdf | ||
| ECIS_Draft_PWS_20210517.pdf | ||
| Appendix_1_San_Diego_CA_20210517.pdf | ||
| Appendix_4_Pearl_Harbor_HI_20210517.pdf | ||
| A002 - ECIS CONFERENCE MEETING MIN.pdf | ||
| A004 - ECIS MOB CPSR.pdf | ||
| A005 - ECIS CPSR.pdf | ||
| A009 - INSTRUCTOR SCHEDULE REPORT.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP _____ TM ___ OTHER SUSTAINMENT DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
ECIS N61340-21-R0048
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 QUALITY SYSTEM PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-81379 SEE BLK 16 NAWCTSD
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final
SEE BLK 16 Reg Repro
16. REMARKS: NAWCTSD PJM 1 1
1. BLK4: ALL DID PARAGRAPHS APPLY.
2. SEE ANNEX A006 FOR SAMPLE REPORT CONTENTS. ALL ANNEX PARAGRAPHS
APPLY.
3. BLK 5: SEE PWS ADDENDUM B PARAGRAPH 3.21
4. BLK 10/12/13: A DRAFT QUALITY SYSTEMS PLAN (QSP) AT THE PROGRAM LEVEL
SHALL BE SUBMITTED TO EACH SITE COR AND THE NAWCTSD CIS MANAGER WITHIN
TWO (2) WEEKS AFTER COMMENCMENT OF MOBILIZATION. A DRAFT QUALITY
CONTROL PLAN (QCP) TAILORED FOR EACH SITE SHALL BE SUBMITTED TO EACH SITE
COR AND THE NAWCTSD CIS MANAGER WITHIN ONE (1) CALENDAR MONTH AFTER
COMMENCEMENT OF MOBILIZATION. A FINAL QSP AND SITE TAILORED QCP SHALL BE
SUBMITTED TO THE COR FOR SIGNATURE THE LAST FRIDAY OF THE FIRST (1ST)
MONTH OF CSD. DISTRIBUTION COPIES VIA EMAIL SHALL BE DUE WITHIN THREE (3)
DAYS AFTER RECEIPT OF COR SIGNATURE. REVISIONS BY THE CONTRACTOR TO
ANY QSP OR QCP WILL USE THE SAME DISTRIBUTION AND TIMEFRAME FOR A DRAFT
FOR REVIEW AND FOR FINAL REVISION REVIEW AND ACCEPTANCE.
5. THE GOVERNMENT WILL HAVE FIFTEEN (15) WORKING DAYS FOR REVIEW AND
COMMENT OF EACH DRAFT SUBMISSION AND TEN (10) WORKING DAYS FOR REVIEW
AND ACCEPTANCE/REJECTION OF EACH FINAL SUBMISSION. NO RESPONSE WILL
INDICATE ACCEPTANCE.
6. BLK 14: THE QCP FOR COR ADRESSEES SHALL BE DISTRIBUTED TO ONLY THE
RESPECTIVE COR’S SITE.
7. BLK 14: SUBMISSIONS SHALL BE AN EMAIL ATTACHMENT IN MICROSOFT® OFFICE
2016 (OR LATER) COMPATIBLE FORMAT AND SHALL INCLUDE IN THE SUBJECT LINE:
CONTRACT/TASK ORDER NUMBER, CDRL DATA ITEM NUMBER, LOCATON, AND DATE
(E.G.; N6134020F00XX-A006-ORLANDO-14JAN2020). EMAIL ADDRESSES ARE
PROVIDED IN THE CONTRACT SCHEDULE AND/OR THE CDRL ADDRESSEE LIST
(ATTACHMENT 3 OF THE CONTRACT).
8. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION B: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT
AGENCIES ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 14 JANUARY
2020. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO
THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER TRAINING
SYSTEMS DIVISION, IN-SERVICE SUPPORT DIVISION, 12211 SCIENCE DRIVE,
ORLANDO, FL 32826-3224.
NAWCTSD PCO 1 1
NAWCTSD Sustainment 1 1
COR Great Lakes 1
COR Newport 1
COR Norfolk 1
COR Pearl Harbor 1
COR San Diego 1
COR ZTF, San Diego 1
COR SLC, New London 1
15. TOTAL ▬▬▬▬► 3 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
R. Smith, NAWCTSD Sustainment
02/10/2021 C. Caudill NAWCTSD PJM
04/22/2021
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1
ANNEX TO EXHIBIT A006
QUALITY SYSTEM PLAN
ECIS CDRL REQUIREMENT
1.0 Report Contents.
1.1 Header Information. Data elements to be provided as header information are as follows, in the order shown:
a. Contract. Enter appropriate contract number.
b. Option Year. Enter appropriate Option Year.
c. Contractor. Enter name of contractor's firm.
d. Period of Performance. Enter the start and completion dates for the contract/task order period the plan will cover. Use a
MMDDYY numerical format for each date.
1.2 Report Body.
1.2.1 General. This document establishes the basis for the Contractor’s Quality Control System. The Contractor shall establish an ISO 9000 compliant Quality Control Program (QCP). The Contractor shall produce a program level QCP that is then tailored for each site and each site’s tailored program is considered a deliverable. The Contractor shall show an inspection system covering all services required by the contract. The QCP shall specify the areas to be inspected, the frequency of the inspections, and must indicate the titles of individuals performing the inspections. The Contractor shall describe the methods for correcting deficiencies and shall specify the methods for identifying and preventing deficiencies in the quality of service performed. The Contractor shall maintain files containing all inspections conducted and make these files available to the Government for review. The Contractor shall provide copies of any such files to the Government upon request by the Contracting Officer or Contracting Officer’s Representative (COR).
1.2.2 Format. Contractor format is acceptable.
1.2.2.1 Hard Copy. Each QCP shall be prepared as delineated in the Contract.
1.2.2.2 Magnetic Media. The QCP shall be placed on Compact Disc Recordable/Re-Writable (CD-R/CD-RW;
1x-4x drive capable media) optical disc. Magnetic files shall be compatible to Microsoft Office 2010 formats as specified in block 16 of the
CDRL.
1.2.2.3 E-Mail. Each QCP shall be attached files to E-Mail that are compatible to Microsoft® Office 2010 formats as specified in block 16 of the CDRL.
2.0 QCP Content. The QCP shall consist of the following areas:
2.1 Quality Control (QC) Services. The QCP shall cover all services required by the Contract.
2.2 Inspected areas. The QCP shall specify the area(s) to be inspected on a scheduled and unscheduled basis.
2.3 Frequency of Inspections. The QCP shall specify the frequency of each inspection.
2.4 Titles and Names of Inspectors. The QCP shall identify the title and names of individuals performing the inspection.
2.5 Identifying and Preventing Deficiencies. The QCP shall indicate the methods for identifying and preventing deficiencies in the quality of services performed prior to it becoming unacceptable.
2.6 Correcting Deficiencies. The QCP shall indicate the methods used for correcting deficiencies in the Quality of service prior to it being acceptable.
2.7 Retaining Files. The Contractor shall indicate how they are retaining the files containing all inspections conducted and corrective actions taken. The files shall be made available to the Government during the term of the contract.
2.8 QC Relational Matrix. The Contractor shall create a relational matrix that indicates the general relationship between the
Contractor’s quality system procedures / processes and ISO 9000. The matrix, or an attachment thereto, shall also identify schedules for quality activities and tasks which must be coordinated and compatible with other schedules prepared for work under the contract, as well as include the name(s) of the person(s) responsible for accomplishment of activities and tasks.
2.9 Quality System Effectiveness. The plan shall identify the means by which the Contractor will ensure quality system effectiveness and demonstrate comprehensive management and review of data, such that the results may be used to indicate trends and progress in quality of all required services, test and acceptance as appropriate to the task order. The plan shall describe what is measured, how often it is tracked, and who reviews and assures that appropriate action is initiated when trends are unfavorable.
2.10 Updates. All updates shall consist of notes or changes to the plan, clearly identified as to where applicable (i.e. system element, page/paragraph, number etc.). A revision document shall be created incorporating such updates not less than once, within the first week of the last month of performance in each option period greater than six months.
2.11 Attachments. A copy of the Contractor’s quality manual which describes the current quality system shall be attached.
File details come from the government source that posted it. Updated .