E003_R1_AD2___ELECTRICAL_SITE_PLAN.pdf
PDF 3 MB Posted
- Solicitation number
- PE-55462-NONST-2025-000000010
- Issued by
- Wilcox County, Georgia
About this file
This is an electrical site plan drawing (E003) for the Rossville Middle School Athletic Field and Concessions project in Walker County Schools, Georgia. The drawing shows a detailed layout of electrical components and infrastructure for a baseball/softball field complex that includes dugouts, bleachers, bathrooms, and a concessions building with a finished floor elevation of 778.60. The plan indicates various electrical elements including lighting (designated as LBB with numerical indicators), storm sewer locations marked "NO DUMPING," underground electrical lines (UGE), and multiple distribution points (DP) and fixture locations (FD).
The drawing includes a keynote schedule for the site in the upper right corner, though the specific details are not clearly legible in this version. The scale of the drawing is 1" = 30'-0" and includes a standard grid system for reference. The overall layout shows integration with existing facilities including a football field labeled "PANTHERS" and demonstrates the comprehensive electrical infrastructure planning for the athletic complex development.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R D
N O
D U M
P
IN
G
S T O R M
S E W
E R
N O D U M
PI
NG
S TO
RM S
E W
ER
NO
DU
MPING
STOR
M SEW
ER
NO DUMPING
STORM SEWER
H
H
HH
H
H
H
D
D
'C
L F
'C
L F
'C
L F
'C
L F
'C
L F
'C
L F
'C
L F
'C
L F
'C
L F
6'CLF
6'CLF
'C
L F
'C
L F
'C
L F
D U
G O
U T
DUGOUT
B
L E
A C
H E
R S
BLEACHERS
TABLE
BATHROOM
CONCESSIONS
BUILDING
F.F.E. 778.60
MIDDLE SCHOOL
BASEBALL/SOFTBALL
FIELD
300' LINES - 340' CENTER
I
I
PD PD
PD
PD
PD
P D
P D
P D
P D
P D
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
F D
FD
SD
S D
SD
SD
SD
w p/ gf i
UGE
UGE
UGE
UGE
G R D
G R D
G R D
G R D w p/gfi w p/gfi
J wp/gfi
LBB- 21
LBB- 23
LBB
S2
S4
S1
FUTURE
CONTACTOR
CABINET
LBB- 25
S5
S7
S5
S3
S15
S15
S15
S6 S8S8
S9
S3
S3
LBB- 37,39,41
LBB- 43
S10
SCALE: = 1'-0"
DRAWING NUMBER
REVISIONS
COPYRIGHT 2024 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
12-17-2024
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
0 8 168
1/8"
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
ROSSVILLE MIDDLE SCHOOL
NEW FIELD AND CONCESSIONS FOR:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
316 BULLDOG TRAIL, ROSSVILLE, GA 30741
746-0206
01-920-041
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
E003
ELECTRICAL SITE PLAN
KEYNOTE SCHEDULE - SITE
# KEYNOTE DESCRIPTION
S1 FURNISH AND INSTALL DUPLEX WEATHERPROOF GFI RECEPTACLE AND FUSED
DISCONNECT SWITCH ATTACHED TO SCOREBOARD SUPPORT COLUMN. INSTALL
WP/GFI RECEPTACLE 18" AFF AND DISCONNECT SWITCH 48" AFF. COORDINATE EXACT
POWER REQUIREMENTS OF SCOREBOARD WITH SHOP DRAWINGS PRIOR TO
INSTALLATION OF ANY CONDUIT OR CONDUCTORS. ALL RACEWAY INSTALLTED ABOVE
GRADE SHALL BE GRS CONDUIT PAINTED TO MATCH SCOREBOARD STRUCTURE.
REFER TO PANELBOARD SCHEUDLES FOR CONDUIT AND CONDCUTOR SIZES.
S2 PAD MOUNTED TRANSFORMER AND METER FURNISHED BY UTILITY CO. COORDINATE
EXACT LOCATION AND SERVICE ENTRANCE INSTALLATION REQUIREMENTS WITH
UTILITY PRIOR TO BID. ROUTE (1) 1-1/2 " EMPTY CONDUIT FROM TRANSFORMER TO
THE METER.
S3 CONTRACTOR SHALL DIG WITH EXTEME CAUTION IN THIS AREA. THERE ARE EXISTING
UNDERGROUND ELECTRIC POWER CONDUCTORS AND COMMUNICATIONS CABLING IN
THIS AREA. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE
TO CABLING WHILE DIGGING IN THIS AREA.
S4 MAIN SERVICE GROUNDING ELECTRODE ASSEMBLY. REFER TO RISER DIAGRAM, MAIN
GROUNDING SCHEMATIC AND SECTION 26 05 26.
S5 RECEPTACLE INSTALLED ON SCORE TABLE STRUCTURE. FURNISH AND INSTALL 3/4"
CONDUIT FROM OUTLET BOX AT SCORER'S TABLE TO PANEL LBB. CONDUIT SHALL BE
GRS ABOVE GRADE AND SCH 40 PVC UNDERGROUND.
S6 FURNISH AND INSTALL 3/4"C FROM OUTLET BOX LOCATED AT SCORER'S TABLE LEG
BELOW GRADE TO SCOREBOARD. CONDUIT SHALL BE GRS ABOVE GRADE AND SCH 40
PVC UNDERGROUND. LEAVE CONDUIT WITH PULL STRING.
S7 SINGLE GANG CAST WEATHERPROOF OUTLET BOX WITH CAST WEATHERPROOF
WHILE-IN-USE COVER 24" AFF FOR CONNECTION TO SCOREBOARD CONTROLS.
S8 PROVIDE AND INSTALL (3)2.5" CONDUITS FROM FUTURE LIGHTING CONTACTOR
CABINET LOCATION IN CONCESSIONS BUILDING TO PULLBOXES SHOWN ON PLANS
FOR FUTURE FIELD LIGHTING CONDUCTORS. TURN CONDUITS UP IN ELEC ROOM 18"
AFF AND SECURE TO WALL WITH UNISTRUT AND PIPE CLAMPS. LABEL CONDUITS AS
"FUTURE FIELD LIGHTING POLES PATHWAYS".
S9 PROVIDE (2) 2.5" CONDUITS BELOW GRADE FROM PULL BOX TO PULL BOX FOR FUTURE
FIELD LIGHTING WIRING.
S10 NEMA 3R FUSED DISCONNECT SWITCH AND SERVICE RECEPTACLE INSTALLED ON
STRUT STAND INSTALLED IN CONCRETE BASE. REFER TO SEWAGE LIFT STATION
INSTALLATION DETAIL.
S15 PROVIDE A 24Wx36Lx36D PRECAST POLYMER CONCRETE OPEN BOTTOM PULL BOX
WITH BOLT ON COVER (QUAZITE MODEL PG2436BA36 (BOX) & PG2436HC00 (COVER) OR
PRIOR APPROVED EQUAL) WHERE SHOWN ON PLANS. COVER SHALL HAVE LOGO
INDICATING SERVICES WITHIN THE PULL BOX (IE: ELECTRIC, COMMUNICATION). EACH
PULL BOX SHALL INCLUDE THE FOLLOWING OPTIONS: SELF ALIGNING NUT, (1) LONG
COVER HOOK.
1" = 30'-0"E003
1 ELECTRICAL SITE PLAN
# Doc # Date
1 AD2 1/15/25
erik
FRANK - SIGNED
| Sheets |
| E003 - ELECTRICAL SITE PLAN |
File details come from the government source that posted it. Updated .