This is a grading plan drawing (C104) for the Rossville Middle School Athletic Field and Concessions project in Walker County, Georgia. The drawing shows detailed site grading plans for a new athletic field complex that includes a baseball field, dugouts, bleachers, and a bathroom/concessions building with a finished floor elevation of 778.60. The plan indicates construction limits, existing and proposed contours, drainage slopes, and spot elevations throughout the site.

The drawing contains detailed grading notes specifying requirements for contractors, including topsoil management, erosion control measures, drainage specifications, and finish elevation requirements. Key features include a detention pond with specific top of dam elevation at 774.00 and top of spillway at 772.50, various storm sewer structures with specified invert elevations, and a dry enhanced swale. The drawing is at a scale of 1" = 30' and includes standard construction symbols and legends for curb and gutter, contours, spot elevations, and construction limits. The document was issued for construction on December 17, 2024, with Addendum 1 dated January 10, 2025.

View the file

Other files

File Type Posted
C106_R1_AD1.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
ADDENDUM_3_Complete.pdf PDF
ADDENDUM_1_complete.pdf PDF
E101_R1_AD2___CONCESSIONS___DUGOUT_BUILDINGS_.pdf PDF
U502_R1_AD1.pdf PDF
Bid Tabulation and Scoring Form.pdf PDF
Notice of Advertisement RMS Combo Field.docx DOCX document
A501_R1_AD1.pdf PDF
Contract Affidavit A.pdf PDF
C502_R1_AD1.pdf PDF
Bid Bond General Contractor.doc DOC document
C207_R1_AD1.pdf PDF
GC Compensation Proposal Form.doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Payment Bond GC.doc DOC document
Addendum 04_Complete.pdf PDF
U101_R1_AD1.pdf PDF
U101_R2_AD2.pdf PDF
Consent to Release Info (01_2014_GKM).doc DOC document
E002_R1_AD2___LIGHTING_FIXTURE___MECHANICAL_E.pdf PDF
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
C505_R1_AD1.pdf PDF
ADDENDUM_2_complete.pdf PDF
RFP for General Contractor.docx DOCX document
Standard Form Fixed Price Contract.pdf PDF
C102_R1_AD1.pdf PDF
U502_R2_AD2.pdf PDF
Immigration and Security Form revised.pdf PDF
Performance Bond GC.doc DOC document
C105_R1_AD1.pdf PDF
C107_R1_AD1.pdf PDF
E001_R1_AD2___ELECTRICAL_LEGENDS.pdf PDF
E003_R1_AD2___ELECTRICAL_SITE_PLAN.pdf PDF
GC Compensation Proposal Form.doc DOC document
Consent to Release Info (01_2014_GKM).doc DOC document
Performance Bond GC.doc DOC document
Payment Bond GC.doc DOC document
RFP for General Contractor.docx DOCX document
Notice of Advertisement RMS Combo Field.docx DOCX document
Immigration and Security Form revised.pdf PDF
Standard Form Fixed Price Contract.pdf PDF
Bid Bond General Contractor.doc DOC document
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Contract Affidavit A.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

L.L.

L.L.

L.L.

L.L.

DO

BL

D

FF

E:

.6

GATE

TREELINE

BLOCK

WALL

BLEACHERS

FOUL

POST

H e

H H

H

H

H

H

H

L.L.

L.L.

L.L.

L.L.

SD

SD

NO

D

UM

PI

NG

S

TO

RM

S

EW

ER

SD

SD

SD

NO DUMPING

STORM SEWER

NO DUMPING

STORM SEWER

SD

NO DUMPING

STORM SEWER

SD

SD

SD

SD

SD

SD

NO DUMPING

STORM SEWER

6'CLF

6'CLF

6'CLF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'C

LF

6'CLF

6'CLF

6'CLF

6'C

LF

6'C

LF

6'

CL

F

6' C

LF

6'

C

LF

6'C

LF

6'C

LF

D U

G O

U T

DUGOUT

BL

EA

C H

ER

S

BLEACHERS

TABLE

BATHROOM

CONCESSIONS

BUILDING

F.F.E. 778.60

S

S

S

S

SS

S

S

S

S S

S S

S

S

S

S

S

S

S

S S

S

S

S S S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

CL

C L

CL

C L

CL

CL

C L

CL

C L

C L

C L

C L

C L

CL

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

CL CL

CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL

C L

CL CL CL CL CL CL CL

CLCL

CLCLCL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CLCLCL

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

CL CL

C L

C L

CL

CL

CL

CL

CL

CL

CLCL

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

CL

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

C L

0.

0.

0.

4.

6.

8.

2.

4.

6.

8.

2.

4.

6.

8.

2.

4.

6.

0.0

750.00

0.

0.

2.0

4.

6.

8.

2.

4.

6.

8.0

2.

4.

6.

8.

2.

4.

6.

8.

2.

4.

6.

778.00

8.

730.00

0.

0.

0.

770.00

0.

724.00726.00728.00732.00

4.

6.

8.0

2.

4.

6.0

748.00

2.

4.

6.

8.

2.

4.

6.

8.

772.00

4.

6.

8.

0.

0.

0.

0.

0.

0.

0.

740.00

0.

0.

760.00

4.

6.

8.

8.

2.

4.

6.

8.

2.

4.

6.

758.00

8.

8.

750.00

760.00

0.0

0.

0.

0.

770.00

770.00

770.00

750.00

0.

0.

0.

2.0

4.0

6.0

748.00 752.00

754.00

758.00762.00764.00

6.0

8.0

2.0

4.0

6.0

8.0

6.0

6.

8.

8.0

8.

2.

4.

6.

8.

2.

4.

6.

8.

2.

764.00 766.00

768.00

768.00

768.00

772.00

772.00

772.00 774.00

774.00

774.00

776.00

748.00

752.00754.00756.00

8.

2.

4.

6.

8.

2.

4.

774.00

4.

6.

776.00

776.00

8.

2.

4.

6.

8.

779.03 779.03

779.32

779.03779.03

778.78

778.78

777.13

BW 777.13

BW 777.13

TW 787.39

775.33

778.63

778.63

778.63

778.54

778.78778.71

778.78

778.71

778.63

777.59

777.49 778.36

778.26 778.58

777.76

777.96

777.92

777.89

774.87

777.50

777.88

778.04

778.25 778.25

778.37

777.87

777.33 774.59

774.32 773.43

774.13 762.54

751.37

751.37

762.85

749.50

746.16

749.54

749.50

748.20 748.52

751.64

749.67

762.69

778.35

778.53

777.04

778.58 778.48

777.81 777.68

777.04

775.67

778.56 778.59

750.30

750.33

TOP OF DAM

GRADING LIMITS

GRADING LIMITS

GRADING LIMITS

MAINTAIN EXISTING

GRADES ON GRAVEL

PARKING

TIE IN TO EXISTING

GRADES

PROVIDE POSITIVE DRAINAGE

PROVIDE POSITIVE DRAINAGE AWAY

FROM BUILDING IN ALL DIRECTIONS

TOP OF DAM = 774.00

TOP OF SPILLWAY = 772.50

TW 777.13

TW 777.13

BW 777.13

778.00

778.00

CB A-3

TOP:775.20

INV OUT:771.03 NW

JB A-2

TOP:776.20

INV IN:770.91 SE

INV OUT:770.81 NE

HW A-1

TOP:770.55

INV IN:770.00 SW

OS C-3

TOP:772.00

INV OUT:766.28 E

HW C-1

TOP:760.58

INV IN:758.00 NW

JB C-2

TOP:766.28

INV IN:760.68 W

INV OUT:758.28 SE

YD B-2

TOP:778.56

INV IN:775.39 E

INV OUT:775.29 W

CB B-1

TOP:775.21

INV IN:773.60 E

FES D-4

TOP:749.06

INV OUT:747.00 S

FES D-1

TOP:747.08

INV IN:744.00 N

CI D-2

TOP:750.25

INV IN:744.82 N

INV OUT:744.72 S

CI D-3

TOP:749.56

INV IN:745.90 N

INV OUT:745.80 S

779.25

778.58

YD B-3

TOP:778.58

INV OUT:775.71 W

778.57

778.60778.60

DRY ENHANCED

SWALE. SEE C502

741.00 741.00

739.80

739.80

0.

0.

8.

DRAWING NUMBER

ISSUED FOR CONSTRUCTION

REVISIONS

COPYRIGHT 2024 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND

SHALL NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART

WITHOUT EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

C

12-17-2024

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

12" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

ROSSVILLE MIDDLE SCHOOL

NEW FIELD AND CONCESSIONS FOR:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

316 BULLDOG TRAIL, ROSSVILLE, GA 30741

746-0206

01-920-041

# Doc # Date

C104

SCALE: 1" = 30'

GRADING NOTES:

1. GRADES SHOWN REPRESENT FINISH ELEVATIONS. CONTRACTOR TO

DEDUCT FOR SUB-GRADE ELEVATIONS.

2. CONTRACTOR TO SEED ALL AREAS DISTURBED IN CONSTRUCTION AREA,

INCLUDING AREAS WITHOUT TOPSOIL COVER.

3. CONTRACTOR TO STRIP TOPSOIL AND STOCK PILE ON-SITE FOR USE IN

THE LANDSCAPED/SEEDED AREAS.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR BACKFILLING CURB AND

SIDEWALKS AND SPREADING TOPSOIL IN SAME AREA.

5. CONTRACTOR SHALL REPAIR/RESTORE AREAS DAMAGED BY

CONSTRUCTION EQUIPMENT OR REMEDIAL WORK REQUIRED DUE TO

EROSION OR ACCUMULATED SILT.

6. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE

COMMENCEMENT OF ANY GRADING OR CLEARING.

7. ALL GRATES, MANHOLE COVERS, RINGS AND OTHER ACCESSORIES

SHOWN ON DETAILS SHALL BE PROVIDED UNLESS MARKED N.I.C.

8. ALL PIPES SHALL BE GROUTED INSIDE AND OUTSIDE OF STRUCTURES.

PIPES SHALL BE GROUTED OUTSIDE STRUCTURE PRIOR TO BACK-FILLING.

9. CONTRACTOR TO GRADE GRASSED AREAS TO MATCH GRADES SHOWN

AND MAINTAIN BUILDING AND PAVED AREA GRADES.

10. ALL SPOT GRADES ALONG CURB AND GUTTER ARE TO BOTTOM OF CURB

UNLESS OTHERWISE NOTED. (NOT SUBGRADE ELEVATION).

11. THE OVER-EXCAVATION OF THE DETENTION POND FOR SEDIMENT

STORAGE SHALL BE TEMPORARY. AT OR NEAR COMPLETION OF THE

PROJECT, THE SEDIMENT SHALL BE REMOVED, DISPOSED OF ON-SITE AND

THE POND SHALL BE BROUGHT TO FINISHED GRADES AS SHOWN ON

GRADING PLAN AND GRASSED. THE POND SHALL DRAIN COMPLETELY

AFTER FINAL GRADING.

GRADING PLAN

GRADING LEGEND:

S

CL

PROPOSED BUILDING

CURB & GUTTER

EXISTING CONTOURS

PROPOSED CONTOURS

PROPOSED SPOT ELEVATIONS

DRAINAGE SLOPE

CONSTRUCTION / CLEARING LIMITS

TOP OF WALLTW

1120.00

THE UTILITIES SHOWN ARE SHOWN FOR THE

CONTRACTORS CONVENIENCE ONLY. OTHER UTILITIES

MAY BE PRESENT BUT NOT SHOWN ON THESE DRAWINGS.

THE ARCHITECT & ENGINEER ASSUME NO RESPONSIBILITY

FOR THE UTILITY LOCATIONS SHOWN, AND IT SHALL BE THE

CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE

EXACT LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF

THE WORK. ALL DAMAGE MADE TO THE EXISTING UTILITIES

BY THE CONTRACTOR SHALL BE REPAIRED TO A "LIKE NEW"

CONDITION. THE CONTRACTOR SHALL BEAR THE SOLE

RESPONSIBILITY FOR ANY LOSSES THAT OCCUR FROM

DAMAGES TO THE EXISTING UTILITIES.

CAUTION:

Feet 0 30 60

BOTTOM OF WALL (NOT TOP OF FOOTING)BW

1 AD1

01-10-2025

File details come from the government source that posted it. Updated .