01920041_Final_Spec_Manual_12_17_2024.pdf
PDF 11 MB Posted
- Solicitation number
- PE-55462-NONST-2025-000000010
- Issued by
- Wilcox County, Georgia
About this file
This is a bid solicitation notice from the Walker County Board of Education for the construction of the Rossville Middle School Athletic Field and Concessions project located at 2478 Happy Valley Road in Rossville, Georgia. Sealed bids from General Contractors will be accepted at the Facilities and Operations Department at 298 Culberson Avenue, LaFayette, GA until 2:00 PM on Thursday, January 16, 2025. A mandatory pre-proposal meeting is scheduled for Tuesday, January 7, 2025, at 11:00 AM at 298 Culberson Avenue, LaFayette, GA. Any contractors who do not attend the mandatory pre-bid meeting will not be permitted to submit a bid, and any bids received from non-attendees will be returned unopened.
No additional pricing terms, set-asides, funding information, or other financial details are provided in this notice. The document serves primarily as an initial announcement of the contract opportunity and mandatory pre-bid meeting requirements.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOUSE BILL 1079 REQUIRES THAT NO GOVERNMENTAL ENTITY
SHALL ISSUE OR CAUSE TO BE ISSUED ANY ADDENDA MODIFYING
PLANS AND SPECIFICATIONS WITHIN A PERIOD OF 72 HOURS PRIOR
TO THE ADVERTISED TIME FOR THE OPENING OF BIDS, EXCLUDING
SATURDAYS, SUNDAYS, AND LEGAL HOLIDAYS. THEREFORE,
SOUTHERN A & E REQUESTS THAT ALL QUESTIONS REQUIRING
CLARIFICATION BY ADDENDUM BE SUBMITTED NO LESS THAN 96
HOURS PRIOR TO THE ADVERTISED TIME FOR THE OPENING OF BIDS.
SAE TABLE OF CONTENTS 00 00 30 - 1
Table of Contents
SECTION
NUMBER TITLE
00 00 30 Table of Contents
SERIES 0- BIDDING REQUIREMENTS AND CONTRACT FORMS
00 03 00 Advertisement for Proposals
00 10 00 Instructions to Bidders
00 30 00 Bid Form
00 40 00 Immigration & Security Form
00 70 00 Standard Form of Fixed Price Contract
General Contractor Compensation & Fee Proposal
Consent to Release Information
Offeror’s and Individual’s Affidavit of Noncollusion
Contract Affidavit
Bid Bond- General Contractor
Payment Bond -General Contractor
Performance Bond-General Contractor
DIVISION 1- GENERAL REQUIREMENTS
01 10 00 Summary
01 21 00 Allowances
01 22 00 Unit Prices
01 23 00 Alternates
01 25 00 Substitution Procedures
01 26 00 Contract Modification Procedures
01 29 00 Payment Procedures
01 29 01 Attachment A: Statutory Affidavit
01 29 02 Attachment B: Warranty by General Contractor
01 29 03 Attachment C: Roof Guarantee
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 41 00 Structural Tests and Special Inspections
01 50 00 Temporary Facilities and Controls
01 56 39 Temporary Tree and Plant Protection
01 60 00 Product Requirements
01 73 00 Execution
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance Data
01 78 39 Project Record Documents
DIVISION 2- EXISTING CONDITIONS
DIVISION 3- CONCRETE
03 20 00 Concrete Reinforcing
03 30 00 Cast-In-Place Concrete
DIVISION 4- MASONRY
04 20 00 Unit Masonry
DIVISION 5- METALS
05 12 00 Structural Steel Framing
05 21 00 Steel Joists Framing
05 31 00 Steel Decking
05 50 00 Metal Fabrications
05 52 13 Pipe & Tube Railings
DIVISION 6- WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry
06 41 13 Wood-Veneer Faced Cabinets
DIVISION 7- THERMAL AND MOISTURE PROTECTION
07 41 13 Standing Seam Metal Roof Panels
07 42 17 Metal Soffit Panels
07 54 23 Thermoplastic Polyolefin (TPO) Roofing
07 62 00 Sheet Metal Flashing and Trim
07 71 00 Roof Specialties
SAE TABLE OF CONTENTS 00 00 30 - 2
07 72 00 Roof Accessories
07 92 00 Joint Sealants
DIVISION 8- OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 33 13 Coiling Counter Doors
08 33 23 Overhead Coiling Doors
08 71 00 Door Hardware
DIVISION 9- FINISHES
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 65 13 Resilient Wall Base and Accessories
09 91 13 Exterior Painting
09 91 23 Interior Painting
DIVISION 10- SPECIALTIES
10 14 23 Panel Signs
10 28 00 Toilet, Bath, and Laundry Accessories
10 44 16 Fire Extinguishers and Cabinets
10 73 10 Walkway and Canopy Covers
10 75 16 Ground-Set Flagpoles
DIVISION 11- EQUIPMENT
11 66 23 Athletic Equipment
11 66 40 Athletic Scoreboards
DIVISION 12- FURNISHINGS
DIVISION 13- SPECIAL CONSTRUCTION
13 12 50 Bleachers
DIVISION 14- CONVEYING EQUIPMENT
DIVISION 21- FIRE SUPPRESSION
21 05 23 General-Duty Valves for Fire Protection Piping
21 11 00 Facility Fire-Suppression Water-Service Piping
21 11 16 Facility Fire Hydrants
DIVISION 22- PLUMBING
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping
22 05 18 Escutcheons for Plumbing Piping
22 05 19 Meters and Gages for Plumbing Piping
22 05 23 General-Duty Valves for Plumbing Piping
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 33 Heat Tracing for Plumbing Piping
22 05 53 Identification for Plumbing Piping and Equipment
22 07 19 Plumbing Piping Insulation
22 11 13 Facility Water Distribution Piping
22 11 16 Domestic Water Piping
22 11 19 Domestic Water Piping Specialties
22 13 13 Facility Sanitary Sewers
22 13 16 Sanitary Waste and Vent Piping
22 13 19 Sanitary Waste Piping Specialties
22 13 21 Miscellaneous Drain Piping
22 33 00 Electric, Domestic-Water Heaters
22 42 13.13 Commercial Water Closets
22 42 16.13 Commercial Lavatories
22 42 16.16 Commercial Sinks
DIVISION 23- HVAC
23 05 29 Hangers And Supports For HVAC Piping And Equipment
23 05 53 Identification For HVAC Piping And Equipment
23 05 93 Testing, Adjusting, And Balancing For HVAC
23 07 13 Duct Insulation
23 07 19 HVAC Piping Insulation
23 09 00 Instrumentation And Control For HVAC
23 09 93 Sequence Of Operations For HVAC Controls
23 31 13 Metal Ducts
23 33 00 Air Duct Accessories
23 34 23 HVAC Power Ventilators
SAE TABLE OF CONTENTS 00 00 30 - 3
23 72 00 HVAC Roof Accessories
DIVISION 26- ELECTRICAL
26 01 00 General Electrical Requirements
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
26 05 53 Identification for Electrical Systems
26 09 23 Lighting Control Devices
26 24 16 Panelboards
26 27 26 Wiring Devices
26 28 13 Fuses
26 28 16 Enclosed Switches and Circuit Breakers
26 51 00 Interior Lighting
DIVISION 27- COMMUNICATIONS
DIVISION 28- ELECTRONIC SAFETY & SECURITY
DIVISION 31- SITE CONSTRUCTION
31 10 00 Site Clearing
31 10 19 Erosion, Sedimentation and Pollution Control > 1 ac
31 20 00 Earth Moving
31 31 16 Termite Control
DIVISION 32- EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 13 73 Concrete Paving Joint Sealants
32 17 13 Wheel Stops
32 17 23 Pavement Markings
32 17 26 Tactile Warning Tiles
32 31 13 Chain Link Fences and Gates
32 92 00 Turf and Grasses
32 92 13 b Artificial Sports Fields
DIVISION 33- UTILITIES
33 41 00 Storm Utility Drainage Piping
33 46 00 Subdrainage
SAE TABLE OF CONTENTS 00 00 30 - 4
NOTICE AND ADVERTISEMENT FOR CONTRACT OPPORTUNITY
WALKER COUNTY BOARD OF EDUCATION
ROSSVILLE MIDDLE SCHOOL ATHLETIC FIELD AND CONCESSIONS
INVITATION TO BID
1.1 SOLICITATION
A. Sealed bids from General Contractors will be received by Walker County Board of Education in the Facilities and
Operations Department at 298 Culberson Avenue, LaFayette, GA 30728 until 2:00 P.M. on Thursday, January 16, 2025 for construction of:
ROSSVILLE MIDDLE SCHOOL ATHLETIC FIELD AND CONCESSIONS
2478 HAPPY VALLEY ROAD, ROSSVILLE, GA 30741
B. A Mandatory Pre-Proposal Meeting will be held on Tuesday, January 7, 2025 at 11:00 A.M. at 298 Culberson Avenue, LaFayette, GA 30728.. Any person or entity that fails to attend the mandatory pre-bid meeting will not be permitted to submit a Bid for the Project and any Bid submitted by a person or entity that did not attend the mandatory pre-bid meeting will be returned unopened.
C. No extension of bid will be made. Interested parties are invited to attend.
1.2 BID DOCUMENTS
A. Bid documents may be examined at Southern A & E’s office at 7951 Troon Circle, Austell, GA 30168 or by calling 770-
819-7777 to request a password and link to Southern A & E’s online plan service to view the documents. Upon further request, construction documents may be downloaded for printing or hard copies may be ordered through the online plan service. Only complete sets will be provided for downloading or as hardcopies.
B. No deposits are required and no refunds will be made.
C. Bid documents will not be sent to plan rooms.
1.3 CONDITIONS
A. No bid may be withdrawn for a period of sixty (60) days after bids are opened.
B. Bid bond in the amount of five (5%) percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal check, cashier’s check, certified check or cash will be accepted in lieu of the bid bond.
C. Performance and payment bonds in the amount of one hundred percent (100%) of the contract price will be required prior to commencement of construction.
D. All bonds shall be written by a surety licensed to conduct business in Georgia, listed on the Federal Register and acceptable to the Owner.
E. Bidder shall attach a Contractor Affidavit and Agreement demonstrating compliance with O.C.G.A. 13-10-91, Georgia
Security and Immigration Compliance Act. Bidder shall also comply with provisions of O.C.G.A. 50-36-1, Verification of Lawful Presence Within United States through the use of the Systematic Alien Verification for Entitlements (SAVE)
Program and shall provide verification of compliance with executed affidavits which are a part of the bid packet.
F. Owner reserves the right to waive technicalities and irregularities and to reject any or all bids. The bids will be evaluated and the Contract awarded will be on a lump sum basis to the lowest responsive and responsible bidder.
G. By submitting a bid, the Bidder agrees to sign the Owner’s STANDARD FORM OF FIXED PRICE CONSTRUCTION
CONTRACT, which is one of the bid documents.
1.4 SOLICITED BY:
Chris Wallace, Director of Facilities and Operations
Walker County Board of Education
Date advertised: December 17, 2024 on Website and Georgia Procurement
December 25, 2024 and January 8, 2025 in the Walker County Messenger
22811 – New Field and Concessions for Rossville Middle School 00100-1
SECTION 00100
INSTRUCTIONS TO BIDDERS
PART 1 - GENERAL
1.1 DEFINITIONS:
A. Bidding Documents: The Invitation to Bid, Instructions to Bidders, Bid Form, and Contract Documents as described in Article 1 of the Owner’s STANDARD FORM OF FIXED PRICE CONSTRUCTION CONTRACT (the “Contract”).
B. Addenda: Written or graphic documents issued by Architect prior to execution of the Contract which modify or clarify Bidding Documents.
Addenda will become part of the Contract Documents when the Contract is executed.
C. Bid: Complete and properly signed bid to perform the Work described by Bidding Documents for sum stipulated therein. In order to be complete, Bid shall be accompanied by additional data required to be submitted with Bid.
D. Base Bid: Sum stated in Bid Form for which Bidder proposes to complete the Work described, without consideration for Work proposed to be added or deleted by Alternates.
E. Alternates: Amount stated in Bid Form to be added to or deducted from Base Bid amount, brought about by a change in scope of the Work.
Alternates are described in Alternates Section of specifications.
F. Bidder: One who submits a Bid for prime contract with Owner for the Work described in the Bidding Documents.
G. Sub-bidder: One who submits a sub-bid for a portion of the Work to a Bidder.
H. Definitions established in the Contract.
1.2 BIDDING DOCUMENTS:
A. Bidding Documents may be examined at the sources indicated in the Invitation to Bid. Documents may be obtained by Bidders or Sub-
22811 – Chattanooga Valley Middle School Athletic Fields 00100-2 Instruction to Bidders
Bidders from the source indicated in the Invitation to Bid upon deposit of the stipulated sum.
B. Deposits for one set of Bidding Documents, less mailing cost, if any, will be refunded to Bidders submitting a bona fide Bid upon return of Documents in good condition within ten (10) days after the date of receipt of Bids. Deposit of successful Bidder will not be returned. Cost of reproduction of Bidding Documents and mailing costs will not be returned to Bidders who do not submit a bona fide Bid.
C. Refunds for all other Bidding Documents to Sub-bidders and additional sets to Bidders will be made less actual costs of reproduction and mailing, upon return of Bidding Documents in good condition within the (10) days after date of receipt of Bids.
D. Bidding Documents are the property of the Owner and shall remain the property of the Owner. Bidding Documents are not to be used on other projects without expressed written consent of the Owner and, in the case of plans and specifications, the Architect. All Bidding Documents must be returned to the Architect's office within the period previously stated.
E. Costs of replacement of missing or damaged documents will be deducted from deposit refund.
F. Complete sets of Bidding Documents shall be used in preparing
Bids. Owner and Architect assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
G. Owner and Architect, in making copies of Bidding Documents available on above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for other use.
1.3 INTERPRETATIONS OF BIDDING DOCUMENTS:
A. Bidders shall promptly notify Architect of ambiguity, inconsistency, or error which they may discover upon examination of the Bidding Documents or of the site and local conditions.
B. Bidders requiring clarification or interpretation of Bidding
Documents shall make a written request to Architect, and be received by the Architect at least ten (10) days prior to date for receipt of Bids.
C. Interpretations, corrections, or changes to the Bidding Documents will be made by Addendum. Interpretations, corrections, or change of
22811 – Chattanooga Valley Middle School Athletic Fields 00100-3
Bidding Documents made in any other manner will not be binding and Bidders shall not rely upon such interpretations, corrections, or changes.
1.4 PRIOR APPROVALS:
A. If it is desired to use products different from those indicated in the
Contract Documents, the party requesting the approval shall make written application as described herein. The burden of proving equality of proposed product rests on the party making the request for approval.
1. Requests for approval shall reach the Architect not less than ten (10) days prior to the date set for opening of Bids.
Requests received by Architect after this date will not be considered. Facsimiles requesting prior approvals will not be accepted at any time.
2. Requests for approval shall be accompanied by such technical data as the party making the request desires to submit.
Architect will consider reports from independent testing laboratories, verified experience records from previous users, and other printed or written information valid in the appropriate circumstances.
3. Requests for approval shall indicate in what respects proposed materials or products differ from those specified.
4. Requests for approval shall be accompanied by the manufacturer's printed recommendations describing the installation, use and care, as applicable, of proposed products.
5. Determination as to acceptability of proposed products will be made based only upon data submitted.
B. If a proposed product is approved by the Architect, an addendum will be issued to prospective bidders not less than seven (7) days prior to the date set for opening of bids. Unless requests are received and approved as described above, the successful bidder shall be responsible for furnishing materials and products in accord with the Contract Documents, except as provided in Products and Substitutions.
1.5 ADDENDA:
A. Addenda, when required, shall be issued to all recorded holders of
Bidding Documents.
B. Addenda will not be issued later than seven (7) days prior to date of receipt of Bids, except an addendum, if necessary, postponing the date of receipt of Bids or withdrawing request for Bids or to include information which, in the opinion of the Owner or the Architect, will help to insure fairness and equality in the bidding procedure.
22811 – Chattanooga Valley Middle School Athletic Fields 00100-4
C. Each Bidder shall ascertain, prior to submitting Bid or Sub-bid, that all issued Addenda have been received. Bidders shall acknowledge their receipt on Proposal Form.
1.6 BIDDING PROCEDURES:
A. Form:
1. Bids shall be submitted in duplicate on forms provided by the Owner.
2. All blanks on the Bid Form shall be filled in by typewriter or manually in ink.
3. Dollar amounts shall be expressed in both words and figures and, in case of discrepancy between the two, written amount shall govern.
4. Interlineation, alteration, or erasure shall be initialed by signer of Bid.
5. Bidders may bid any combination of the separate and combined bid amounts.
6. All requested Alternates shall be bid.
7. Each copy of Bid shall include legal name of Bidder and a statement whether Bidder is a sole proprietor, a partnership, a corporation or other legal entity, and shall be signed by the person or persons legally authorized to bind Bidder to a contract. A Bid by a corporation shall further give state of incorporation and have a corporate seal affixed. A Bid submitted by an agent shall have a current Power of Attorney attached certifying agent's authority to bind Bidder.
B. Bid Security:
1. Each Bid shall be accompanied by bid security in the
Owner’s required form and amount pledging that the Bidder will enter into a contract with the Owner on terms stated in its Bid and will furnish Performance and Payment Bonds as described hereinafter. Should the Bidder refuse to enter into such contract or fail to furnish bonds, if required, the amount of bid security shall be forfeited to the Owner not as a penalty, but as liquidated damages.
2. All bonds shall be written in on the form of the Owner, and Attorney-in-fact who executes bond on behalf of surety shall attach to bond a certified and current copy of its Power of Attorney.
No other form of bid security will be acceptable. Bonds will not be accepted by facsimile.
3. Owner will have the right to retain bid security of Bidders until either:
a. Contract has been executed and bonds, if required, have been furnished or
22811 – Chattanooga Valley Middle School Athletic Fields 00100-5
b. Specified time has elapsed so that Bids may be withdrawn, or
c. All Bids have been rejected.
C. Submission of Bids:
1. Copies of Bid, Bid Security, and other documents required to be submitted with Bid shall be enclosed in a sealed opaque envelope. Envelope shall be addressed to party receiving Bids and shall be identified with project name, Bidder's name and address. If Bid is sent by mail, sealed envelope shall be enclosed in separate mailing envelope with notation "BID ENCLOSED" and project name on face thereof.
2. Bids shall be deposited at designated location prior to time and date for receipt of Bids. Bids received after time and date for receipt of Bids will be returned unopened.
3. Bidder shall assume full responsibility for timely delivery at location designated for receipt of Bids.
4. Oral, telephonic, or telegraphic Bids are invalid and will not receive consideration.
D. Modification or Withdrawal of Bid:
1. Except as provided in O.C.G.A. Sections 36-91-52 and 36-91-53, Bid may not be modified, withdrawn, or canceled by Bidder during stipulated time period following time and date designated for receipt of Bids and Bidder so agrees in submitting its Bid.
1.7 CONSIDERATION OF BIDS:
A. Opening of Bids: Properly identified Bids received on time will be publicly opened and read aloud. An abstract of amounts of Base Bids and Alternates will be made available to Bidders.
B. Rejection of Bids: Owner shall have the right to reject any and all
Bids and, in particular, to reject a late Bid, a Bid not accompanied by the required Bid Bond or other data required by the Bidding Documents, or a Bid in any way incomplete or irregular. No other form of Bid Security, including Certified Checks, cash, etc. will be accepted in lieu of a Bid Bond.
C. Acceptance of Bid:
1. Owner shall have the right to waive any technicalities and informalities.
2. It is the intent of Owner to award the Contract to lowest responsive and responsible Bidder provided Bid has been
22811 – Chattanooga Valley Middle School Athletic Fields 00100-6 submitted in accord with the requirements of Bidding Documents, is judged to be reasonable, and does not exceed funds available.
3. The low responsive and responsible Bidder will be determined by considering the Base Bid plus or minus any alternates. Deductive alternates or additive alternates will be taken in the respective order listed on the Bid Form unless one Bidder is low regardless of any combination of the alternates. Deductive alternates are for the purpose of ensuring the project can be contracted within the budget and additive alternates are for the purpose of considering possible enhancements to the project; as such, additive and deductive alternates will not be mixed in determining the low responsive and responsible Bidder.
END OF SECTION
01-920-041
22811- New Field and Concessions for Rossville Middle School ____00300-1
SECTION 00300
BID FORM
Date: ____________________
Walker County Board of Education 298 Culberson Avenue LaFayette, Georgia 30278
ATTN: _____________________
Gentlemen:
Having carefully examined the Bidding Documents entitled New Field and Concessions for: Rossville Middle School and the premises and conditions affecting the work, the Undersigned proposes to furnish all services, labor, and material called for by them in accord with said documents, for the following sum:
______________________________________ Dollars ($______________________), which sum is hereinafter called the "Base Bid".
The Undersigned agrees to commence actual Work on the site with an adequate force and equipment upon, but not before, receipt of Notice to Proceed and to achieve substantial completion of the Work under the Base Bid within __________ days thereafter.
In submitting this bid I further agree to the following unit prices for the work indicated:
1. Unit Price 1: Unsatisfactory Soils
a. Excavate unsatisfactory alluvial soils, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($ ________) per cubic yard.
2. Unit Price No. 2: Mass Rock
a. Excavate mass rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($ ________) per cubic yard.
3. Unit Price No. 3: Trench Rock
a. Excavate trench rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($ ________) per cubic yard.
4. Unit Price No. 4: Rock Boring
22811 – New Field and Concessions for Rossville Middle School 00300-2 Bid Form
a. Perform rock boring as required for utility installation for the unit price of ($ ________) per linear foot of rock bored based on survey of distance bored.
5. Unit Price No. 5: Type C Silt Fence
a. Provide and install additional Type C Silt fence for the unit price of ($
_____) per linear foot of silt fence installed based on survey of additional length.
6. Unit Price No. 6: Erosion Control Matting
a. Provide and install additional erosion control matting for the unit price of ($
_____) per square yard of matting installed based on survey of additional area covered.
7. Unit Price No. 7: Straw Mulch
a. Provide and install additional straw mulching for the unit price of ($
______) per square foot of straw mulching installed based on survey of additional area covered.
8. Unit Price No. 8: Temporary Grassing
a. Provide and install additional temporary grassing for the unit price of ($
______) per square foot of temporary grassing installed based on survey of additional area covered.
9. Unit Price No. 9: Permanent Grassing
a. Provide and install additional permanent grassing for the unit price of ($
______) per square foot of grassing installed based on survey of additional area covered.
10. Unit Price No. 10: Bermuda Turfgrass Sod
a. Provide and install additional Bermuda sod for the unit price of ($ ______) per square foot of sod installed based on survey of additional area covered.
11. Unit Price No. 11: Stone Check Dam
a. Provide and install additional two foot high by eight-foot-long check dam using two (2) inch to ten (10) inch stone for the unit price of ($ ______) per check dam installed based on survey of additional units.
12. Unit Price No. 12: Hay Bale Check Dam
a. Provide and install additional staked, hay bale check dam for the unit price of ($ ______) per additional units installed based on survey of additional units installed.
13. Unit Price No. 13: Rip-Rap
a. Provide and machine place additional rip-rap for the unit price of ($
______) per ton based on delivery tickets.
14. Unit Price No. 14: Sd2-F Inlet Sediment Trap
a. Provide and install additional Sd2-F inlet sediment trap, fabric-wire backed with support frame for the unit price of ($ ______) per each trap based on survey of number of additional units installed.
15. Unit Price No. 15: Sd2 Inlet Sediment Trap
a. Provide and install additional Sd2 block and gravel inlet sediment trap for the unit price of ($ ______) per each based on survey of number of additional units installed.
22811 – New Field and Concessions for Rossville Middle School 00300-3
16. Unit Price No. 16: “Silt Saver” Inlet Sediment Trap
a. Provide and install additional “Silt Saver”, or equal, inlet sediment trap for the unit price of ($ ______) per each based on survey of number of additional units installed.
17. Unit Price No. 17: Polyacrylamide Gel Blocks
a. Provide and install additional polyacrylamide gel blocks for the unit price of
($ ______) per each based on survey of number of additional units installed.
18. Unit Price No. 18: Concrete Walk
a. Provide and install additional concrete walk (sidewalk) for the unit price of
($ ______) per square foot of sidewalk installed based on survey of additional area covered.
19. Unit Price No. 19: Chain Link Fence
a. Provide and install additional 4 feet tall chain link fence for the unit price of
($ ______) per linear foot of fence installed based on survey of additional length.
20. Unit Price No. 20: Chain Link Fence
a. Provide and install additional 6 feet tall chain link fence (6 gauge) for the unit price of ($ ______) per linear foot of fence installed based on survey of additional length.
21. Unit Price No. 21: Chain Link Fence
a. Provide and install additional 6 feet tall chain link fence (9 gauge) for the unit price of ($ ______) per linear foot of fence installed based on survey of additional length.
If the Undersigned is notified in writing by mail, telegraph, or delivery of the acceptance of this bid within sixty (60) days after the time set for the opening of bids, the Undersigned agrees to sign the Owner’s STANDARD FORM OF FIXED PRICE CONSTRUCTION CONTRACT (the “Contract”), which is one of the Bidding Documents within ten days of such notification and at the same time to furnish and deliver to the Owner a Performance Bond and Payment Bond, in the form provided by the Owner, both in an amount equal to 100% of the Contract Price, and to perform the Work for the above stated compensation. The Surety on such Performance Bond and Payment Bond shall be (a) authorized to conduct business in the State of Georgia, (b) rated “A- IX” or better by A.M. Best Company, and (c) listed by the United States Department of the Treasury in its Listing of Approved Sureties (Department Circular 570) with an underwriting limitation equal to or greater than the Contract Price.
Attached hereto is a Bid Bond executed in accord with the Instructions to Bidders in the amount being not less than 5% of the Base Bid, made payable to the Owner, as obligee. The undersigned agrees that in case of failure on its part to execute the Contract and required Performance Bond and Payment Bond within ten days after being given written notice of the award of Contract, the Bid Bond accompanying this Bid is
22811 – New Field and Concessions for Rossville Middle School 00300-4 callable, otherwise, said Bid Bond shall be returned to the Undersigned upon completion of such obligations.
Addendum No. _______ is acknowledged to be the last addendum received in numerical sequence.
Respectfully submitted, BY:
Title:
COMPANY:
(CORPORATE SEAL)
ADDRESS:
WITNESS:
END OF SECTION
01-920-041
IMMIGRATION AND SECURITY FORM
Contractors and Individuals Performing Services for
Walker County Board of Education
Any contractor who contracts with Walker County Board of Education for the performance of services in which the fee for services or labor exceeds $2,499.99 must comply with the Federal work authorization program by signing and submitting an E-Verify Contractor Affidavit to Walker County Board of
Education unless:
1. the contractor has no employees and no intent to hire employees in which case the contractor must present an approved state-issued identification card or driver’s license. The driver’s license or identification card is acceptable only if it is issued by a state that verifies lawful immigration status prior to issuance; or
2. the contract is with an individual licensed under Title 26, Title 43 or the State Bar of Georgia who is in good standing and is performing the service. Subcontractors are held to the same requirement. A copy of the Georgia License issued under Title 26, Title 43 or the State Bar of
Georgia must be submitted with this form.
In order to insure compliance with the Immigration Reform and Control Act of 1986 (IRCA), Pub.L. 99-
603 and the Georgia Security and Immigration Compliance Act O.C.G.A. § 13-10-90 et. seq., Contractor must certify compliance by initialing one of the sections below:
_____The Contractor has employees and has attached completed Contractor Affidavit (Form A).
Subcontractor Affidavit (Form B) and Sub-subcontractor Affidavit (Form C) are also attached if applicable. W-9 Request for Taxpayer Identification Number is also attached.
_____The Contractor has no employees and has attached a copy of a valid driver’s license or other approved state-issued identification card. W-9 Request for Taxpayer Identification Number is also attached.
_____The Contractor is an individual licensed under Title 26, Title 43 or the State Bar of Georgia who is in good standing and is performing the service. Copy of Georgia license is attached. W-9 Request for
Taxpayer Identification Number is also attached.
Signature Title
By signing above, you are certifying that the representations made herein are true and correct.
Firm Name:___________________________________________________________________________
Street/Mailing Address: _________________________________________________________________
City, State, Zip Code: _________________________________________________________________
Telephone Number: _________________________________________________________________
Email Address: _________________________________________________________________
Sworn to and subscribed before me
This ____ day of _________________, 20____.
Notary Public dennis Text Box
ADDENDUM NO.1
Walker County BOE Fixed Price Construction Contract (12.2009)
STANDARD FORM OF
FIXED PRICE CONSTRUCTION CONTRACT
BETWEEN
THE WALKER COUNTY BOARD OF EDUCATION
AND
[Contractor]
PROJECT: New Field and Concessions for
Rossville Middle School
Address: 316 Bulldog Trail, Rossville, GA 30741
ARCHITECT: Southern A & E Architect’s Address: 7951 Troon Circle Austell, Georgia 30168
Walker County BOE Fixed Price Construction Contract (12.2009) i
T A B L E O F C O N T E N T S
ARTICLE 1 DOCUMENTS INCORPORATED BY REFERENCE
ARTICLE 2 REPRESENTATIONS OF THE CONTRACTOR
2.1 Generally
2.2 Qualification Information
ARTICLE 3 CONTRACT CONSTRUCTION
3.1 Intent and Interpretation
3.2 Ownership
ARTICLE 4 CONTRACTOR'S PERFORMANCE
4.1 Generally
ARTICLE 5 TIME FOR CONTRACTOR'S PERFORMANCE
5.1 Time for Performance
5.2 Liquidated Damages for Delay
5.3 Substantial Completion
5.4 Time is of the Essence
ARTICLE 6 FIXED PRICE AND CONTRACT PAYMENTS
6.1 Contract Price
6.2 Schedule of Values
6.3 Payment Procedures
6.4 Payments by Contractor
6.5 No Acceptance of Work
6.6 Refusal to Make Payment
6.7 Untimely Payments
6.8 Inspection and Payment at Substantial Completion
6.9 Final Completion
6.10 Final Inspection; Final Approval for Payment
6.11 Time for Final Completion; Liquidated Damages for Delay in Final Completion
6.12 Conditions Precedent to Final Payment
6.13 Final Payment
ARTICLE 7 INFORMATION AND MATERIAL SUPPLIED BY THE OWNER
7.1 Generally
7.2 Easements
7.3 Contract Copies
ARTICLE 8 CEASE AND DESIST ORDER
ARTICLE 9 DUTIES, OBLIGATIONS AND RESPONSIBILITIES OF THE CONTRACTOR
9.1 Generally
9.2 Warranty
9.3 Schedule for Completing Work
9.4 Storm Water Discharge Permits ……………………………………………………….. 12
ARTICLE 10 INDEMNITY
ARTICLE 11 THE PROJECT ARCHITECT
11.1 Architect
ARTICLE 12 CLAIMS BY THE CONTRACTOR
12.1 Generally
12.2 Delays Generally
12.3 Mediation
Walker County BOE Fixed Price Construction Contract (12.2009) ii
ARTICLE 13 SUBCONTRACTORS
ARTICLE 14 CHANGE ORDERS
14.1 Generally
ARTICLE 15 DISCOVERING AND CORRECTING DEFECTIVE OR INCOMPLETE WORK
15.1 Work in Violation of Contract
15.2 Work in Conformity with Contract
15.3 Defective or Nonconforming Work
15.4 Duty to Correct Defective or Nonconforming Work
15.5 Owner’s Option
ARTICLE 16 TERMINATION BY THE CONTRACTOR
ARTICLE 17 OWNER'S RIGHT TO SUSPEND CONTRACTOR'S PERFORMANCE
17.1 Suspension
17.2 Compensation
ARTICLE 18 TERMINATION BY THE OWNER
18.1 Termination for Convenience
18.2 Termination for Cause
18.3 Termination Not Subject to Article 12
ARTICLE 19 INSURANCE
ARTICLE 20 SURETY BONDS
ARTICLE 21 PROJECT RECORDS
ARTICLE 22 APPLICABLE LAW
ARTICLE 23 SUCCESSORS AND ASSIGNS
EXHIBIT A LIST OF PLANS AND SPECIFICATIONS FOR THE PROJECT
EXHIBIT B LIQUIDATED DAMAGES
EXHIBIT C MINIMUM REQUIREMENTS FOR CONTRACTOR’S SCHEDULE OF
CONSTRUCTION
EXHIBIT D REQUIRED INSURANCE
EXHIBIT D - 1 ENDORSEMENT TO BUILDER’S RISK
EXHIBIT E IMMIGRATION AND SECURITY FORM
Walker County BOE Fixed Price Construction Contract (12.2009) 1
This FIXED PRICE CONSTRUCTION CONTRACT (the "Contract") is made and entered into by and between THE WALKER COUNTY BOARD OF EDUCATION (the “Owner”) and (the "Contractor"). This Contract is executed under seal, and shall be effective on the date executed by the last party to execute it.
This Contract is for the construction of a project identified as NEW FIELD AND CONCESSIONS FOR ROSSVILLE MIDDLE SCHOOL (the "Project").
NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements stated herein, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, the parties agree as follows:
ARTICLE 1
DOCUMENTS INCORPORATED BY REFERENCE
This Contract includes this instrument, all exhibits hereto, the plans and specifications for the Project identified thereon as such, the Contractor’s Bid or Proposal (as applicable), Supplemental Conditions, if any, Special Conditions, if any, and all Addenda issued prior to execution of the Contract, if any, plus the following (if any):
all of which are hereby incorporated herein by reference and made a part hereof. Attached hereto as Exhibit “A” is a list of the plans and specifications for the Project. Change Orders issued hereafter, and any other amendments executed by the Owner and the Contractor, shall become and be a part of this Contract. Documents not included or expressly contemplated in this Article 1 do not, and shall not, form any part of this Contract. The Contract, of which this instrument is a part, may sometimes be referred to as the “Contract Documents.”
ARTICLE 2
REPRESENTATIONS OF THE CONTRACTOR
2.1 Generally. In order to induce the Owner to execute this Contract and recognizing that the Owner is relying thereon, and without limiting or restricting any other representation or warranty set forth elsewhere or implied by law, the Contractor, by executing this Contract, makes the following express representations and warranties to the Owner:
2.1.1 The Contractor is fully qualified to act as the contractor for the Project and has, and shall maintain, any and all licenses, permits or other authorizations necessary to act as the contractor for, and to construct, the Project.
2.1.2 The Contractor has visited, inspected and become familiar with the Project site and the local conditions under which the Project is to be constructed and operated.
2.1.3 The Contractor has received, reviewed and carefully examined all of the documents which make up this Contract, including, but not limited to, the plans and specifications, and believes them in all respects to be complete, accurate, adequate, consistent, coordinated and sufficient for construction.
2.2 Qualification Information. The Contractor represents, warrants and affirms that only truthful, complete and correct information has been provided to the Owner with the Contractor’s Bid or Proposal (as applicable), and in any other communication from the Contractor regarding the Contractor’s qualifications or responsibility to perform the obligations of the Contractor under this Contract (all such
Walker County BOE Fixed Price Construction Contract (12.2009) 2 information being referred to herein as “Qualification Information”). The Contractor further represents, warrants and affirms that in the event that any Qualification Information changed in any material way after it was communicated from the Contractor and before this Contract is signed by all parties, the Contractor has immediately notified the Owner, in writing, of such change or changes and Contractor agrees that Owner may take such action thereon as Owner deems appropriate. The Contractor acknowledges and agrees that the Owner has relied, and will continue to rely, on the truthfulness, completeness and correctness of the Qualification Information. The Contractor acknowledges and agrees that all Qualification Information is material and important to the Owner’s evaluation of the Contractor’s qualifications and responsibility to undertake the Contractor’s obligations under this Contract. Contractor acknowledges and agrees that if the Contractor knowingly provided any false, incorrect, misleading or incomplete information to the Owner in any Qualification Information, or failed to advise the Owner in writing of any material change in such information as set forth in this Paragraph, this Contract shall be deemed to be materially breached by Contractor and subject to immediate termination for cause or rescission for cause by the Owner, at the sole option of the Owner. The Owner also shall have and retain any and all other rights and remedies provided by law, in contract or otherwise.
ARTICLE 3
CONTRACT CONSTRUCTION
3.1 Intent and Interpretation. With respect to the intent and interpretation of this Contract, the Owner and the Contractor agree as follows:
3.1.1 This Contract, together with the Contractor's and Surety's performance and payment bonds for the Project, constitute the entire and exclusive agreements between the parties with reference to the Project, and said Contract supersedes any and all prior discussions, communications, representations, understandings, negotiations, or agreements. This Contract also supersedes any bid documents, but only to the extent that it is inconsistent therewith.
3.1.2 Anything that may be required, implied or inferred by the documents which make up this Contract, or any one or more of them, shall be provided by the Contractor for the Contract Price.
3.1.3 Nothing contained in this Contract shall create, nor be interpreted to create, privity or any other relationship whatsoever between the Owner and any person or entity except the Contractor.
3.1.4 The specification herein of any act, failure, refusal, omission, event, occurrence or condition as constituting a material breach of this Contract shall not imply that any other, non-specified act, failure, refusal, omission, event, occurrence or condition shall be deemed not to constitute a material breach of this Contract.
3.1.5 The Contractor shall have a continuing duty to read, examine, review, compare and contrast each of the documents which make up this Contract, shop drawings, and other submittals.
Each of the documents is complementary and shall be interpreted so that what is called for by one shall be as binding as if called for by all. Should the Contractor observe any conflicts, ambiguity, errors or omissions within the documents, he shall, by written notice, bring them to the Owner’s and Architect’s attention for decision and revision as soon as possible after originally observed and before proceeding with the affected Work. In the event of duplication or conflicts between the documents after the Contract has been executed, the most expensive method of work, materials and equipment shall be construed as the requirement, with a credit for all costs saved accruing to the Owner in the event the least expensive method of work is directed. The express or implied approval by the Owner or the Architect of any shop drawings or other submittals shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor's compliance with this Contract. The Owner has requested the Architect to only prepare documents for the Project, including the plans and specifications for the Project, which are accurate, adequate, consistent, coordinated and sufficient for construction.
Walker County BOE Fixed Price Construction Contract (12.2009) 3
However, the Owner makes no representation or warranty of any nature whatsoever to the Contractor concerning such documents. The Contractor again hereby acknowledges and represents that it has received, reviewed and carefully examined such documents, believes them to be complete, accurate, adequate, consistent, coordinated and sufficient for construction, and that the Contractor has not, does not, and will not rely upon any representations or warranties by the Owner concerning such documents, as no such representations or warranties have been or are hereby made.
3.1.6 Plans are not intended to be scaled or to act as shop drawings.
3.1.7 In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this Contract, interpretation will be based on the following priority:
3.1.7.1 First, Addenda (if any), with those of later date having precedence over those of earlier date;
3.1.7.2 second, this Contract;
3.1.7.3 third, Supplemental or Special Conditions (if any);
3.1.7.4 fourth, the Specifications; and,
3.1.7.5 fifth, the Plans, with the following priority:
(a) As between figures given on plans and scaled measurements, the figures shall govern;
(b) As between large scale plans and small scale plans, the large scale plans shall govern.
3.1.8 Whenever an item is specified or shown on the plans by detail or reference, it shall be considered typical for other items which are obviously intended to be the same even though not so designated or specifically named but do serve the same function in the building.
3.1.9 Any material specified by reference to the number, symbol, or title of a specific standard such as a Commercial Standard, a Federal Specification, a trade association standard, or other similar standard, shall comply with the requirements in the latest revision thereof and any amendment or supplement thereto in effect on the date indicated on the specifications, except as limited, or modified in such references. The standards referred to, except as modified in the Contract, shall have full force and effect as though printed in the Contract. The Contractor shall make itself aware of the contents of such standards and shall furnish the field office with one (1) full set of each.
3.1.10 If Owner elects to accept any items proposed by the Contractor as a substitution, the Contractor shall assume full responsibility for the proper performance of any substitution to the criteria set forth in the Contract and assume the costs of any changes in the Work which may be due to such substitution.
3.1.11 When a word, term, or phrase is used in this Contract, it shall be interpreted or construed first, as defined herein; second, if not defined, according to its generally accepted meaning in the construction industry; and third, if there is no generally accepted meaning in the construction industry, according to its common and customary usage.
3.1.12 The words "include", "includes", or "including", as used in this Contract, shall be deemed to be followed by the phrase, "without limitation".
Walker County BOE Fixed Price Construction Contract (12.2009) 4
3.1.13 Wherever the terms “necessary”, “suitable”, “as directed”, “when directed”, “satisfactory”, “good and sufficient”, “approved”, or other general qualifying terms are used on the plans, they are deemed to be followed by the words “in the opinion of the Architect”, or “by the Architect”, as the case may be.
3.1.14 Unless otherwise stated, the terms “approval”, “approved”, “approved equal”, “or equal”, or “other approved”, are deemed to be followed by the words “in the opinion of the Architect”, or “by the Architect”, as the case may be.
3.1.15 If the Owner’s design professional for the Project is an engineer rather than an architect, then the term “Architect” as used throughout this Contract shall mean “Engineer”.
3.1.16 Unless otherwise stated, the term “day” means “calendar day” and the term “days” means “calendar days”.
3.1.17 “Work” means any and all labor, supervision, work, supplies, fixtures, appliances, furnishings, vehicles, equipment, services, facilities, tools, materials, computers, transportation, storage, power, fuel, heat, light, cooling, utilities, insurance, bonds, items, documents and things required by the Contract Documents to be performed, obtained, furnished, provided, or supplied by Contractor, including without limitation all construction, testing, and permitting required to render the Project, and every component thereof, operational and usable for its intended purposes.
3.2 Ownership. The documents which make up this Contract, and each of them, as well as any other documents furnished by the Owner, shall remain the property of the Owner. The Contractor shall have the right to keep one (1) copy of the Contract upon completion of the Project; provided, however, that in no event shall the Contractor use, or permit to be used, any portion or all of such Contract on other projects without the Owner's prior written authorization.
ARTICLE 4
CONTRACTOR'S PERFORMANCE
4.1 Generally. The Contractor shall perform all of the Work required, implied or reasonably inferable from this Contract including, but not limited to, the following:
4.1.1 Construction of the Project;
4.1.2 The furnishing of required surety bonds and insurance;
4.1.3 The provision, and prompt payment therefor, of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, fuel, heat, light, cooling, or other utilities, required for construction and all necessary building permits and other permits, licenses, fees and governmental inspections required for the construction of the Project; and,
4.1.4 The creation and submission to the Owner of detailed and comprehensive as-built drawings depicting all as-built construction. Said as-built drawings shall be submitted to the Owner upon Final Completion of the Project and receipt of same by the Owner shall be a condition precedent to final payment to the Contractor.
ARTICLE 5
TIME FOR CONTRACTOR'S PERFORMANCE
5.1 Time for Performance. The Contractor shall commence the performance of this Contract on the day the Contractor receives a written Notice to Proceed from the Architect or Owner, or such later date as may be set forth therein, and shall diligently continue its performance to and until Final
Walker County BOE Fixed Price Construction Contract (12.2009) 5
Completion of the Project. The Contractor shall accomplish Substantial Completion of the Project on or before ________________________________________________________. The time for achieving Substantial Completion may sometimes be referred to in the Contract Documents as the “Contract Time”.
5.2 Liquidated Damages for Delay. The Contractor shall pay the Owner for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the date set forth herein for Substantial Completion the sum indicated at Exhibit “B” attached hereto and by reference made a part hereof. Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the Owner.
When the Owner reasonably believes that Substantial Completion will be inexcusably delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
5.3 Substantial Completion. The term "Substantial Completion", as used herein, shall mean that point at which, as certified in writing by the Architect, the Project is at a level of completion in strict compliance with this Contract such that the Owner can enjoy beneficial use or occupancy and can use or operate it in all respects, for its intended purpose. Partial use or occupancy of the Project shall not result in the Project being deemed substantially complete, and such partial use or occupancy shall not be evidence of Substantial Completion.
5.4 Time Is Of The Essence. All limitations of time set forth herein are material and are of the essence of this Contract.
ARTICLE 6
FIXED PRICE AND CONTRACT PAYMENTS
6.1 Contract Price. The Owner shall pay, and the Contractor shall accept, as full and complete payment for the Contractor's timely performance of its obligations hereunder the fixed price of ______________________________________________________________________________ Dollars ($______________________). The price set forth in this Paragraph 6.1 shall constitute the Contract Price, which shall not be modified except by Change Order as provided in this Contract. The Contract Price includes the following Alternate(s), if any:
6.2 Schedule of Values. Within ten (10) calendar days of the effective date hereof, the
Contractor shall prepare and present to the Owner and the Architect the Contractor's Schedule of Values apportioning the Contract Price among the different elements of the Project for purposes of periodic and final payment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .