C505_R1_AD1.pdf

PDF 732 KB Posted

Attached to
Rossville Middle School Athletic Field and Concessions
Solicitation number
PE-55462-NONST-2025-000000010
Issued by
Wilcox County, Georgia

About this file

This engineering detail sheet (C505) from Southern A&E, LLC shows construction specifications for erosion control and drainage features at the Rossville Middle School New Field and Concessions project in Walker County, Georgia. The document includes detailed technical drawings and specifications for multiple erosion control measures including filter rings, stone check dams, storm drain outlet protection, temporary sediment traps, and HDPE anti-seep collars.

The drawings provide specific measurements, materials, and installation requirements for each erosion control feature. Key specifications include stone check dam requirements for drainage areas under two acres, sediment storage calculations for two temporary sediment traps totaling 330.5 cubic yards capacity, and detailed cross-sections showing proper installation of riprap, geotextile fabric, and other materials. The document is certified by Patrick Hallahan (Level II Certified Design Professional #0000066587) and was issued for construction on December 17, 2024 with Addendum 1 dated January 10, 2025.

View the file

Other files

File Type Posted
C106_R1_AD1.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
ADDENDUM_3_Complete.pdf PDF
ADDENDUM_1_complete.pdf PDF
E101_R1_AD2___CONCESSIONS___DUGOUT_BUILDINGS_.pdf PDF
U502_R1_AD1.pdf PDF
Bid Tabulation and Scoring Form.pdf PDF
Notice of Advertisement RMS Combo Field.docx DOCX document
A501_R1_AD1.pdf PDF
Contract Affidavit A.pdf PDF
C502_R1_AD1.pdf PDF
Bid Bond General Contractor.doc DOC document
C207_R1_AD1.pdf PDF
GC Compensation Proposal Form.doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Payment Bond GC.doc DOC document
Addendum 04_Complete.pdf PDF
U101_R1_AD1.pdf PDF
U101_R2_AD2.pdf PDF
Consent to Release Info (01_2014_GKM).doc DOC document
E002_R1_AD2___LIGHTING_FIXTURE___MECHANICAL_E.pdf PDF
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
ADDENDUM_2_complete.pdf PDF
RFP for General Contractor.docx DOCX document
Standard Form Fixed Price Contract.pdf PDF
C102_R1_AD1.pdf PDF
U502_R2_AD2.pdf PDF
Immigration and Security Form revised.pdf PDF
Performance Bond GC.doc DOC document
C104_R1_AD1.pdf PDF
C105_R1_AD1.pdf PDF
C107_R1_AD1.pdf PDF
E001_R1_AD2___ELECTRICAL_LEGENDS.pdf PDF
E003_R1_AD2___ELECTRICAL_SITE_PLAN.pdf PDF
GC Compensation Proposal Form.doc DOC document
Consent to Release Info (01_2014_GKM).doc DOC document
Performance Bond GC.doc DOC document
Payment Bond GC.doc DOC document
RFP for General Contractor.docx DOCX document
Notice of Advertisement RMS Combo Field.docx DOCX document
Immigration and Security Form revised.pdf PDF
Standard Form Fixed Price Contract.pdf PDF
Bid Bond General Contractor.doc DOC document
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Contract Affidavit A.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NUMBER

ISSUED FOR CONSTRUCTION

REVISIONS

COPYRIGHT 2024 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND

SHALL NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART

WITHOUT EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

C

12-17-2024

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

12" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

ROSSVILLE MIDDLE SCHOOL

NEW FIELD AND CONCESSIONS FOR:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

316 BULLDOG TRAIL, ROSSVILLE, GA 30741

746-0206

01-920-041

# Doc # Date

C505

ES & PC DETAILS

FILTER RING DETAILFr NOT TO SCALE

UPSTREAM TERMINAL TRANSVERSE CHECK SLOT DOWNSTREAM TERMINAL

1'-2" 6" 1'-2" 1'-0"9"

1'-0"

STEP 1: CUT TERMINAL SLOT. STEP 1: CUT TERMINAL SLOT.

STEP 1: CUT

CHECK SLOT.

15"

STEP 2: SNUG MAT INTO SLOT.

STEP 2: WORK UPSTREAM ACROSS

CHECK SLOT AND LAP BACK 15". STEP 2: STAKE MAT INTO SLOT

STEP 3:

A. STAKE MAT INTO SLOT.

B. USE 1" X 3" PRESSURE TREATED

BOARD TO SPACE MAT AGAINST

VERTICAL CUT.

C. BACKFILL AND COMPACT.

STEP 3: TUCK MAT LAP INTO SLOT

AND STAKE.

STEP 3: BACKFILL

TERMINAL SLOT.

STEP 4:

A. REVERSE MAT ROLL DIRECTION TO

OVERLAY CHECK SLOT.

B. STAKE MAT TO ANCHOR TERMINAL.

5'

15'-20'

STEP 4:

A. BACKFILL AND PROGRESS UPSTREAM

B. PULL OUT TEMPORARY STAKES WHEN

NO LONGER NEEDED FOR TENSIONING.

STEP 4:

A. ROLL MAT UPSTREAM OVER REFILLED

TERMINAL.

B. STAKE MAT DOWN TO ANCHOR TERMINAL.

C. PROGRESS UPSTREAM WITH ROLL.

6"

STAKE

9"

36"

PICTORAL VIEW OF TRANSVERSE SLOTSEQUENTIAL ROLL RUN OUT IN CHANNELS

ROLL #1

ROLL #3

ROLL #2

3"

5'

5'

3' OVERLAP

NOTES:

1. START AT DOWNSTREAM TERMINAL AND PROGRESS UPSTREAM.

2. FIRST ROLL IS CENTERED LONGITUDINALLY IN MID-CHANNEL

AND PINNED WITH TEMPORARY STAKES TO MAINTAIN

ALIGNMENT.

3. SUBSEQUENT ROLLS FOLLOW IN STAGGERED SEQUENCE BEHIND

THE FIRST ROLL. USE THE CENTER ROLL FOR ALIGNMENT TO

THE CHANNEL CENTER.

4. WORK OUTWARDS FROM THE CHANNEL CENTER TO THE EDGE.

5. USE 3" OVERLAPS AND STAKE AT 5' INTERVALS ALONG THE SEAMS.

6. USE 3' OVERLAPS AND SHINGLE DOWNSTREAM TO CONNECT

THE LINING AT THE ROLL ENDS.

NOT TO SCALE

SLOPE STABILIZATION DETAILSs

TOP OF OUTLET

STRUCTURE

FILTER FABRIC

(SECURELY WRAPPED)

AROUND EACH UNIT

1" DIM.@8"-10"

ON CENTER EACH WAY

3" - 4" STONE

OUTLET STRUCTURE

WEIR OR ORIFICE

(SIZE VARIES)

ONE HALF-ROUND PERFORATED BCCMP

1.5 TIMES DIAMETER OF OUTLET PIPE OR

WIDER THAN GREATEST WIDTH OR WEIR

(MINIMUM 36" DIAMETER)

1'-0"

RETROFITTING

NOT TO SCALE

PLAN VIEW

ELEVATION

Rt-P

Fr

1' -O

W

1'

-O

STORM DRAIN OUTLET PROTECTIONSt NOT TO SCALE

1'-0"

6xD

18"

30" 21" , 24"

W2

4'-3" 5'-3" 6'-5"

TABLE 1

DIAMETER

(D) 36" 42" , 48" 54"

7'-7" 10'-1" 11'-11"

W2DIAMETER

(D)

SE

E

TA

BL

E #1

STONE CHECK DAM

NOT TO SCALE

FLOW

GEOTEXTILE

A = THE TOE OF THE UPSTREAM CHECK DAM.

B = TOP OF THE DOWNSTREAM CHECK DAM.

L = THE DISTANCE SUCH THAT POINTS A AND B

ARE OF EQUAL ELEVATION.

2:1 OR FLATTER

TOP OF EX. BANK

STONE CHECK DAM

(2" - 10" STONE)

PROFILE VIEW

CROSS SECTION

NOTE:

1. CHECK DAMS ARE TO BE USED ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO

BE USED IN LIVE STREAMS).

2. THE DRAINAGE AREA FOR STONE CHECK DAMS SHALL NOT EXCEED TWO ACRES.

3. THE CENTER OF THE CHECK DAME MUST BE AT LEAST 9 INCHES LOWER THAN THE

OUTER EDGES.

4. THE DAM HEIGHT SHOULD BE A MAXIMUM OF 2 FEET FROM CENTER TO RIM EDGE.

5. THE SIDE SLOPES OF THE CHECK DAM SHALL NOT EXCEED A 2:1 SLOPE.

6. GEOTEXTILE SHALL BE USED TO PREVENT THE MITIGATION OF SUBGRADE SOIL

PARTICLES INTO THE STONES (REFER TO AASHTO M288-96, SECTION 7.3, TABLE 3).

LA B

MIN. 9"

GEOTEXTILE

24"

MAXIMUM

ATTACH ONE HALF-ROUND PIPE

TO STRUCTURE WITH 38" DIAM

EXPANSION BOLTS AT 12" O.C.

CERTIFIED PERSON:

PATRICK HALLAHAN

LEVEL II CERTIFIED

DESIGN PROFESSIONAL

CERTIFICATION #:

0000066587

ISSUED: 07/06/2021

EXPIRES: 07/06/2027

Cd 50# - 150#

SONE RIP-RAP

MIN. 2' HIGH

WEIR OR

OUTLET

OUTLET

STRUCTURE

MIN.

8' - 10'

SINGLE ROW

SILT FENCE

TYPE SENSITIVE

SINGLE ROW

SILT FENCE

TYPE SENSITIVE

RIP-RAP 75LB MIN.

WOVEN GEOSYNTHETIC-MIRAFI

FW402 OR EQUAL

HEADWALL

BLANKET AND MATTING CROSS-SECTIONS

50# - 150#

STONE RIP-RAP

MIN. 2' HIGH FILL AROUND BARRIER

WITH 3" - 4" STONE

(EVEN WITH TOP)

FLOW

1.0' MIN.

GRADED STONE

MIN.

8' - 10'

FLOW

FLOW

FLOW

GEOTEXTILE

2:1 OR FLATTER

STONE CHECK DAM

(2" - 10" STONE)

NOTE:

1. INSTALL JUTE MESH ALONG THE DITCH/CHANNEL AND OVER THE CHECK DAM

STAKING IT IN PLACE. INSTALL TO THE EXTENTS INDICATION ON THE PLANS.

2. FLOCCULANTS (GEL BLOCKS) SHALL BE INSTALLED PER MANUFACTURER

RECOMMENDATION INCLUDING THE QUANTITY OF BLOCKS TO BE USED. GEL BLOCKS

SHALL BE REPLACED AS NEEDED. REFER TO SPECIFICATION SECTION 31 10 19.

2"X2" WOODEN

STAKE

FLOCCULANTS (GEL BLOCKS)

STAKED UPSTREAM

OF CHECK DAM

JUTE MESH MATTING

JUTE MESH

MATTING

NOT TO SCALEFl-Co FLOCCULANTS @ STONE CHECK DAM

STONE CHECK DAM

(2" - 10" STONE)

FLOW

TOP OF CHECK DAM

FLOCCULANTS (GEL BLOCKS)

STAKED UPSTREAM

OF CHECK DAM

2"X2" WOODEN

STAKE

JUTE MESH

MATTING

SIDE SLOPE

R

EF

ER

T

O P

LA

N

FO

R

W

ID

TH

SIDE SLOPE

JUTE MESH

MATTING

APPLY POWDERED

FLOCCULANTS TO

THE JUTE MESH.

APPLY POWDERED

FLOCCULANTS TO

THE JUTE MESH.

EXCAVATED MATERIAL WILL INCREASE

STORAGE VOLUME AND PROVIDE FILL

MATERIAL

RECOMMENDED MINIMUM RATIO OF

LENGTH-TO-WIDTH (L:W) IS 2:1

FLOW

FIRMLY "KEY EMBANKMENT

INTO NATURAL GROUND

TOP OF BERM

MINIMUM TOP WIDTH IS 3'

MAXIMUM SLOPES 2:1

EMERGENCY SPILLWAY

(MIN. DEPTH = 1.5')

SEE APPENDIX C FOR STONE SIZING

MINIMUM DISTANCE 1.5' TO SPILLWAY INVERT

MAXIMUM DEPTH

(67 CUBIC YARDS PER ACRE)

ADDITIONAL VOLUME FOR

SILT STORAGE (OPTIONAL)

RIP-RAP

GEOTEXTILE FABRIC

(KEYED INTO GROUNG)

MAXIMUM SLOPE 2:1

TYPICAL RIP-RAP DEPTH FOR

OVERFLOW WEIR = 2 FEET

NATURAL GROUND

COMPACT FILL IN MAXIMUM

6" LAYERS

GEOTEXTILE FABRIC BETWEEN

SOIL AND RIP-RAP

MAXIMUM SLOPE 2:1

TEMPORARY SEDIMENT TRAP #2

NOT TO SCALE

CROSS SECTION

Sd4-C

PROFILE THROUGH EMBANKMENT

ROCK OUTLET

3.0' DEEP

5.5' MIN.

SPILLWAY WIDTH

5.5' MAX

TYPICAL WIDTH = 3' FEET

MINIMUM TOP WIDTH = EMBANKEMENT

HEIGHT (3 FOOT MINIMUM)

PHASE I SEDIMENT STORAGE CALCULATIONS:

PHASE I SEDIMENT STORAGE :

SEE PLA

N

SEE PLAN

SEE PLAN

EXCAVATED MATERIAL WILL INCREASE

STORAGE VOLUME AND PROVIDE FILL

MATERIAL

RECOMMENDED MINIMUM RATIO OF

LENGTH-TO-WIDTH (L:W) IS 2:1

FLOW

FIRMLY "KEY EMBANKMENT

INTO NATURAL GROUND

TOP OF BERM

MINIMUM TOP WIDTH IS 3'

MAXIMUM SLOPES 2:1

EMERGENCY SPILLWAY

(MIN. DEPTH = 1.5')

SEE APPENDIX C FOR STONE SIZING

MINIMUM DISTANCE 1.5' TO SPILLWAY INVERT

MAXIMUM DEPTH

(67 CUBIC YARDS PER ACRE)

ADDITIONAL VOLUME FOR

SILT STORAGE (OPTIONAL)

RIP-RAP

GEOTEXTILE FABRIC

(KEYED INTO GROUNG)

MAXIMUM SLOPE 2:1

TYPICAL RIP-RAP DEPTH FOR

OVERFLOW WEIR = 2 FEET

NATURAL GROUND

COMPACT FILL IN MAXIMUM

6" LAYERS

GEOTEXTILE FABRIC BETWEEN

SOIL AND RIP-RAP

MAXIMUM SLOPE 2:1

TEMPORARY SEDIMENT TRAP #1

NOT TO SCALE

CROSS SECTION

Sd4-C

PROFILE THROUGH EMBANKMENT

ROCK OUTLET

3.0' DEEP

5.5' MIN.

SPILLWAY WIDTH

5.5' MAX

TYPICAL WIDTH = 3' FEET

MINIMUM TOP WIDTH = EMBANKEMENT

HEIGHT (3 FOOT MINIMUM)

PHASE 1 DISTURBED AREA & SEDIMENT STORAGE REQUIREMENTS

REQUIREMENTS: 5.20 ACRES X 67 = 349 CUBIC YARDS

DISTURBED AREA TRAP #1: 2.07 AC - PROVIDED: 214.5 CY

DISTURBED AREA TRAP #2: 1.53 AC - PROVIDED: 116 CY

TOTAL 3.60 AC 330.5 CY

PHASE I SEDIMENT STORAGE CALCULATIONS:

PHASE I SEDIMENT STORAGE :

SEE PLA

N

SEE PLAN

SEE PLAN

PHASE 1 DISTURBED AREA & SEDIMENT STORAGE REQUIREMENTS

REQUIREMENTS: 5.20 ACRES X 67 = 349 CUBIC YARDS

DISTURBED AREA TRAP #1: 2.07 AC - PROVIDED: 214.5 CY

DISTURBED AREA TRAP #2: 1.53 AC - PROVIDED: 116 CY

TOTAL 3.60 AC 330.5 CY

3' -0

6'-0"

FRONT ELEVATION OF

UNASSEMBLED COLLAR

18" TO

42" PIPE

HDPE ANTI-SEEP

COLLAR

HOLES FOR STAINLESS

STEEL BOLTS

HOLES FOR STAINLESS

STEEL BOLTS

S.S. BAND

& COLLAR

S.S. BAND

INSTALLATION NOTES:

EACH COLLAR SHALL BE FURNISHED WITH STAINLESS STEEL

BOLTS FOR CONNECTING TWO HALVES AND STAINLESS

STEEL BAND FOR CONNECTING COLLARS TO PIPE.

APPLY MASTIC TO TOP AND BOTTOM HALVES OF COLLAR

PRIOR TO BOLTING TWO HALVES TOGETHER. APPLY MASTIC

AS NEEDED FOR A GOOD SEAL. BACKFILL AND HAND TAMP.

6' HDPE ANTI-SEEP COLLAR

1/4" THICK HDPE

3' -0

1 AD1 01-10-2025

File details come from the government source that posted it. Updated .