Bid Tabulation and Scoring Form.pdf

PDF 1 MB Posted

Attached to
Rossville Middle School Athletic Field and Concessions
Solicitation number
PE-55462-NONST-2025-000000010
Issued by
Wilcox County, Georgia

About this file

This is a bid tabulation and scoring form from Southern A&E LLC for Walker County Schools' New Field and Concessions project at Rossville Middle School (Project #01-920-041) dated January 23, 2025. The document shows five contractors submitted bids: Tyson, Integrated, RKR, Smith Built, and Pillar. Base bids ranged from $3,092,000 to $3,239,000, with completion times varying from 130 to 259 days. The bids were evaluated based on multiple criteria including bid security, O.C.G.A. compliance, proposal forms, and acknowledgment of addenda.

The scoring summary shows RKR received the highest total score of 289.49 (96.16 average) and was ranked first, followed by Smith Built with 283.76 points (94.59 average), Tyson with 260.19 points (86.73 average), and Integrated with 185.72 points (61.92 average). Pillar's scoring was not included in the final evaluation. Additional pricing notes included deductions and additions for items such as field turf ($70,000 deduct), double pump ($75,000 add), silt film ($6,000 add), and astro turf diamond ($145,000 add). The evaluation committee consisted of three members who individually scored each proposal, with their scores certified by Mike Waldbillig, CEO.

View the file

Other files

File Type Posted
C106_R1_AD1.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
ADDENDUM_3_Complete.pdf PDF
ADDENDUM_1_complete.pdf PDF
E101_R1_AD2___CONCESSIONS___DUGOUT_BUILDINGS_.pdf PDF
U502_R1_AD1.pdf PDF
Notice of Advertisement RMS Combo Field.docx DOCX document
A501_R1_AD1.pdf PDF
Contract Affidavit A.pdf PDF
C502_R1_AD1.pdf PDF
Bid Bond General Contractor.doc DOC document
C207_R1_AD1.pdf PDF
GC Compensation Proposal Form.doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Payment Bond GC.doc DOC document
Addendum 04_Complete.pdf PDF
U101_R1_AD1.pdf PDF
U101_R2_AD2.pdf PDF
Consent to Release Info (01_2014_GKM).doc DOC document
E002_R1_AD2___LIGHTING_FIXTURE___MECHANICAL_E.pdf PDF
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
C505_R1_AD1.pdf PDF
ADDENDUM_2_complete.pdf PDF
RFP for General Contractor.docx DOCX document
Standard Form Fixed Price Contract.pdf PDF
C102_R1_AD1.pdf PDF
U502_R2_AD2.pdf PDF
Immigration and Security Form revised.pdf PDF
Performance Bond GC.doc DOC document
C104_R1_AD1.pdf PDF
C105_R1_AD1.pdf PDF
C107_R1_AD1.pdf PDF
E001_R1_AD2___ELECTRICAL_LEGENDS.pdf PDF
E003_R1_AD2___ELECTRICAL_SITE_PLAN.pdf PDF
GC Compensation Proposal Form.doc DOC document
Consent to Release Info (01_2014_GKM).doc DOC document
Performance Bond GC.doc DOC document
Payment Bond GC.doc DOC document
RFP for General Contractor.docx DOCX document
Notice of Advertisement RMS Combo Field.docx DOCX document
Immigration and Security Form revised.pdf PDF
Standard Form Fixed Price Contract.pdf PDF
Bid Bond General Contractor.doc DOC document
AffidavitOfNoncollusion_Offeror_(01_2014_GKM).doc DOC document
01920041_Final_BidSet_Plans_12_17_2024.pdf PDF
Contract Affidavit A.pdf PDF
01920041_Final_Spec_Manual_12_17_2024.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .