Drawings proj 554-23-103.pdf

PDF 1 MB Posted

Attached to
Z2DA--554-23-103 Replace OR Booms (VA-23-00012203)
Solicitation number
36C25923R0033
Issued by

About this file

This document package includes construction drawings and specifications for replacing operating room booms at the Rocky Mountain Regional Veterans Affairs Medical Center in Aurora, Colorado, as well as the related federal contract opportunity posted on SAM.gov.

The construction drawings provide the design and layout details for replacing the OR booms in multiple operating rooms and related medical procedure rooms on the third floor of Buildings D and F. The general notes specify the contractor's responsibilities to provide all required equipment, labor, materials, and engineering to fully install the new booms. The contractor must ensure the work meets manufacturer, VA, and code requirements and is completed during off hours as needed. The solicitation on SAM.gov for this project is numbered 36C25923R0033 with an opportunity description of "554-23-103 Replace OR Booms." It is being issued by the Department of Veterans Affairs Veterans Health Administration VISN 19.

View the file

Other files

File Type Posted
36C25923R0033 0006.docx DOCX document
OR Isolation Panels - Project 554-23-103 Replace OR Booms.pdf PDF
attendance 1 of 2 Feb 24 2023.pdf PDF
36C25923R0033 0005.docx DOCX document
attendance 2 of 2 Feb 24 2023.pdf PDF
Site Visit 2 Meeting Doc.docx DOCX document
03 Lighting.pdf PDF
03 Power.pdf PDF
36C25923R0033 0004.docx DOCX document
03 Equip and Lighting Mounting.pdf PDF
03 Structural Steel.pdf PDF
03 Plumb Med Gas.pdf PDF
03 Equipment.pdf PDF
03 HVAC mechanical.pdf PDF
03-03 Room Elevations.pdf PDF
03 Reflected Ceiling Plans.pdf PDF
36C25923R0033 0003.docx DOCX document
36C25923R0033 0002.docx DOCX document
Site Visit Meeting Doc.docx DOCX document
attendance 1 of 2.pdf PDF
SOW r2 proj 554-23-103 Replace OR Booms.docx DOCX document
attendance 2 of 2.pdf PDF
03_DAT_Med Equip Support Steel_Unistrut_As-Builts - opt.pdf PDF
36C25923R0033 0001.docx DOCX document
Wage Determination CO20230015 1 13 2023.pdf PDF
36C25923R0033_1.docx DOCX document
SPECS proj 554-23-103 Replace OR Booms.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION DRAWINGS

PROJECT NUMBER:

554-23-103

PROJECT TITLE:

Replace OR Booms

PROJECT LOCATION:

Rocky Mountain Regional Veterans Affairs Medical Center

1700 N. Wheeling St., Aurora, CO 80045

DATE:

September 29, 2022

LIST OF DRAWINGS

Drawing

Page No. Title

1. G1 Title Page, Site Map, General Notes, List of Drawings

2. A1 Partial Level 3 Floor Plan north

3. A2 Partial Level 3 Floor Plan south

GENERAL NOTES:

1. The Contractor shall provide all equipment, engineering, labor, tools, supervision, and materials required to provide and to install new booms in the Operating Rooms Suite and related medical procedures rooms in the Level 3 of building 3 (Bldg. D/F). Work may also be required in the Level 3 Interstitial Space.

2. All Contractor provided and installed systems shall be complete, functional, field tested, and conform to equipment manufacturer's recommendations, VA specifications, and federal, state, and local codes.

3. All piping and electrical work in finished rooms shall be concealed above ceilings or within walls.

4. Fire caulk to maintain fire rating of all penetrations.

5. Prior to bid preparation, the Contractor shall field verify all required new structural supports, piping and electrical conduit and fittings. The Level 3 Interstitial Space is congested with piping, conduit, duct, and equipment.

6. The Contractor may utilize existing supports to hang new equipment where available.

The Contractor shall provide new supports where needed.

7. The Contractor may utilize existing floor penetrations where available. The Contractor shall concrete core drill new openings where needed. Minimum hole diameter is 2 inches.

8. Restore any disturbed walls, floors, or surfaces to original condition.

9. Some construction operation such as those which produce noise and vibration or construction operations or that require the shut down of an electrical panel for tie in may be required to be performed outside of normal working hours, specifically early mornings, late afternoons, or weekends. Coordinate with the Contracting Officers Representative.

10. Follow NEC and NFPA 70E requirements and guidelines for electrical work.

11. Protect all existing furnishings, fixtures, and equipment: HVAC, PA system, lighting, fire protection, electrical conduit, etc.

12. Provide ICRA class 1 protection for work performed in the interstitial space. Provide ICRA class 3, or higher if needed, protection in all other spaces.

13. Scrubs are required for entry into some of the work areas.

Buildings Legend

· Building A (10) South Clinic

· Building B (2) Research

· Building C (1) Concourse

· Building D (3) Diagnostic & Treatment S

· Building E (9) Central Clinic

· Building F (3) Diagnostic & Treatment N

· Building G (8) North Clinic

· Building H (4) Inpatient South

· Building K (5) Inpatient North

· Building L (6) Energy Center

Parking Lots

· PVS (13) Parking Visitors South

· PVN (12) Parking Visitors North

· PSN (11) Parking Staff North

L O

C A

T

IO

N

R o ck y

M o u nt a in

R eg io na l V et e ra n s A ff a ir s

M e di ca l C en te r

N W h ee lin g

S t

A ur or a

, C O

P R

O J

E C

T T

IT

L

E

R e p la ce O

R B o om s P

R O

JE

C

T N

U M

B E

R

-2

-1

D R

A W

IN

G

T

IT

L E

T itl e

P ag e

D ra w in g s

Li st

P ro je ct L o ca tio n

, N ot es P

A G

E

D A

T E

S e pt

D R

A W

IN

G

N U

M B

E R

G

S C

A L

E

N T

S P

A P

E R

S

IZ

E

A N

S I B

D R

A W

N

S P

M

PARTIAL LEVEL 3 FLOOR PLAN

FE-S01

ELEV

03-03-SE9

03-03-G3-0203-03-F3-0403-03-E3-02

F3-228

OR 1

03-03-D3-05

F3-287

OR 5

03-03-G2-04

03-03-F3-01

CLEAN CORE

F3-236

OR STOR

03-03-F4-01A

F3-242

STERILE SUPPLY

STOR

03-03-F3-03 F3-234

STERILE SUPPLY

STOR

03-03-E3-01

F3-248

STERILE SUPPLY

STOR

03-03-G3-01

03-03-G2-05

STERILE SUPPLY

STOR

03-03-G2-01

INSTR

PREP/STOR

F3-226

SCRUB

03-03-D4-03

F3-232

SCRUB

03-03-E4-02

F3-240

SCRUB

03-03-F4-03

F3-246

SCRUB

03-03-G4-02

F3-289

SCRUB

03-03-G2-02

F3-224

GURNEY ALCOVE

03-03-D4-02

F3-230

GURNEY ALCOVE

03-03-E4-01

F3-238

GURNEY ALCOVE

03-03-F4-02

F3-244

GURNEY ALCOVE

03-03-G4-01

F3-291

GURNEY ALCOVE

03-03-G2-03

F3-321

STERILE SUPPLY

STOR

03-03-D3-02

F3-263

STOR. ALCOVE

03-03-H2-01

F3-261

LINEN

F3-259

STOR

03-03-H2-03

F3-270

HAC

03-03-D3-03

F3-268

EQUIP STOR

03-03-D3-04

F3-266

VENDOR STOR

03-03-D4-01

F3-255

STAFF TLT

03-03-H3-02

F3-253

OR EDUCATOR

03-03-H4-01

F3-257

SUBSTERILE

03-03-H3-01

F3-275

CVOR (OR 7)

03-03-D2-04 F3-283

OR 6

03-03-F2-01

03-03-E3-03

STERILE SUPPLY

STOR

03-03-F3-02

CLEAN CART

RECEIV.

F3-277

SCRUB

03-03-D2-01 F3-279

GURNEY ALCOVE

03-03-E2-02F3-273

GURNEY ALCOVE

03-03-E2-01

03-03-D3-01

STERILE SUPPLY

STOR

F3-275A

SYSTEM

COMPONENT

03-03-D2-03

F3-275C

PUMP RM

03-03-E2-03

F3-275D

CONTROL

03-03-E2-04

F3-281

SCRUB

03-03-E2-05

F3-285

STOR

03-03-F2-02

F3-C13

CORRIDOR

03-03-F1-02

F3-275B

CVOR EQUIP

03-03-D2-02

F3-C07

F3-272

CHARGE NURSE

03-03-F2-03

F3-C03

CORRIDOR

03-03-F4-06

F3-C10

CORRIDOR

03-03-H3-07

03-03-F4-01B

STOR

F3-234

OR 2

F3-242

OR 3

F3-248

OR 4

L O

C A

T

IO

N

R o ck y

M o u nt a in

R eg io na l V et e ra n s A ff a ir s

M e di ca l C en te r

N W h ee lin g

S t

A ur o ra

, C O

P R

O J

E C

T T

IT

L

E

R e p la ce O

R B o om s P

R O

JE

C

T N

U M

B E

R

-2

-1

D R

A W

IN

G

T

IT

L E

P ar tia l L e ve l 3

F lo or P la n

P A

G E

D

A T e pt

Building 3 (D and F)

D R

A W

IN

G

N U

M B

E R

A

S C

A L

E

/3

'-0

P A

P E

R S

IZ

E

A

N S

I B D

R A

W N

S

PARTIAL LEVEL 3 FLOOR PLAN

D3-202

DATA /

TELECOMM

03-03-D10-T4

D3-204

ELEC

03-03-D10-E6

D3-229

1 MINOR

PROCEDURE

03-03-D9-04

D3-231

03-03-D9-05

D3-233

03-03-E9-04

D3-239

EGD/COLON

03-03-E9-08

D3-241

EGD/COLON

03-03-F9-03

D3-243

EGD/COLON

03-03-F9-04

D3-245

EGD/COLON

03-03-G9-04

03-03-E10-01

DIGESTIVE

DISEASES CORE

D3-214

CLEAN SCOPE

STOR

03-03-G10-03

D3-227

SCOPE CLEAN UP

03-03-G10-02

D3-212

ERCP 1

03-03-F10-03

D3-206

BRONCHOSCOPY

03-03-E10-02

D3-208

ERCP 2

03-03-E10-03

D3-110

R/F CONTROL

03-03-F10-02

D3-223

CLEAN UTIL

03-03-F10-01D3-216

OR

COORDINATORS

03-03-D10-01

D3-242

LINEN CLOS

03-03-F9-02

D3-221

CRASH CART

ALCOVE

03-03-E10-06

D3-225

CLEAN SCOPE

STOR

03-03-G10-01

03-03-D10-02

OR SCHEDULER

D3-220

COPY/FAX

03-03-E9-07

D3-218

MED PREP

03-03-E9-06

D3-237

NURSE STATION

03-03-E9-05

D3-217

CRASH CART

ALCOVE

03-03-E10-04 03-03-E10-05

STOR

D3-C07

CORRIDOR

03-03-E9-09

03-03-E10-01A

DIGESTIVE

DISEASES CORE

D3-C02

CORRIDOR

03-03-E10-07

2 MINOR

PROCEDURE

3 MINOR

PROCEDURE

G.I. 1 G.I. 2 G.I. 3 G.I. 4

G.I. 5

ERCP

L O

C A

T

IO

N

R o ck y

M o u nt a in

R eg io na l V et e ra n s A ff a ir s

M e di ca l C en te r

N W h ee lin g

S t

A ur o ra

, C O

P R

O J

E C

T T

IT

L

E

R e p la ce O

R B o om s P

R O

JE

C

T N

U M

B E

R

-2

-1

D R

A W

IN

G

T

IT

L E

P ar tia l L e ve l 3

F lo or P la n

P A

G E

D

A T e pt

.2

Building 3 (D and F)

D R

A W

IN

G

N U

M B

E R

A

S C

A L

E

/8

'-0

P

A P

E R

S

IZ

E

A N

S I B

D R

A W

N

S

pg 1
pg 2
pg 3

File details come from the government source that posted it. Updated .