Drawings proj 554-23-103.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25923R0033
About this file
This document package includes construction drawings and specifications for replacing operating room booms at the Rocky Mountain Regional Veterans Affairs Medical Center in Aurora, Colorado, as well as the related federal contract opportunity posted on SAM.gov.
The construction drawings provide the design and layout details for replacing the OR booms in multiple operating rooms and related medical procedure rooms on the third floor of Buildings D and F. The general notes specify the contractor's responsibilities to provide all required equipment, labor, materials, and engineering to fully install the new booms. The contractor must ensure the work meets manufacturer, VA, and code requirements and is completed during off hours as needed. The solicitation on SAM.gov for this project is numbered 36C25923R0033 with an opportunity description of "554-23-103 Replace OR Booms." It is being issued by the Department of Veterans Affairs Veterans Health Administration VISN 19.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION DRAWINGS
PROJECT NUMBER:
554-23-103
PROJECT TITLE:
Replace OR Booms
PROJECT LOCATION:
Rocky Mountain Regional Veterans Affairs Medical Center
1700 N. Wheeling St., Aurora, CO 80045
DATE:
September 29, 2022
LIST OF DRAWINGS
Drawing
Page No. Title
1. G1 Title Page, Site Map, General Notes, List of Drawings
2. A1 Partial Level 3 Floor Plan north
3. A2 Partial Level 3 Floor Plan south
GENERAL NOTES:
1. The Contractor shall provide all equipment, engineering, labor, tools, supervision, and materials required to provide and to install new booms in the Operating Rooms Suite and related medical procedures rooms in the Level 3 of building 3 (Bldg. D/F). Work may also be required in the Level 3 Interstitial Space.
2. All Contractor provided and installed systems shall be complete, functional, field tested, and conform to equipment manufacturer's recommendations, VA specifications, and federal, state, and local codes.
3. All piping and electrical work in finished rooms shall be concealed above ceilings or within walls.
4. Fire caulk to maintain fire rating of all penetrations.
5. Prior to bid preparation, the Contractor shall field verify all required new structural supports, piping and electrical conduit and fittings. The Level 3 Interstitial Space is congested with piping, conduit, duct, and equipment.
6. The Contractor may utilize existing supports to hang new equipment where available.
The Contractor shall provide new supports where needed.
7. The Contractor may utilize existing floor penetrations where available. The Contractor shall concrete core drill new openings where needed. Minimum hole diameter is 2 inches.
8. Restore any disturbed walls, floors, or surfaces to original condition.
9. Some construction operation such as those which produce noise and vibration or construction operations or that require the shut down of an electrical panel for tie in may be required to be performed outside of normal working hours, specifically early mornings, late afternoons, or weekends. Coordinate with the Contracting Officers Representative.
10. Follow NEC and NFPA 70E requirements and guidelines for electrical work.
11. Protect all existing furnishings, fixtures, and equipment: HVAC, PA system, lighting, fire protection, electrical conduit, etc.
12. Provide ICRA class 1 protection for work performed in the interstitial space. Provide ICRA class 3, or higher if needed, protection in all other spaces.
13. Scrubs are required for entry into some of the work areas.
Buildings Legend
· Building A (10) South Clinic
· Building B (2) Research
· Building C (1) Concourse
· Building D (3) Diagnostic & Treatment S
· Building E (9) Central Clinic
· Building F (3) Diagnostic & Treatment N
· Building G (8) North Clinic
· Building H (4) Inpatient South
· Building K (5) Inpatient North
· Building L (6) Energy Center
Parking Lots
· PVS (13) Parking Visitors South
· PVN (12) Parking Visitors North
· PSN (11) Parking Staff North
L O
C A
T
IO
N
R o ck y
M o u nt a in
R eg io na l V et e ra n s A ff a ir s
M e di ca l C en te r
N W h ee lin g
S t
A ur or a
, C O
P R
O J
E C
T T
IT
L
E
R e p la ce O
R B o om s P
R O
JE
C
T N
U M
B E
R
-2
-1
D R
A W
IN
G
T
IT
L E
T itl e
P ag e
D ra w in g s
Li st
P ro je ct L o ca tio n
, N ot es P
A G
E
D A
T E
S e pt
D R
A W
IN
G
N U
M B
E R
G
S C
A L
E
N T
S P
A P
E R
S
IZ
E
A N
S I B
D R
A W
N
S P
M
PARTIAL LEVEL 3 FLOOR PLAN
FE-S01
ELEV
03-03-SE9
03-03-G3-0203-03-F3-0403-03-E3-02
F3-228
OR 1
03-03-D3-05
F3-287
OR 5
03-03-G2-04
03-03-F3-01
CLEAN CORE
F3-236
OR STOR
03-03-F4-01A
F3-242
STERILE SUPPLY
STOR
03-03-F3-03 F3-234
STERILE SUPPLY
STOR
03-03-E3-01
F3-248
STERILE SUPPLY
STOR
03-03-G3-01
03-03-G2-05
STERILE SUPPLY
STOR
03-03-G2-01
INSTR
PREP/STOR
F3-226
SCRUB
03-03-D4-03
F3-232
SCRUB
03-03-E4-02
F3-240
SCRUB
03-03-F4-03
F3-246
SCRUB
03-03-G4-02
F3-289
SCRUB
03-03-G2-02
F3-224
GURNEY ALCOVE
03-03-D4-02
F3-230
GURNEY ALCOVE
03-03-E4-01
F3-238
GURNEY ALCOVE
03-03-F4-02
F3-244
GURNEY ALCOVE
03-03-G4-01
F3-291
GURNEY ALCOVE
03-03-G2-03
F3-321
STERILE SUPPLY
STOR
03-03-D3-02
F3-263
STOR. ALCOVE
03-03-H2-01
F3-261
LINEN
F3-259
STOR
03-03-H2-03
F3-270
HAC
03-03-D3-03
F3-268
EQUIP STOR
03-03-D3-04
F3-266
VENDOR STOR
03-03-D4-01
F3-255
STAFF TLT
03-03-H3-02
F3-253
OR EDUCATOR
03-03-H4-01
F3-257
SUBSTERILE
03-03-H3-01
F3-275
CVOR (OR 7)
03-03-D2-04 F3-283
OR 6
03-03-F2-01
03-03-E3-03
STERILE SUPPLY
STOR
03-03-F3-02
CLEAN CART
RECEIV.
F3-277
SCRUB
03-03-D2-01 F3-279
GURNEY ALCOVE
03-03-E2-02F3-273
GURNEY ALCOVE
03-03-E2-01
03-03-D3-01
STERILE SUPPLY
STOR
F3-275A
SYSTEM
COMPONENT
03-03-D2-03
F3-275C
PUMP RM
03-03-E2-03
F3-275D
CONTROL
03-03-E2-04
F3-281
SCRUB
03-03-E2-05
F3-285
STOR
03-03-F2-02
F3-C13
CORRIDOR
03-03-F1-02
F3-275B
CVOR EQUIP
03-03-D2-02
F3-C07
F3-272
CHARGE NURSE
03-03-F2-03
F3-C03
CORRIDOR
03-03-F4-06
F3-C10
CORRIDOR
03-03-H3-07
03-03-F4-01B
STOR
F3-234
OR 2
F3-242
OR 3
F3-248
OR 4
L O
C A
T
IO
N
R o ck y
M o u nt a in
R eg io na l V et e ra n s A ff a ir s
M e di ca l C en te r
N W h ee lin g
S t
A ur o ra
, C O
P R
O J
E C
T T
IT
L
E
R e p la ce O
R B o om s P
R O
JE
C
T N
U M
B E
R
-2
-1
D R
A W
IN
G
T
IT
L E
P ar tia l L e ve l 3
F lo or P la n
P A
G E
D
A T e pt
Building 3 (D and F)
D R
A W
IN
G
N U
M B
E R
A
S C
A L
E
/3
'-0
P A
P E
R S
IZ
E
A
N S
I B D
R A
W N
S
PARTIAL LEVEL 3 FLOOR PLAN
D3-202
DATA /
TELECOMM
03-03-D10-T4
D3-204
ELEC
03-03-D10-E6
D3-229
1 MINOR
PROCEDURE
03-03-D9-04
D3-231
03-03-D9-05
D3-233
03-03-E9-04
D3-239
EGD/COLON
03-03-E9-08
D3-241
EGD/COLON
03-03-F9-03
D3-243
EGD/COLON
03-03-F9-04
D3-245
EGD/COLON
03-03-G9-04
03-03-E10-01
DIGESTIVE
DISEASES CORE
D3-214
CLEAN SCOPE
STOR
03-03-G10-03
D3-227
SCOPE CLEAN UP
03-03-G10-02
D3-212
ERCP 1
03-03-F10-03
D3-206
BRONCHOSCOPY
03-03-E10-02
D3-208
ERCP 2
03-03-E10-03
D3-110
R/F CONTROL
03-03-F10-02
D3-223
CLEAN UTIL
03-03-F10-01D3-216
OR
COORDINATORS
03-03-D10-01
D3-242
LINEN CLOS
03-03-F9-02
D3-221
CRASH CART
ALCOVE
03-03-E10-06
D3-225
CLEAN SCOPE
STOR
03-03-G10-01
03-03-D10-02
OR SCHEDULER
D3-220
COPY/FAX
03-03-E9-07
D3-218
MED PREP
03-03-E9-06
D3-237
NURSE STATION
03-03-E9-05
D3-217
CRASH CART
ALCOVE
03-03-E10-04 03-03-E10-05
STOR
D3-C07
CORRIDOR
03-03-E9-09
03-03-E10-01A
DIGESTIVE
DISEASES CORE
D3-C02
CORRIDOR
03-03-E10-07
2 MINOR
PROCEDURE
3 MINOR
PROCEDURE
G.I. 1 G.I. 2 G.I. 3 G.I. 4
G.I. 5
ERCP
L O
C A
T
IO
N
R o ck y
M o u nt a in
R eg io na l V et e ra n s A ff a ir s
M e di ca l C en te r
N W h ee lin g
S t
A ur o ra
, C O
P R
O J
E C
T T
IT
L
E
R e p la ce O
R B o om s P
R O
JE
C
T N
U M
B E
R
-2
-1
D R
A W
IN
G
T
IT
L E
P ar tia l L e ve l 3
F lo or P la n
P A
G E
D
A T e pt
.2
Building 3 (D and F)
D R
A W
IN
G
N U
M B
E R
A
S C
A L
E
/8
'-0
P
A P
E R
S
IZ
E
A N
S I B
D R
A W
N
S
| pg 1 |
| pg 2 |
| pg 3 |
File details come from the government source that posted it. Updated .