Site Visit 2 Meeting Doc.docx

DOCX document 19 KB Posted

Attached to
Z2DA--554-23-103 Replace OR Booms (VA-23-00012203)
Solicitation number
36C25923R0033
Issued by

About this file

This document provides details for a pre-bid meeting for federal contract number 554-23-103 to replace operating and procedure room booms at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The contractor will remove seventeen existing light and equipment booms and replace them. Bids are due by March 6, 2023. The pre-bid meeting site visit is not mandatory but questions must be submitted in writing. The estimated value of the contract is between $2-5 million and bonds are required. The contractor must begin work within 10 days of the Notice to Proceed and complete within 365 days, and must comply with Davis-Bacon wage determinations by submitting certified payrolls with invoices.

View the file

Other files

File Type Posted
36C25923R0033 0006.docx DOCX document
OR Isolation Panels - Project 554-23-103 Replace OR Booms.pdf PDF
attendance 1 of 2 Feb 24 2023.pdf PDF
36C25923R0033 0005.docx DOCX document
attendance 2 of 2 Feb 24 2023.pdf PDF
03 Lighting.pdf PDF
03 Power.pdf PDF
36C25923R0033 0004.docx DOCX document
03 Equip and Lighting Mounting.pdf PDF
03 Structural Steel.pdf PDF
03 Plumb Med Gas.pdf PDF
03 Equipment.pdf PDF
03 HVAC mechanical.pdf PDF
03-03 Room Elevations.pdf PDF
03 Reflected Ceiling Plans.pdf PDF
36C25923R0033 0003.docx DOCX document
36C25923R0033 0002.docx DOCX document
Site Visit Meeting Doc.docx DOCX document
attendance 1 of 2.pdf PDF
SOW r2 proj 554-23-103 Replace OR Booms.docx DOCX document
attendance 2 of 2.pdf PDF
03_DAT_Med Equip Support Steel_Unistrut_As-Builts - opt.pdf PDF
36C25923R0033 0001.docx DOCX document
Wage Determination CO20230015 1 13 2023.pdf PDF
36C25923R0033_1.docx DOCX document
SPECS proj 554-23-103 Replace OR Booms.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
Drawings proj 554-23-103.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting

FOR

554-23-103 Replace OR Booms

The contractor is to provide all labor, tools, materials, equipment, and supervision required to remove all existing light and equipment booms in seventeen (17) operating and procedure rooms and replace with new light and equipment booms. The project location is building 3 (D/F) at RMR VAMC, 1700 N. Wheeling St., Aurora CO 80045.

All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.

Location: Rocky Mountain Regional VA Medical Center

Introductions: Ilze Karklins-Powers, CO and Steve Manciagli, COR Site Visit:

· The pre-bid meeting/site walk is not mandatory.

· Questions during site visit must be written down and submitted to the Contracting Officer to provide answers in an amendment to all interested parties.

Pertinent Dates:

· Bids are due on March 6, 2023 no later than 1:00 PM MT. Submit via email to ilze.karklins-powers@va.gov.

Site Visit Guidelines:

· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.

Solicitation Information:

· Confirmation of construction range: between $2,000,000 and $5,000,000.

· Bid Guarantee & Payment/Performance Bonds: are required as outlined in the solicitation.

· Special Standards of Responsibility: Please note solicitation requirements for submittal of OSHA and EMR ratings.

· VAAR clause 852.219-75 Subcontracting Commitments Monitoring and Compliance (Jul 2018): please ensure you provide a signed copy of this clause with your bid package.

· Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 365 days.

Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. T

· The contractor shall submit their weekly certified payrolls with their monthly invoice.