Drawings 621-23-106 Restore Exteriors for Quarters Buildings (18 Jan 2023).pdf
PDF 35 MB Posted
- Solicitation number
- 36C24923B0007
About this file
This solicitation is for construction services to restore the exteriors of five historical quarters buildings located at the James H. Quillen VA Medical Center. The scope of work includes replacing wood, installing water barriers and gutters, tuckpointing and repairing brick, and conducting roof repairs over a 400-day period of performance. The contractor will be responsible for supervision, scheduling, site visits, submittals, deliveries, inspections, and project closeout in accordance with the statement of work. Work will take place onsite at the medical center and be coordinated around occupied areas. The solicitation includes details on security requirements, parking and traffic regulations, and coordinating access and outages to minimize disruptions.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location:
Site:
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
COVER SHEET AND
INDEX SHEET
G-001
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS 621-23-106
NOVEMBER 1,
NJH
N/A
STATION MAP
NTS
SHEET INDEX
G-001 COVERSHEET AND INDEX SHEET
G-002 GENERAL PROJECT NOTES AND REFERENCES
G-003 SITE AND STAGING PLAN
A-001 BLDG 15 EXTERIOR
A-002 BLDG 15 EXTERIOR FRONT DETAILS
A-003 BLDG 15 EXTERIOR LEFT DETAILS
A-004 BLDG 15 EXTERIOR REAR DETAILS
A-005 BLDG 15 EXTERIOR RIGHT DETAILS
A-006 BLDG 45 EXTERIOR
A-007 BLDG 45 EXTERIOR FRONT DETAILS
A-008 BLDG 45 EXTERIOR LEFT DETAILS
A-009 BLDG 45 EXTERIOR REAR DETAILS
A-010 BLDG 45 EXTERIOR RIGHT DETAILS
A-011 BLDG 46 EXTERIOR
A-012 BLDG 46 EXTERIOR FRONT DETAILS
A-013 BLDG 46 EXTERIOR LEFT DETAILS
A-014 BLDG 46 EXTERIOR REAR DETAILS
A-015 BLDG 46 EXTERIOR RIGHT DETAILS
A-016 BLDG 47 EXTERIOR
A-017 BLDG 47 EXTERIOR FRONT DETAILS
A-018 BLDG 47 EXTERIOR LEFT DETAILS
A-019 BLDG 47 EXTERIOR REAR DETAILS
A-020 BLDG 47 EXTERIOR RIGHT DETAILS
A-021 SITE DETAILS
A-022 ROOF AND COLUMN DETAILS
JAMES H. QUILLEN VA MEDICAL CENTER
RESTORE EXTERIORS FOR QUARTERS BUILDINGS
PROJECT# 621-23-106
DEPARTMENT OF VETERANS AFFAIRS
MOUNTAIN HOME, TENNESSEE 37604
N/A
PROJECT SITE
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
GENERAL PROJECT
NOTES AND
REFERENCES
G-002
621-23-106
November 1, NJH
N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
GENERAL NOTES - EXISTING FACILITIES
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE
ATTENTION OF THE COR.
2. THE GERNAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN AND EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
DEMOLITION AND CONSTRUCTION.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE
RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
4. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH COR. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE COR'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE COR.
5. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE VA'S AREAS ADJACENT TO CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT
PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY.
6. THE GENERAL CONTRACTOR SHALL MAINTAIN THE BUILDINGS IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
8. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL
TIMES.
9. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE COR FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR, AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
10. REMOVAL OF A PARTICULAR ITEM SHALL INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONRACTOR SHALL
COORDINATE WITH ALL OTHER DISCIPLINES.
11. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN
THE FINAL CONSTRUCTION.
12. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THEN THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
13. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMODATE THE NEW MATERIALS.
14. FIELD VERIFY SIZES AND DIMENSIONS OF EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION OF PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
15. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFED TO ACHIEVE THE PROPER FIRE RATING BY THE END
OF CONSTRUCTION OPERATIONS FOR EACH DAY.
16. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL
STRUCTURAL MEMBERS ARE NOT DAMAGED.
17. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
GENERAL NOTES - DEMOLITION
1. ALL PLANS SHALL BE IN ACCORDANCE WITH CURRENT VA AND APPLICABLE TENNESSEE DEPARTMENT OF TRANSPORTATION STANDARDS.
2. CONTRACTOR SHALL OBTAIN A PERMIT FOR ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATION.
3. CONTRACTOR TO REMOVE/TRIM TREES ADN CLEAR AREAS AS NECESSARY TO COMPLETE ALL SITE WORK INCLUDIGN GRDING AND UTILITY WORK.
4. PROTECTION OF EXISTING TREES AND VEGETATION: PROTECT EXISTING TREES AND OTHER VEGETATION INDICATED TO REMIAN IN PLACE AGAINST UNNECESSARY CUTTING. BREAKING OR SKINNING OF ROOTS, SKINNING OR BRUSHING OF BARK, SMOTHERING OF TREES BY STOCKPILING OF CONSTRUCTION MATERIALS OR EXCAVATED MATERIALS WITHIN DRIP LINE. PROVIDE TEMPORARY GUARDS TO PROTECT TREES AND VEGETATION TO BE LEFT STANDING.
5. CONTRACTOR SHALL IMPLEMENT ALL SOIL AND EROSION CONTROL PRACTICES REQUIRED BY THE VETERANS ADMINISTRATION AND THE TENNESSEE EPA.
6. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL EXISTING UTILITIES (INCLUDING THOSE LABELED PER RECORD DATA) PRIOR TO THE BEGINNING OF CONSTRUCTION OR EARTH MOVING ACTIVITIES. INFORM THE COR AND CO OF ANY CONFLICT DETRIMENTAL TO THE DESIGN INTENT.
7. FORTY-EIGHT HOURS BEFORE DIGGING IS TO COMMENCE, THE CONTRACTOR SHALL NOTIFY THE FOLLOWING AGENCIES: TENNESSEE 811 AND ALL OTHER AGENCIES WHICH MAY HAVE UNDERGROUND UTILITIES INVOVLING THIS PROJECT AND ARE NON-MEMBER OF TENNESSEE 811.
8. IF NECESSARY, SAWCUT EXISTING CONCRETE IN NEAT, STRAIGHT LINES TO CREATE A CLEAN JOINT.
9. CONTRACTOR TO GRADE LAWN AREAS TO DRAIN AWAY FROM BUILDING.
10. ALL GROUND SURFACE AREAS THAT HAVE BEEN EXPOSED OR LEFT BARE AS A RESULT OF CONSTRUCTION AND ARE TO FINAL GRADE AND ARE TO REMAIN SO SHALL BE SEEDED AND MULCHED AS SOON AS PRACTICAL IN ACCORDANCE WITH THE SPECIFICATIONS.
BUILDING CODE SUMMARY
APPLICABLE CODES AND STANDARDS
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2020 NFPA 70 NATIONAL ELECTRICAL CODE
2021 NFPA 101 LIFE SAFETY CODE
2006 ABA ACCESSIBILITY STANDARDS FOR FEDERAL FACILITIES
SYMBOLS
GENERAL NOTES - NEW WORK
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER'S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORSEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED IN WRITING TO THE COR AND CO PRIOR TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE
COR IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS OF THESE DOCUEMNTS AND THE
MANUFACTURER'S INSTRUCITONS.
6. ALL THE MATERIASL USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONSTRACTOR IS REQUIRED TO NOTIFY THE COR TO OBTAIN A MINIMUM
STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS, AND TECHNIQUES FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECLTY ONTO TRUCKS OR INTO DUMPSTER FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXITS, OR INTERFERE WITH ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.
11. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING TO DETERMINE THE SIZE AND LOCATION OF ALL PENETRATIONS IN NEW CONSTRUCTION AS NEEDED. COORDINATE AND PROVIDE ALL OPENINGS. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK. EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR OPENINGS SHOWN ON DRAWINGS SHALL BE VERIFIED WITH THE
ASSOCIATED SUB-CONSTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF CONSTRUCTION.
13. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
14. THE CONTRACTOR SHALL PROVIDE TERMITE INSPECTION AND PROTECTION.
15. THE BUILDING WILL REMAIN UNOCCUPIED DURING CONSTRUCTION. NEIGHBORING BUILDINGS AND PARKING AREAS WILL REMAIN OCCUPIED DURING
CONSTRUCTION.
16. ALL PROPOSED STORM SEWER, SURFACE, AND OTHER DRAINAGE FACILITIES ARE TO BE PRIVATE AND MAINTAINED BY OWNER. ALL STORM STRUCTURES ARE TO BE IN ACCORDANCE WITH TENNESSEE DOT STANDARDS UNLESS OTHERWISE NOTED. FOR EXACT LOCATIONS OF DOWN SPOUTS AND ROOF DRAINS COORDINATE WITH ARCHITECTURAL DRAWINGS. PLUMBING DRAWINGS AVAILABLE UPON REQUEST. ALL ROOF DRAINS, DOWNSPOUT AND STORM SEWER LINES TO BE 8" PVC PIPE AT A
SLOPE OF 2.5% UNLESS OTHERWISE SPECIFIED.
17. CONTRACTOR SHALL PRESENT SHOP DRAWINGS FOR APPROVAL OF JOIST REPAIR; COLUMN AND RAILING REPLACEMENTS; DOWNSPOUT CONNECTIONS AND EXTENSIONS; ROOF DETAILS TO INCLUDE FLASHING, CRICKETS, AND GUTTER CONNECTIONS; AND, OTHER WORK AS DISCUSSED IN SPECIFICATION 01 33 23 AND/OR
REQUEST BY COR.
18. NEW WORK TO MATCH EXISTING HISTORICAL LOOK OF WOOD SIDING, COLUMNS, GUTTERS, DOWNSPOUTS, STRAPS. AND ALL ASSOCIATED ACCESSORIES IN KIND
(COLOR, SHAPE, PROFILE, TEXTURE, MATERIAL, ETC).
X DETAIL/DRAWING NUMBER
XXXX SHEET LOCATION
X X SILT FENCE
UNDERGROUND DISCHARGE OF DOWNSPOUT
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
SITE AND STAGING PLAN G-003
621-23-106
November 1, NJH
N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
GENERAL NOTES - SITE AND STAGING PLAN
1. PROJECT SHALL BE COMLETED IN PHASES AS INDICATED ON THIS
SHEET.
2. THE SITE IS BORDERED NORTH, EAST, AND WEST BY COMMERCIAL AND
EAST TENNESSEE STATE UNIVERSITY PROPERTIES.
3. THIS SITE IS LOCATED AROUND MATURE TREES AND EXISTING HISTORIC
FACILITIES THAT INCLUDE EXISTING BUILDINGS, PARKING, MEDICAL
CENTER, AND A CEMETARY.
4. CONTRACTOR CANNOT BLOCK ACCESS TO NEIGHBORING BUILDINGS,
ROADS, AND PARKING AREAS, INCLUDING CONEXES ADJACENT TO BLDG 15.
ANY TEMPORARY CLOSURES OR LIMITED ACCESS DUE TO DELIVERIES
MUST BE COORDINATED WITH THE COR AND INCLUDE TRAFFIC CONTROL
MEASURES.
5. POTENTIAL LAYDOWN AREA AS SHOWN TO BE FINALIZED PRIOR TO
PROJECT START DATE. LAYDOWN AREA PLAN AND ASSOCIATED
REQUIREMENTS, SUCH AS CONSTRUCTION FENCE, GRAVEL, AND SILT
FENCE IF NECESSARY, TO BE APPROVED BY COR.
EROSION AND SEDIMENT CONTROL PROGRAM
1. PRIOR TO THE REMOVAL OF TREES AND SHRUBS, INSTALLATION OF
SEDIMENT CONTROL MEASURES, TRENCHING, OR GRADING, THE
CONTRACTOR SHALL CALL FOR THE INSPECTION OF DIVISION OF WATER
RESOURCES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND
CONSERVATION (TDEC) PRIOR TO THE START OF ANY LAND DISTURBING
ACTIVITY. CONTRACTOR TO VERIFY EXISTING SITE CONDITIONS AND
ESTABLISH LIMITS OF DISTURBANCE (LOD).
2. CONTRACTOR MUST INSTALL TREE AND SHRUB PROTECTIONS PER
SPECITIFCATION 01 57 19. ANY TREES OR SHRUBS THAT ARE DAMAGED OR
REMOVED WILL BE REPLACED BY THE CONTRACTOR.
3. DURING ACTIVE CONSTRUCTION, CONTRACTOR SHALL INSTALL SILT
FENCE FIVE FEET FROM THE ACTIVE DIGGING AREA FOR GUTTER
DOWNSPOUTS AND EXTENSIONS OF DISCHARGES.
4. ALL MEASURES ARE TO BE INSPECTED AT THE END OF EACH DAY AND
AFTER EACH RAINFALL BY THE SUPERINTENDENT OR HIS REPRESENTATIVE.
ANY DAMAGED STRUCTURAL MEASURES ARE TO BE REPAIRED BY THE END
OF THE DAY.
5. INSTALL SILT FENCE AND OTHER EROSION AND SEDIMENT CONTROL
MEASURES NEEDED TO PROTECT ROADS AND INLETS.
6. WHERE CONSTRUCTION VEHICLE ACCESS PAVED PUBLIC ACCESS
ROADS ON CAMPUS, SEDIMENT SHALL BE REMOVED FROM THE ROADS BY
SHOVELING OR SWEEPING THEN TRANSPORTING TO A SEDIMENT CONTROL
DISPOSAL AREA. STREET WASHIGN SHALL BE ALLOWED ONLY AFTER
SEDIMENT IS REMOVED IN THIS MANNER.
7. THE CONTRACTOR SHALL CONDUCT OPERATIONS AND MAINTAIN THE
PROJECT SITE AS TO MINIMIZE THE CREATION AND DISPERSION OF DUST.
DUST CONTROL SHALL BE USED THROUGHOUT THE WORK AT THE SITE AS
PER THE STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND
SEDIMENT CONTROL.
STAFF
PARKING
LOT
Phase 1
Phase 2
Phase 3
LEGEND
(PURPLE): STORM STEWER
(BLUE): WATER LINES
(YELLOW): GAS LINES
(RED): UNDERGROUND ELECTRICAL
(GREEN): SANITARY SEWER
Phase 4
East Tennessee State University Properties
East Tennessee State University Property
F1
A-021
F1
A-021
POTENTIAL
LAYDOWN AREA
F1
A-021 F1
A-021
F1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 15 EXTERIOR A-001
621-23-106
NOVEMBER 1,
NJH
15 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
A/B
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 15 EXTERIOR
FRONT DETAILS
621-23-106
NJH
NOVEMBER 1,
A-002
NTS
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/ADHERED MODIFIED BITUMEN/EPDM ROOFING SYSTEM ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
8. REMOVE ROTTEN WOOD FROM JOIST AND REPAIR/REPLACE (APPROXIMATELY 40 LF OF THE BUILDING).
9. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET BASED ON
SLOPE.
10. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
11. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
F1
A-021
C1
A-021
C1
A-021
C1
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 15 EXTERIOR LEFT
DETAILS
A-003
621-23-106
NOVEMBER 1,
NJH
15 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
A/B
KEY NOTES
1. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
2. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS AND OTHER AREAS TO PREPARE SURFACE. PRIME AND APPLY
TWO COATS OF PAINT.
3. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
4. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
5. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT AND BACK PORCHES (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY
TWO COATS OF PAINT.
6. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM
FOR 25 FEET.
7. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 15 EXTERIOR
REAR DETAILS
A-004
621-23-106
NOVEMBER 1,
NJH
15 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN
KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
2. TUCKPOINT AND REPAIR DAMAGE TO CHIMNEY (120 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED. REPAIR/REPLACE CRICKET AND FLASHING AS NEEDED.
3. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS AND OTHER AREAS TO PREPARE SURFACE. PRIME AND APPLY TWO COATS OF
PAINT.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
9. REMOVE EXISTING IRON HANDRAIL AND REPLACE (APPROXIMATELY 30 LF).
10. REMOVE ROTTEN WOOD FROM JOIST AND REPAIR/REPLACE (APPROXIMATELY 40 LF OF THE BUILDING).
11. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
12. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 15 EXTERIOR
RIGHT DETAILS
621-23-106
NJH
NOVEMBER 1,
A-005
NTS
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
KEY NOTES
1. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
2. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS AND OTHER AREAS (SUCH AS VENT AND COVER SHOWN)
TO PREPARE SURFACE. PRIME AND APPLY TWO COATS OF PAINT.
3. VERIFY USE/CONNECTION OF OLD CONNECTION BOX AND WIRING AND REMOVE BEFORE PRIMING AND PAINTING WOOD SIDING.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
6. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO
COATS OF PAINT.
7. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND
SYSTEM FOR 25 FEET.
8. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
C1
A-021 C1
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 45 EXTERIOR A-006
621-23-106
NOVEMBER 1,
NJH
45 N/A
STATION MAP
NTS
RESTORE EXTERIORS
FOR QUARTERS
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 45 EXTERIOR
FRONT DETAILS
621-23-106
NJH
NOVEMBER 1,
A-007
NTS
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY
TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL
CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN
PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF).
CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
9. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
10. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
F1
A-021
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 45 EXTERIOR LEFT
DETAILS
A-008
621-23-106
NOVEMBER 1,
NJH
45 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, METAL HANDRAIL/GUARDRAIL, AND OTHER
AREAS TO PREPARE SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
4. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
5. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
6. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
7. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
8. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
9. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021 C1
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 45 EXTERIOR
REAR DETAILS
A-009
621-23-106
NOVEMBER 1,
NJH
45 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY
TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL
CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN
PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. CLEAN AND PREPARE METAL HANDRAIL/GUARD RAIL ON REAR STEPS FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN/EPDM ROOFING SYSTEM ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
7. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
8. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
9. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 45 EXTERIOR RIGHT
DETAILS
621-23-106
NJH
NOVEMBER 1,
A-010
NTS
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND
APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,200 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN
KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
4. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
5. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 100 LF).
6. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
7. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
8. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
9. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 46 EXTERIOR A-011
621-23-106
NOVEMBER 1,
NJH
46 N/A
RESTORE EXTERIORS
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 46 EXTERIOR
FRONT DETAILS
A-012
621-23-106
NOVEMBER 1,
NJH
46 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
F1
A-021
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND
APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND
WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 150 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
9. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
10. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 46 EXTERIOR LEFT
DETAILS
A-013
621-23-106
NOVEMBER 1,
NJH
46 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE
SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM
ON ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 150 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS
OF PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM
FOR 25 FEET.
9. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 46 EXTERIOR REAR
DETAILS
621-23-106
NJH
NOVEMBER 1,
A-014
NTS
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
N/A
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. CLEAN AND PREPARE METAL HANDRAIL/GUARD RAIL ON REAR STEPS FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
6. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
7. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
8. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 46 EXTERIOR
RIGHT DETAILS
A-015
621-23-106
NOVEMBER 1,
NJH
46 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 1,500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON
ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 150 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF
PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING).
ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
9. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
10. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 47 EXTERIOR A-016
621-23-106
NOVEMBER 1,
NJH
47 N/A
RESTORE EXTERIORS
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 47 EXTERIOR
FRONT DETAILS
A-017
621-23-106
NOVEMBER 1,
NJH
47 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
F1
A-021
F1
A-021
B
A-021
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE SURFACE, PRIME, AND APPLY
TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL
CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. CLEAN AND PREPARE METAL HANDRAIL ON FRONT STEPS FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
4. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
5. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND FLAG;
SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
6. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON ROOF.
7. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 150 LF).
8. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF).
CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
9. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR 25 FEET.
10. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON COMPLETION.
11. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 47 EXTERIOR LEFT
DETAILS
A-018
621-23-106
NOVEMBER 1,
NJH
47 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
B
A-021
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE
SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. TUCKPOINT AND REPAIR DAMAGE TO FRONT BRICK STEPS AND CHIMNEY (150 SF TUCKPOINTING) - FIELD VERIFY EXTENT REQUIRED.
4. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS WINDOW, DOOR, AND HOUSE TRIM. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
5. REPAIR/REPLACE DECK SUBSTRUCTURE ON PORCH OF SECOND STORY (APPROXIMATELY 550 SF). REMOVE ADHERED EPDM ROOFING SYSTEM ON SECOND STORY BALCONY/PORCH (APPROXIMATELY 550 SF) AND REPLACE WITH TPO. REPLACE TPO/AHHERED MODIFIED BITUMEN ROOFING SYSTEM ON
ROOF.
6. REPAIR/REPLACE WOOD GUARDRAIL, COLUMNS, AND COLUMN BASES ON SECOND STORY EXTERIOR BALCONY (APPROXIMATELY 150 LF).
7. REPAIR/REPLACE WOOD GUARDRAIL AND ANY DAMAGED, ROTTEN, UNMATCHED WOOD ON COLUMNS AND COLUMN BASES ON FRONT PORCH (APPROXIMATELY 150 LF). CLEAN AND REMOVE PAINT FROM WOOD THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS
OF PAINT.
8. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM FOR
25 FEET.
9. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
10. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
BLDG 47 EXTERIOR
REAR DETAILS
621-23-106
NJH
NOVEMBER 1,
A-019
NTS
N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, HAND RAIL, AND OTHER AREAS TO
PREPARE SURFACE. PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK MASONRY FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 500 SF TUCKPOINTING OF THE BUILDING). PATCH AS REQUIRED TO MATCH ADJACENT CONSTRUCTION IN KIND WHERE ALL CONSTRUCTION IS TO REMAIN - FIELD VERIFY EXTENT REQUIRED.
3. REMOVE EXISTING HANDRAIL ON REAR STEPS. INSTALL NEW HANDRAIL. PRIME, AND APPLY TWO COATS OF PAINT. CLEAN HANDRAIL/GUARDRAIL ON
STEPS TO BASEMENT ENTRANCE; PRIME AND APPLY TWO COATS OF PAINT.
4. CLEAN AND REPAIR CRACKS IN REAR STEPS.
5. REMOVE WOOD SIDING AND ANY DAMAGED, ROTTEN WOOD ADJACENT, SUCH AS TRIM OF WINDOWS AND DOORS. REMOVE EXTERIOR SIGNAGE AND SECURE/PROTECT FOR REINSTALLATION. INSTALL MOISTURE BARRIER AND NEW WOOD (CYPRESS) SIDING. CLEAN AND REMOVE PAINT FROM WOOD, METAL, AND MASONRY THAT IS TO REMAIN IN PREPARATION FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
6. REPLACE METAL RAIL/HANDRAIL (APPROXIMATELY 20 LF) OF REAR PORCH. CLEAN AND PREPARE SURFACE OF RAIL/HANDRAIL LEADING TO
BASEMENT ENTRANCE FOR PAINTING. PRIME AND APPLY TWO COATS OF PAINT.
7. REMOVE EXISTING METAL GUTTERS, INCLUDING SPLASHGUARDS, AND REPLACE WITH COPPER GUTTERS (APPROXIMATELY 1,500 LF OF THE BUILDING). ADD GUTTER GUARDS TO PROTECT FROM FALLING LEAVES. DIVERT WATER AWAY FROM FOUNDATION USING AN UNDERGROUND SYSTEM
FOR 25 FEET.
8. PROVIDE FINAL SMOOTH GRADE, MULCH, AND SEED ALL GRASSED AREAS DISTURBED BY WORK, INCLUDING INSTALLATION OF DRAINAGE, UPON
COMPLETION.
9. REINSTALL EXTERIOR SIGNAGE IN ACCORDANCE WITH VA STANDARDS.
B
A-021
C1
A-021
Drawn:
Project Title:
Checked: Approved:
Project No.
Drawing No.
Date
Building:
Scale:
JAMES H. QUILLEN
MOUNTAIN HOME VAMC
Drawing Title:
Revisions DateApprovals Date
MOUNTAIN HOME
Floor:
NTS
BLDG 47 EXTERIOR
RIGHT DETAILS
A-020
621-23-106
NOVEMBER 1,
NJH
47 N/A
RESTORE EXTERIORS
FOR QUARTERS
BUILDINGS
KEY NOTES
1. PRESSURE WASH ROOF. CLEAN AND REMOVE PAINT FROM BRICK MASONRY FOUNDATION WALLS, WINDOWS, AND OTHER AREAS TO PREPARE
SURFACE, PRIME, AND APPLY TWO COATS OF PAINT.
2. TUCKPOINT AND REPAIR DAMAGE TO BRICK FOUNDATION IN A NUMBER OF LOCATIONS, INCLUDING EXTERIOR AND INTERIOR SIDE OF WALL IN SPOT AREAS, IN ORDER TO ADDRESS WATER INFILTRATION (APPROXIMATELY 500 SF TUCKPOINTING OF THE BUILDING).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .