Drawings 506-CSI-113.pdf
PDF 13 MB Posted
- Attached to
- Z1DA--CSI Site Prep Angio 0R-6 506-CSI-113
- Solicitation number
- 36C25021B0022
About this file
This announcement provides details for a forthcoming solicitation seeking construction services. The Department of Veterans Affairs VA Medical Center in Battle Creek, Michigan will issue an invitation for bid on or around March 9, 2021 for project number 506-CSI-113 to reconfigure space in Operating Room 6 at the Ann Arbor VA Medical Center to allow for the installation of new medical equipment. The solicitation will have a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The contractor will be responsible for site preparation including floors, walls, ceilings and utilities to support the new equipment installation over a 180-day performance period. The estimated value of the firm fixed-price contract is between $1 million and $2 million. Interested parties should register on Contract Opportunities and periodically check the website for any amendments, as the solicitation and all related documents will only be available electronically through that portal.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO SCALE
N
EW
SS
NO SCALE
N
E
W
S
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
STAMP Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
Approved : Project Director
Building Number
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
9 10
ANN ARBOR, MICHIGAN
ARCHITECT / ENGINEER OF RECORDCONSULTANT
SITE PREP ANGIO OR-6
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
2215 FULLER RD ANN ARBOR MI 48105
VA ANN ARBOR
100% BID DOCUMENTS
506-CSI-113
506-CSI-113
TPM MRB
COVER SHEET 100% BID DOCUMENTS SITE PREP ANGIO OR-6
G-001
1E
06/01/2020
SHEET LIST
SHEET
NO. SHEET NAME
GENERAL
G-001 COVER SHEET
STRUCTURAL
S-106 PARTIAL SIXTH FLOOR FRAMING PLAN AND DETAILS
S-107 PARTIAL FRAMING PLANS AND DETAILS
ARCHITECTURAL
A-001 ARCHITECTURAL LEGENDS, SYMBOLS, AND ABBREVIATIONS
A-105 PARTIAL DEMOLITION & FLOOR PLANS
A-115 PARTIAL REFLECTED CEILING PLANS
A-125 PARTIAL EQUIPMENT PLAN
EQUIPMENT
EQ-1 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-2 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-3 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-4 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-5 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-6 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-7 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-8 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
EQ-9 EQUIPMENT DRAWINGS - FOR REFERENCE ONLY
FIRE PROTECTION
FP-105 PARTIAL FIFTH FLOOR FIRE PROTECTION PLAN
PLUMBING
P-005 PLUMBING LEGENDS
P-105 PARTIAL FIFTH FLOOR PLUMBING PLANS
MECHANICAL
M-005 MECHANICAL LEGENDS
MD-105 PARTIAL MECHANICAL DEMOLITION PLANS
M-105 PARTIAL MECHANICAL FLOOR PLANS
M-505 MECHANICAL SCHEDULES & DETAILS
ELECTRICAL
E-001 ELECTRICAL GENERAL INFORMATION
ED-105 PARTIAL FIFTH FLOOR ELECTRICAL DEMOLITION PLAN
EP-105 PARTIAL FIFTH FLOOR ELECTRICAL NEW WORK PLANS
REVISIONS: DATE:
06/01/2020
06/01/2020
06/01/2020
06/01/2020
PIR
US
PIR
PIR
E-GE-F
S-106
S-106
P5501 SLOTTED CHANNEL, TYP.
EXISTING INTERSTITIAL
FLOOR FRAMING, TYP.
EXISTING HANGER ROD, TYP.
PROPOSED FLOOR
OPENING, TYP. SEE DETAIL.
INSTALL 1"ø INTERSTITIAL FLOOR
HANGER ROD (9 LOCATIONS)
MODULAR CEILING SYSTEM
HANGER ROD (BY OTHERS)
25' - 0" ±
1"
2' - 11 3/4"
8 7/8" 2"
1' - 6"
9 5/8"
1' - 0 7/8"
1' - 1"
4"
5 1/2"
1' - 6"
2"
6 1/8" 2' - 6 7/8" 5' - 9 3/8"
/8
/4
/2
/4
S-106
TYP.
MODULAR CEILING SYSTEM
HANGER ROD (BY OTHERS) W/
SLOTTED CHANNEL BRIDGE
STEEL ANGLE BELOW SLAB W/
SLOTTED CHANNEL ABOVE SLAB.
SEE DETAILS.
4' - 8" 4' - 2" 4' - 2" 5' - 2" 3' - 2 3/8" ±
EXISTING INTERSTITIAL FLOOR
HANGER ROD, TYP.
9' - 1 1/2" 1' - 2" 1' - 7" 1' - 11" 1' - 6 1/2" 1' - 2"
/8
EXISTING DUCT
EXISTING
DUCT
VERIFY W/ MANUF.
12' - 7" ±
V E
R
IF
Y W
M
A N
U F
ISOCENTER
BELOW
TYP.
STEEL ANGLE BELOW SLAB, TYP.
1'
1"
6'
3/ 8"
9" 3' - 3 5/8"
STEEL ANGLES BELOW SLAB
TYP.
INTERSTITIAL FLOOR
158' - 5 1/4"
3/8" STEEL PLATE ANCHORED TO BOTTOM OF EXISTING
CONCRETE FLOOR USING (4) 1/2" x 3" LG. HILTI KH-EZ
SCREW ANCHORS (MAX. INFILL OPENING SIZE 12"ø). FILL
OPENING WITH LIGHTWEIGHT CONCRETE OR GROUT TO
MATCH ADJACENT CONSTRUCTION.
SCARIFY (OR BONDING AGENT)
PERIMETER SURFACE 1/4" DEEP
PRIOR TO PLACEMENT OF
CONCRETE
MODIFY PLATE SIZE AS REQUIRED FOR
ANCHORS TO BE PLACED MIN. 1 1/4"
FROM EDGE OF UNCUT DECK FLUTES,
TYP.
MIN.
1 1/4"
TYP.
1 1/2"
12"ø MAX.
INTERSTITIAL FLOOR
158' - 5 1/4"
FULLY INTEGRATED MODULAR
CEILING SYSTEM. SEE
ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
THREADED ROD SUPPORTS BY
MODULAR CEILING SYSTEM SUPPLIER
SLOTTED CHANNEL
FRAMING, SEE PLAN
EXISTING FLOOR
FRAMING, SEE PLAN
EXISTING CONCRETE FLOOR
ON METAL DECK
1/
2"
1/
2"
V E
R
IF
Y W
/ M A
N U
F
1'
COMPRESSIBLE NEOPRENE SHIM, TYP.
DRILL HOLE THROUGH INTERSTITIAL FLOOR FOR
THREADED ROD , TYP. USE GROUND PENETRATING
RADAR TO LOCATE EXISTING CONCRETE
REINFORCEMENT. DO NOT CUT EXISTING
CONCRETE REINFORCEMENT.
NUT AND OVERSIZED WASHER, TOP AND
BOTTOM. TACK WELD OR DESTROY
THREADS TO PREVENT LOOSENING
1/8 2
1/8 2
TYP.
1/4" STEEL PLATE
BRACE IN TWO
DIRECTIONS (90°) AT
EACH THREADED
ROD. WELD OR BOLT
TO EXISTING
STRUCTURE. REPAIR
FIREPROOFING IN
KIND.
L4x4x1/4"
L4x4x1/4"
L4 x4 x1 /4
L4 x4 x1 /4
3/16
3/16
TYP.
OPENING TO MEET MECH.
EQUIPMENT AND OPENING
REQUIREMENTS. VERIFY ALL
LOCATIONS W/ MECH. AND ARCH.
PLANS
EXISTING STEEL BEAM PER
FRAMING PLAN, TYP.
NOTE:
THIS FRAMING IS FOR STEEL BEAM SPACING
UP TO 8'-0" O.C. (SPANS OF 8'-0" O.C. OR
GREATER REQUIRE SPECIAL DESIGN)
A
A
SECTION A-A
FLOOR OPENING
STEEL ANGLE TO SUPPORT EXISTING
METAL DECK AT OPENING
SHIM FLUSH WITH EXISTING
METAL DECK
EXISTING FLOOR FRAMING WITH
FIREPROOFING
3/16 3
3/16 3
TYP.
1.
NOTE:
REMOVE EXISTING
FIREPROOFING FOR
INSTALLATION OF OPENING
FRAMING. REPLACE
FIREPROOFING IN KIND.
3/16 3
3/16 3
TYP.
STRUCTURAL DESIGN INFORMATION:
DESIGN DATA BASED ON ASCE 7-10
RISK CATEGORY: IV
1. SNOW LOAD:
SNOW EXPOSURE FACTOR (Ce) 0.9
THERMAL FACTOR (Ct) 1.0
SNOW IMPORTANCE FACTOR (Is) 1.2
GROUND SNOW LOAD (Pg) 20 PSF
2. LIVE LOAD:
INTERSTITIAL 25 PSF
5TH FLOOR 100 PSF
3. WIND LOADS:
BASIC WIND SPEED 120 MPH
WIND IMPORTANCE FACTOR (Iw) 1.00
WIND EXPOSURE CATEGORY 'C'
4. SEISMIC LOADS:
SEISMIC IMPORTANCE FACTOR (Ie) 1.5
SITE CLASS 'D'
SPECTRAL RESPONSE COEFFICIENTS:
Ss = 0.094g Sds = 0.16g
S1 = 0.048g Sd1 = 0.076g
SEISMIC DESIGN CATEGORY 'C'
STRUCTURAL STEEL:
1. STRUCTURAL AND MISC. STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE MOST RECENT EDITION OF AISC STEEL CONSTRUCTION
MANUAL AND CODE OF STANDARD PRACTICE. STEEL JOISTS SHALL CONFORM TO THE
MOST RECENT EDITION OF STANDARD SPECIFICATIONS OF THE STEEL JOIST INSTITUTE.
METAL DECK SHALL CONFORM TO THE MOST RECENT EDITION OF THE STANDARD
SPECIFICATION OF THE STEEL DECK INSTITUTE.
3. USE BOLTED CONNECTIONS AS SPECIFIED IN FRAMING DETAIL FOR SIZE AND NUMBER
OF BOLTS AND WELDS FOR ALL STRUCTURAL STEEL CONNECTIONS. ALL BOLTED
CONNECTIONS SHALL BE STANDARD ROUND HOLES (UNLESS NOTED OTHERWISE).
IF DETAIL IS NOT PROVIDED:
ALL BOLTED CONNECTIONS SHALL BE BEARING TYPE "N", 3/4" DIA. BOLTS (BRG. TYPE)
OR WELDED EQUIVALENT, UNLESS OTHERWISE NOTED. SELECT CONNECTIONS TO
SUPPORT ONE HALF THE TOTAL LOAD CAPACITY FOR EACH GIVEN BEAM AND SPAN.
THE EFFECT OF CONCENTRATED LOADS SHALL ALSO BE CONSIDERED.
4. CONNECTIONS MADE WITH HIGH STRENGTH STEEL BOLTS SHALL CONFORM IN ALL
RESPECTS TO THE CURRENT SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM
A325 BOLTS AS ENDORSED BY THE AISC. NO PAINT ON FAYING SURFACES.
5. WELDING SHALL BE DONE IN ACCORDANCE WITH THE "AMERICAN WELDING SOCIETY"
(AWS) D1.1, USING E70 ELECTRODES. WELDING SHALL BE PERFORMED BY AN
APPROVED CERTIFIED WELDER.
6. NO CHANGES SHALL BE MADE IN THE STEEL STRUCTURE NOR ANY MATERIAL CUT IN THE
FIELD (UNLESS NOTED AS "FIELD CUT OR TRIM" ON DRAWINGS), WITHOUT THE
WRITTEN PERMISSION OF THE ENGINEER.
7. NO CUTTING, BURNING, OR HOLES OTHER THAN THOSE SPECIFICALLY DETAILED SHALL
BE ALLOWED THROUGH STRUCTURAL STEEL MEMBERS WITHOUT THE PRIOR CONSENT
OF THE ENGINEER. BOLT HOLES SHALL CONFORM WITH THE GOVERNING AISC
SPECIFICATION, AND SHALL BE STANDARD HOLES UNLESS NOTED OTHERWISE.
8. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES BETWEEN
THE DESIGN AND ACTUAL CONDITIONS NOTED IN THE FIELD.
9. CONTRACTOR SHALL PROVIDE NECESSARY LABOR, MATERIAL, AND EQUIPMENT TO
ERECT ALL MISCELLANEOUS IRON AND STEEL AS DETAILED ON THESE DRAWINGS.
10. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION.
GENERAL STRUCTURAL NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS AND CONDITIONS
AT THE JOB SITE AND TO CROSS-CHECK DETAILS AND DIMENSIONS ON THE STRUCTURAL
DRAWINGS WITH THE RELATED REQUIREMENTS ON THE ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING PLANS. FLOOR AND WALL OPENINGS, SLEEVES AND OTHER
ARCH., MECH., ELEC., REQUIREMENTS MUST BE COORDINATED BEFORE THE CONTRACTOR
PROCEEDS WITH CONSTRUCTION.
2. ALL ENGINEERING DESIGN, CONSTRUCTION, AND TESTING SHALL CONFORM TO THE
REQUIREMENTS OF THE MOST RECENT EDITION OF THE MICHIGAN BUILDING CODE.
3. ALL STRUCTURAL WORK MUST BE TEMPORARILY BRACED AND SUPPORTED UNTIL THE
STRUCTURE IS SUFFICIENTLY COMPLETED AND CAN SAFELY CARRY THE DESIGN AND
CONSTRUCTION LOADS.
4. REFER TO THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN ON
THE STRUCTURAL DRAWINGS.
5. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER BEFORE PROCEEDING WITH ANY WORK THAT IS INVOLVED IN THE CONFLICT.
ABBREVIATIONS
TYPE DESCRIPTION
A.B. ANCHOR BOLT
ALT. ALTERNATE
ARCH. ARCHITECTURAL
AVG. AVERAGE
AFF ABOVE FINISH FLOOR
BFF BELOW FINISH FLOOR
BLDG. BUILDING
BM. BEAM
B.O. BOTTOM OF
BRG. BEARING
C.J. CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CONC. CONCRETE
CONST. JT. CONSTRUCTION JOINT
CONT. CONTINUOUS
D DEPTH
DET. DETAIL
DTL. DETAIL
DIA. DIAMETER
EA. EACH
ELEV. ELEVATION
EQ. EQUAL
E.W. EACH WAY
EXIST. EXISTING
EXST. EXISTING
E.F. EACH FACE
F.F. FINISH FLOOR
FLR. FLOOR
FND. FOUNDATION
FNDTN. FOUNDATION
FTG. FOOTING
F.S. FAR SIDE
GA. GAUGE
GALV. GALVANIZED
HDG HOT DIPPED GALVANIZED
HORIZ. HORIZONTAL
HORZ. HORIZONTAL
H.P. HIGH POINT
INSUL. INSULATION
I.F. INSIDE FACE
TYPE DESCRIPTION
L LENGTH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG. LONGITUDINAL
L.P. LOW POINT
MAX. MAXIMUM
MECH. MECHANICAL
MEZZ. MEZZANINE
MANUF. MANUFACTURER
MNF. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
N.S. NEAR SIDE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F OUTSIDE FACE
O.H. OVERHEAD
OHD OVERHEAD DOOR
O/O OUT TO OUT
PSF POUNDS PER SQUARE FT.
PSI POUNDS PER SQUARE IN.
R RADIUS
REINF. REINFORCING
SIM. SIMILAR
T&B TOP AND BOTTOM
T.O. TOP OF
T.O.B.L. TOP OF BRICK LEDGE
T.O.F TOP OF FOOTING
T.O.F.W. TOP OF FOUNDATION WALL
T.O.P. TOP OF PIER
T.O.S TOP OF STEEL
TRANS. TRANSVERSE
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT. VERTICAL
V.S.C VERTICAL SLOTTED CONN.
V.B.F. VERTICAL BRACED FRAME
WWF WELDED WIRE FABRIC
W WIDTH
W/ WITH
3/16 4
3/16 4
TYP.
3 SIDES,
TYP. 3/16
EXISTING 7TH FLOOR STEEL FRAMING, TYP.
W8x10 BETWEEN EXISTING
STEEL FLOOR FRAMING
6"x4"x3/8 SHEAR
PLATE, TYP.
EXISTING 6TH FLOOR (INTERSTITIAL) FLOOR FRAMING
EXISTING STEEL HANGER ROD
1"ø STEEL HANGER ROD, SEE PLAN (TYP. OF 9)
HSS6x4x1/2 x 3 1/2" LG., TYP.
3/16 3
TYP.
3/16 3
HEX NUT W/ 2 1/2"x2 1/2"x3/8" PLATE
WASHER TOP AND BOTTOM. TACK
WELD NUTS TO THREADED ROD.
3/16 3
TYP.
3/16 3
1.
NOTE:
INSTALL NEW HANGERS AFTER EXISTING DUCTWORK IS DEMOLISHED AND
PRIOR TO NEW DUCTWORK AND MODULAR CEILING SYSTEM INSTALLATION.
SEVENTH FLR.
T.O.S.
INTERSTITIAL
T.O.S.
EXISTING CONDUIT AND/OR PIPING.
FIELD VERIFY LOCATIONS AND MODIFY
AS REQUIRED FOR BEAM INSTALLATION.
6" M
IN
(2) P5501 SLOTTED CHANNEL
P1000 SLOTTED CHANNEL BRIDGE
BETWEEN P5501
THREADED ROD (BY OTHERS)4"
INDICATES PROPOSED MODULAR CEILING SYSTEM HANGER ROD (BY OTHERS)
INDICATES PROPOSED INTERSTITIAL FLOOR HANGER ROD
LEGEND
INDICATES PROPOSED MODULAR CEILING SYSTEM HANGER ROD (BY OTHERS)
W/ SLOTTED CHANNEL BRIDGE DETAIL (TYP. OF 16)
INDICATES EXISTING INTERSTITIAL FLOOR HANGER ROD
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND
THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF
ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO
REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR
CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR
IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 S-106
PARTIAL SIXTH FLOOR FRAMING
PLAN AND DETAILS
506-CSI-113SITE PREP ANGIO OR-6
ALM SJT
1E
3/8" = 1'-0"
PARTIAL FRAMING PLAN - SIXTH FLOOR (EXISTING)
1 1/2" = 1'-0"1 TYPICAL FLOOR INFILL DETAIL
1 1/2" = 1'-0"2 TYPICAL HANGER DETAIL
3/4" = 1'-0"3 TYPICAL FLOOR OPENING FRAMING DETAIL
1.
2.
3.
4.
5.
6.
DRAWING NOTES
VERIFY FINAL MODULAR CEILING SYSTEM HANGER ROD LOCATIONS WITH
MODULAR CEILING SYSTEM PROVIDER. COORDINATE HANGER ROD
LOCATIONS WITH OTHER TRADES PRIOR TO CONSTRUCTION.
STRUCTURAL ANALYSIS OF EXISTING BUILDING WAS COMPLETED USING
LOADING PROVIDED BY STEVENS MOON (MODULAR CEILING SYSTEM
SUPPLIER) BASED ON EQUIPMENT LAYOUT AND SELECTIONS SHOWN IN THESE
DRAWINGS. ANY CHANGES TO EQUIPMENT LAYOUT OR SELECTIONS REQUIRES
ADDITIONAL ANALYSIS BY C2AE PRIOR TO INSTALLATION.
PATCH HOLES AND VOIDS IN FLOORS THAT ARE CAUSED BY WORK IN THIS
CONTRACT WITH GROUT, CONCRETE, OR SIMILAR MATERIAL TO ADJACENT
CONSTRUCTION.
FIREPROOFING EXISTS ON EXISTING STRUCTURE. REMOVE AND REPLACE
FIREPROOFING IN KIND AS REQUIRED TO COMPLETE WORK.
REFER TO DETAIL ON THIS SHEET FOR CAPPING ABANDONED FLOOR
PENETRATIONS FROM DEMOLISHED DUCTWORK. REFER TO ARCHITECTURAL
AND MECHANICAL DRAWINGS FOR QUANTITY AND LOCATIONS.
SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION OF SIZE, QUANTITY, AND LOCATION OF NEW DUCT
PENETRATION FLOOR OPENINGS.
3/4" = 1'-0"4 TYPICAL INTERSTITIAL HANGER ROD DETAIL
1 1/2" = 1'-0"5 SLOTTED CHANNEL BRIDGE DETAIL
REVISIONS: DATE:
GF
25' - 0"
E Q
E
Q
E Q
E
Q
8'
6'
ROUND BAR
REINFORCEMENT,
TYP. SEE DETAIL
EXISTING 3" CONCRETE & 2" COMPOSITE
DECK ON STEEL FRAMING, FIELD VERIFY
E X
IS
T
IN
G
W x4 0, F
IE
LD
V
E R
IF
Y
E X
IS
T
IN
G
W x3 5, F
IE
LD
V
E R
IF
Y
E X
IS
T
IN
G
W x4 4, F
IE
LD
V
E R
IF
Y
E X
IS
T
IN
G
W x2 2, F
IE
LD
V
E R
IF
Y
EXISTING COLUMN, TYP.
FIELD VERIFY
8' - 4" ±, TYP.
S-107
TYP.
VERIFY W/ MANUF.
12' - 7" ±
V E
R
IF
Y W
/ M A
N U
F
ISOCENTER BELOW
1.25"ø ROUND BAR, SEE PLAN
EXISTING STEEL BEAM
EXISTING CONCRETE ON
METAL DECK
3/16 3-12
3/16 3-12
6" T&B AT
ENDS,
TYP.
GF
25' - 0"
EXISTING 3" CONCRETE & 2" COMPOSITE
DECK ON STEEL FRAMING, FIELD VERIFY
EXISTING COLUMN, TYP.
FIELD VERIFY
8' - 4" ±, TYP.
VERIFY W/ MANUF.
12' - 7" ±
V E
R
IF
Y W
/ M A
N U
F
ISOCENTER
FLOOR PLATE, SEE DETAIL
S-107
2' - 6"
3'
3'
W8x10 (TYP.) BELOW SLAB
E Q
E
Q
STEEL PLATE BELOW, SEE DETAIL
EXTEND PLATE TO ADJACENT FLUTE
1/2" THICK PLATE x 3' - 0" LG. ±
SURFACE MOUNTED FLOOR PLATE,
BY EQUIPMENT SUPPLIER
COUNTERSUNK 3/4"ø THROUGH BOLT W/
1/4" WASHER T&B, TYP.
5/8"ø SCREW ANCHOR AT 12" O.C.
INTO ADJACENT FLUTE (3" EMBED.)
SUPPORT BEAM, SEE PLAN
EXISTING CONCRETE ON METAL DECK
EXISTING STEEL BEAM, REMOVE AND
REPLACE FIREPROOFING IN KIND
STEEL BEAM, SEE PLAN
(2) 3/4"ø A325 BOLTS W/
3/8" THICK SHEAR PLATE
3/16
TYP. 3
SIDES
3/16
3/16
TYP.
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND
THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF
ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO
REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR
CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR
IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 S-107
PARTIAL FRAMING PLANS AND
DETAILS
506-CSI-113SITE PREP ANGIO OR-6
ALM SJT
1E
REVISIONS: DATE:
3/8" = 1'-0"
PARTIAL FRAMING PLAN - SEVENTH FLOOR (EXISTING)
1 1/2" = 1'-0"1 BEAM REINFORCEMENT DETAIL
3/8" = 1'-0"
PARTIAL FRAMING PLAN - FIFTH FLOOR (EXISTING)
3/4" = 1'-0"2 FLOOR PLATE DETAIL
1.
2.
3.
4.
5.
6.
7.
EXISTING COMPOSITE BEAMS MARKED ON THIS SHEET REQUIRE REINFORCEMENT TO
SUPPORT NEW CEILING MOUNTED EQUIPMENT LOADS. SEE TYPICAL DETAIL PER PLAN.
COMPOSITE BEAMS ANALYZED PER LOADING INFORMATION ON EXISTING DRAWINGS
DATED 11/22/95.
REINFORCEMENT BARS (MIN. 5'-0" LENGTHS) TO BE SPLICED ALONG BEAM WITH 6" FILLET
WELD AT ENDS, BOTH SIDES OF BAR, TYPICAL.
PROTECT EXISTING UTILITIES, ETC., WHEN INSTALLING REINFORCEMENT. PROTECT
HANGER RODS ON BOTTOM FLANGE OF COMPOSITE BEAMS.
SPACES DIRECTLY ABOVE AREA OF REINFORCEMENT MUST BE UNOCCUPIED DURING
WELDING.
NOTIFY THE ENGINEER OF RECORD IF CONFLICTS OCCUR OR EXISTING CONDITIONS DO
NOT ALLOW FOR INSTALLATION OF REINFORCING BAR.
REINFORCEMENT ON THIS SHEET MUST BE IN PLACE PRIOR TO INSTALLING EQUIPMENT ON
EACH FLOOR.
REINFORCEMENT INSTALLATION NOTES
1 1/2" = 1'-0"3 BEAM CONNECTION DETAIL
MOUNTING HEIGHT
COORDINATION
ARCHITECTURAL, MECHANICAL & ELECTRICAL
TRADES SHALL COORDINATE LOCATIONS OF
WALL MOUNTED ITEMS TO ALIGN EITHER
VERTICALLY OR HORIZONTALLY.
FINISH FLOOR LINE
DRAWING REFERENCE SYMBOLS
DETAIL REFERENCE
ENLARGED DETAIL
WALL SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
EXISTING COLUMN LINE
NEW COLUMN LINE
VIEWNUMBER
SHEETNUMBER
VIEWNUMBER
SHEETNUMBER
A-201
A
H
F
DTL./ELEV./SECTION
REFERENCE
DETAIL/ELEV./SECTION #
SHEET ORIGIN
BUILDING SECTION
A-200
A-200
A-200
A-200
MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED ON INT. ELEV., HVAC, OR ELECTRICAL DRAWINGS)
MAX.
REACH
DEPTH
MAX.
REACH
HEIGHT
0.5"
48"
2"
46"
5"
42"
6"
40"
9"
36"
11"
34"
GENERAL MAXIMUM REACH DEPTH AND HEIGHT
FOR HAND DRYERS / TOWEL DISPENSERS
MAX. REACH DEPTH
F O
R R
E A
C H
D E
P T
H M
A X
H
E
IG
H T
M
IR
R O
R
O R
M
IR
R
O R
S
H E
LF
U .N
.O
(M
A X
(M
IN
.) U
.N .O
T O
W E
L D
IS
P
E N
S E
M U
LT
I-
P U
R P
O S
U
IT
T O
W E
L D
IS
P
E N
S
E C
E P
T A
C
LE
W A
S T
C E
P T
A C
LE
T A
C K
B D
W H
IT
E
B D
U
.N .O
W A
LL
C
A B
IN
E
T
C O
A T
H O
O K
S
S A
N
IT
A R
Y N
A P
K
IN
V
N
D O
R
S O
A P
D
IS
P
E N
S E
R
2'
6"
M A
X
12"
M O
P S
T R
IP
E
LF
A D
A S
H E
LF
C
A
T R
O D
12"
S T
A N
D A
E
LF
A
T R
O D
M A
X
24"
BOTTOM OF
OUTLET
BOTTOM OF
LIGHT FIXTURE
M
A X
24" MIN.
36" MAX.
M
IN
M
IN
24" MIN.
42" MAX.
M
A X
36" MAX.
M
IN
24" MIN.
42" MAX.
/2
M
IN
P R
O T
R U
D
G
IL
E
T P
A P
P
E N
S
LO
A T
IO
N
R E
C E
S S
IL
E T
P A
P
P E
N S
A
T
IO
N
P R
O T
R U
D
IL
E
T P
A P
P
E N
S
A T
IO
N
M
IN
7"-9"
M
A X
S A
N
IT
A
Y
P K
P O
S A
L
22"
/2
M
IN
P R
O T
R U
D
IL
E
T P
A P
P
E N
S
A T
IO
N
S
3"
DOOR
FRAME
DOOR
FRAME
EXIT
T Y
P
IC
A L
LI
G
IT
A
T
IO
N
E X
IT
L
IG
H
B O
V E
D O
O R
S
E
LE
V A
T O
R W
LL
B
T
T O
N S
(M
IN
S E
E E
L E
C T
R
IC
A L
U
.N .O
E
LE
C T
R
IC
N
E L
C A
B
IN
E T
P O
W E
R P
A N
E L
E
LE
C T
R
IC
T
E
LE
P H
O N
E O
R
T
LE
T
S W
IT
C
H
P U
S H
B U
T T
O N
F
IR
E A
LA
R
M B
O X
T H
E R
M O
S T
A T
C A
R D
R E
A D
E R
M E
C H
A N
IC
A
L P
A N
E
LS
I
F
IS
H E
D S
P A
C E
S
S E
LE
C
T O
R S
W
IT
C H
R
S
S W
IT
C
H O
R W
LL
T
LE
T
A B
O
B
IN
E T
DOORSS
M
A X
M
A X
B A
R R
IE
E
E S
IG
N
IN
T E
R
IO
R
T A
C T
IL
E
B
R A
IL
LE
IG
N
A G
E
LA
Q U
E
M
IN
O R
U
.N .O
V A
R
IE
S S
E E
I N
T E
R
IO
R E
L E
V A
T
IO
N
F
IR
E A
LA
M
R N
R
O B
E
C
LO
C K
SEE PLAN
12" 12"
H A
N D
R A
IL
R A
M P
M
A X
T O
T O
P O
F
C A
B
IN
E T
H A
N D
L E
T
O
F
IR
E E
X T
IN
G
U
IS
H E
R
F
IR
E E
X T
IN
G
U
IS
H
B
IN
E T
F
IR
E
H O
S E
O
R C
O M
B
IN
A T
IO
B
IN
E
T
54" MIN.
18" GRAB BAR
42" GRAB BAR
M A
X
6" MAX. 36"
(MIN.)
18"
36" GRAB
BAR
40"
13" MAX.
42" 42"
W A
T E
R C
LO
S
E T
W A
T E
R C
LO
S
E T
(M A
X
(M
A X
B .F
U
R
IN
A L
S T
D . U
R
IN
A L
L-SHAPED
GRAB BAR
18"
T R
A N
S F
E R
T
Y P
E S
H O
W E
R
FOLDING
SHOWER SEAT
R O
LL
-I
N -T
Y
O W
E R
M
IN
T R
A N
S F
E R
T
Y P
E S
H O
W E
R
(M
IN
(M A
X
T O
P S
P O
U T
M A
X
S
IN
K D
E P
T H
11"
(MIN.)
17"
3" (MAX.)
WALL
SPACE
AVAILABLE
U.N.O.
NOTE:
WATER SUPPLY & DRAIN
PIPES BELOW LAVATORIES
AND SINKS MUST BE
INSULATED OR OTHERWISE
CONFIGURED TO PROTECT
AGAINST CONTACT.
E W
C
IN
K
U
N T
A
IN
W A
LL
H
U N
G L
A V
B A
R R
IE
E
E L
A
U N
T E
R
M
IN
MAX.
4"
6" MAX.
ALIGN WITH EDGE OF SEAT
M
IN
M
IN
E X
T
IN
G U
IS
H
E R
A N
D /O
R C
E N
T E
R O
F H
O S
E V
A
LV
E
T1 - TYPICAL TEMPORARY
CONSTRUCTION PARTITION
NOT TO SCALE
UNDERSIDE OF EXISTING
DECK
1 HR RATED TEMPORARY
PARTITION. HI-IMPACT 5/8"
GYP. BOARD ON 4" METAL
STUDS. FINISH OCCUPIED
SIDE PER ROOM FINISH
SCHEDULE
PLASTER TAPE ALL GYP. BD.
JOINTS. SECURE ALL TAPE
WITH RAM-TACK HIGH TACK
SPRAY OR EQUAL.
OCCUPIED SIDE
RENOVATION SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
COMPRESSIBLE
INSULATION
SEAL PERIMETER
COMPRESSIBLE
INSULATION
SEAL PERIMETER
MECHANICALLY FASTEN
BOTTOM TRACK TO FLOOR
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 A-001
ARCHITECTURAL LEGENDS,
SYMBOLS, AND ABBREVIATIONS
506-CSI-113SITE PREP ANGIO OR-6
TPM MRB
1E
ARCHITECTURAL...
ABBREVIATI
ON FULL TEXT
S
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKETS
SC SOLID CORE
SCH SCHEDULE
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD
SECT SECTION
SER.RECPT SERVICE RECEPTOR
SH SHELF
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SLR CONCRETE SEALER
SLS SOLID SURFACE
SLV SHORT LEG VERTICAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
SSM SOLID SURFACING MATERIAL
STD STANDARD
STDW STANDARD WEIGHT (STEEL PIPE)
STL STEEL
STOR STORAGE
STRL STRUCTURAL
SUPP SUPPORT
SUSP SUSPENDED
SYM SUSPENSION SYMMETRICAL
T
T TREAD
T&G TONGUE AND GROOVE
T.O.C. OR T/C TOP OF CONCRETE
T.O.F. OR T/F TOP OF FOOTING
T.O.M. OR T/M TOP OF MASONRY
T.O.P. OR T/P TOP OF PAVEMENT
T.O.S. OR T/S TOP OF STEEL
T.O.W. OR T/W TOP OF WALL
T/ TOP OF
TB TRUSS BEARING
TG TEMPERED GLASS
THK THICK
THRESH THRESHOLD
TLT TOILET
TP TOILET PARTITION
TR TRANSITION TRIM
TYP TYPICAL
TYP TYPICAL
U
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCO WALL CLEAN OUT
WCVR WALLCOVERING
WD WOOD
WP WATERPROOFING
WP WORKPOINT
WS WINDOW SHADE
WSCT WAINSCOT
WT WEIGHT
ARCHITECTURAL...
ABBREVIATI
ON FULL TEXT
H
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD
HDPB HIGH DENSITY PARTICLEBOARD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HWD HARDWARE
I
I.D. OR ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IG INSULATING GLASS
IN INCHES
INCL INCLUDING, INCLUSIVE
INSUL INSULATION
INT INTERIOR
IPS INTERIOR PAINT SYSTEM
J
JAN JANITOR
JT JOINT
K kW KILOWATTS kWh KILOWATT HOURS
L
LAD LADDER
LAM LAMINATED
LAV LAVATORY
LF LINEAR FEET
LGTH LENGTH
LH LEFT HAND
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOUVER OPENING
LP LIGHTING PANEL
LPG LIQUID PETROLEUM GAS
LPS LOW PRESSURE STEAM
LT LIGHT
LWT LEAVING WATER TEMPERATURE
M
MA MEDICAL AIR
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MBH THOUSAND BTU/HR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPACITY
MCC MULTI-COLOR COATING
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMBWP MEMBRANE WATERPROOFING
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFS MAXIMUM FUSE SIZE
MG MEDICAL GAS
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MM MISCELLANEOUS METALS
MO MASONRY OPENING
MOCP MAXIMUM OVERCRRENT PROTECTION
MPC MICHIGAN PLUMBING CODE
MR MANUFACTURER'S RECOMMENDATIONS
MT MARBLE TILE
MTD MOUNTED
MUL. MULLION
N
N NORTH
N.S. NEAR SIDE
NF NO FINISH
NIC NOT IN CONTRACT
NO NUMBER
NPSH NET POSITIVE SUCTION HEAD
NSNS NON SHRINK NON STAIN GROUT
NTS NOT TO SCALE
NTS NOT TO SCALE
O
O.C. OR OC ON CENTER
OBSGL OBSCURE GLASS
OD OUTSIDE DIAMETER
OHDR SECTIONAL OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
P
P PAINT
PART PARTITION
PB PARTICLE BOARD
PC PRECAST
PCS PIECES
PERM PERMANENT
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLY PLYWOOD
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
Q
QT QUARRY TILE
QTB QUARTZ TILE BASE
QTZ QUARTZ
R
R RISER
RA RETURN AIR
RB RUBBER BASE
RC ROOF CONDUCTOR
RD ROOF DRAIN
RD ROUND
RECVG RECEIVING
REF REFRIGERATOR
REINF REINFORCED
REQ'D REQUIRED
RF RESILIENT FLOORING
RH RIGHT HAND
RL ROOF LADDER
RM ROOM
RO ROUGH OPENING
RS ROOF SUMP
RWD REDWOOD
ARCHITECTURAL...
ABBREVIATI
ON FULL TEXT
A
AB ANCHOR BOLT
ABI ADDITIVE BID ITEM
AC ACOUSTICAL
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS DOORS
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AWP ACOUSTICAL WALL PANEL
B
B/ BOTTOM OF
BD BOARD
BF BARRIER FREE
BIT BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLKHD BULKHEAD
BOTT BOTTOM
BP BASE PLATE
BS BOTH SIDES
BUR BUILT UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CG CORNER GUARD
CH CHANNEL
CHKDPL CHECKERED PLATE
CJ CONTROL JOINT
CL CENTERLINE
CL TO CL CENTERLINE TO CENTERLINE
CLG CEILING
CLK CAULKING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CASED OPENING OR CLEAN OUT
COL COLUMN
COMP COMPRESSIBLE
COMPO COMPOSITION
CONC CONCRETE
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET TILE
CTR COUNTER
CTSK COUNTERSINK
D
DEXS DOUBLE EXTRA STRONG (STEEL PIPE)
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWN SPOUT
DT DRAIN TILE
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEMS
EJ EXPANSION JOINT
EL ELEVATION
ELECT ELECTRICAL
ELEV ELEVATOR OR ELEVATION
ENCL ENCLOSURE
EP EPOXY PAINT
EPS EXTERIOR PAINT SYSTEM
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EX EXISTING
EXGR EXISTING GRADE
EXP EXPANSION
EXS EXTRA STRONG (STEEL PIPE)
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC/UPHOLSTERY
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FLL FLOOR LINE
FLUOR FLUORESCENT
FOC FACE OF COLUMN
FOCONC FACE OF CONCRETE
FRC FIBER REINFORCED CONCRETE
FRP FIELD REINFORCED PANEL
FRPFG FIREPROOFING
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FV FIELD VERIFY
G
G.B. GRAB BAR, GRADE BEAM
G.O. GRILL OPENING
GA GAUGE
GALV GALVANIZED
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS
GND. GROUND
GR. GRADE
GRTG. GRATING
GSCFT GLAZED STRUCTURAL CLAY FACING TILE
GT GROUT
GYP. BD. GYPSUM BOARD
DEMO PLAN LEGEND:
EXISTING WALL OR PARTITION
TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING BUILDING COMPONENT
& STRUCTURE TO REMAIN
EXISTING WALL/PARTITION OR
EXISTING ITEMS TO BE REMOVED
EXISTING DOOR & FRAME TO BE
REMOVED
EXISTING ASSEMBLY TO BE
REMOVED
NOTE: ALL ITEMS SHOWN DARK
AND DASHED ARE TO BE
DEMOLISHED- U.N.O.
GENERAL DEMOLITION NOTES:
1. ALL EXISTING LOOSE MATERIALS, FURNITURE, PORTABLE ELECTRONIC DEVICES AND EQUIPMENT TO
BE RETAINED BY THE OWNER WILL BE MOVED PRIOR TO DEMOLITION.
2. REFER TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION DRAWINGS, AND SPECIFICATION SECTION 017000 (EXECUTION REQUIREMENTS) FOR
OTHER DEMOLITION NOTES AND INFORMATION.
3. SHORE AND BRACE ALL WORK REQUIRED TO REMAIN.
4. THE CONTRACTOR SHALL FIELD VERIFY EXACT DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO
START OF WORK.
5. DOCUMENTS ARE BASED ON OWNER'S RECORD DRAWINGS AND ARE SHOWN TO ASSIST THE
BIDDERS ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL VISIT THE SITE PRIOR TO SUBMITTING BID AND BECOME FAMILIAR WITH ALL CONDITIONS AND NEW WORK. NOTIFY ARCHITECT IMMEDIATELY
OF DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.
6. ALL DISTURBED SURFACES TO BE PATCHED/ REPAIRED TO RECEIVE NEW FINISHES IN A LIKE-NEW
CONDITION TO MATCH ADJACENT FINISH.
7. ALL EXISTING ATTACHED ITEMS (WALL GUARDS, SWITCHES, ETC.) AND EQUIPMENT TO BE RETAINED
ARE TO BE REMOVED AND REINSTALLED BY CONTRACTOR UPON COMPLETION OF FINISHING WORK.
8. ANY ITEMS LEFT IN DEMOLITION AREAS WILL BECOME THE PROPERTY OF DEMOLITION CONTRACTOR
FOR THEIR OFF-SITE DISPOSAL AT THE CONTRACTOR'S EXPENSE. CONSTRUCTION MANAGER TO
COORDINATE DEMOLITION WORK WITH OWNER AND CONTRACTOR PRIOR TO START OF WORK.
9. CONDUITS, CONDUCTORS AND FEEDERS TO ALL ELECTRICAL LOADS BEING DEMOLISHED ARE TO BE REMOVED BACK TO THEIR SOURCE IN ACCORDANCE WITH THE N.E.C. THIS IS TO INCLUDE POWER, LIGHTING CONTROLS, AND ALL COMMUNICATION SYSTEMS.
10. COORDINATE WITH PLUMBING AND MED. GAS CONTRACTORS IN SELECTIVE REMOVAL OF VENTS, WASTE PIPING, RAIN WATER CONDUCTORS AND MED. GAS PIPING IN AREA AFFECTED BY THE WORK.
REFER ALSO TO PLUMBING DEMO DRAWINGS.
11. PATCH/REPAIR/REPLACE ALL MATERIALS AFFECTED BY RENOVATION TO MATCH ORIGINAL EXISTING
MATERIAL, FINISH, COLOR, ETC., U.N.O.
12. PATCH, REPAIR, REPLACE EXISTING MATERIALS AS REQUIRED TO RECEIVE NEW FINISHES.
13. REFER TO FLOOR PLAN FOR DIMENSIONS AND OTHER INFORMATION NOT SHOWN HERE.
14. ALL ITEMS TO BE REMOVED ARE SHOWN DARKER AND DASHED, U.N.O.
E-F E-G
CLEAN &
STERILE
SUPPLY
D515
SPECIAL OR
NO.6
(VASCULAR)
D521
SCRUB
ALCOVE
D521D
CONTROL
ROOM
D521B
EQUIPMENT
D521C
OR 5
D522
CORRIDOR
C5-14
CORRIDOR
C5-12
CORRIDOR
C5-13
SUB-STERILE
D521A
D9
D9
D9
D9
D E
M O
E X
IS
T
R
E M
A
IN
D9
SUPPLY
D523
D20
D20 D20
D20
D20
D20
D27
D27
D19
D9
D19
D7
D13
D19
PATCH AND REPAIR WALL AS
REQ'D TO MAKE LIKE NEW,
PREPARE WALL FOR NEW WALL
FINISH
D19
D25
D19
D19
D19
D19
D28
D7
D7 D15
D15
D15
D15
E-F E-G
CLEAN &
STERILE
SUPPLY
D515
SCRUB
ALCOVE
D521D
EQUIPMENT
D521C
CONTROL
ROOM
D521B
SUB-STERILE
D521A
SPECIAL OR
NO.6
(VASCULAR)
D521
OR 5
D522
CORRIDOR
C5-14
CORRIDOR
C5-12
CORRIDOR
C5-13
NEW 30" DEEP, 1/2" SSM-1 OVER 3/4" PARTICLE BOARD
COUNTERTOP, MATCH EXISTING HEIGHT (CONTRACTOR
TO VERIFY IN FIELD). PROVIDE (3) 4" GROMMETS AS
SHOWN. PROVIDE (2) NEW METAL SUPPORT BRACKETS,
SPACED EQUALLY.
VERIFY IN FIELD
9' - 5 5/8" +/-
PATCH HOLE IN WALL,
PROVIDE GYP. BD. TO
MATCH EXISTING
THICKNESS
SUPPLY
D523
N E
W E
X
IS
T
R E
M A
IN
0"
10' - 2"
C 5-
.1
C 5-
.1
T1
T1
PATCH AND
REPAIR WALL
PATCH AND
REPAIR WALL PATCH AND
REPAIR WALL
1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER TRADES.
2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC., SHALL BE
VERIFIED WITH THE ARCHITECT/ ENGINEER OR THE STRICTEST PROVISIONS
SHALL GOVERN.
3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME
NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS
SHALL BE VERIFIED WITH ARCHITECT/ ENGINEER PRIOR TO CONSTRUCTION OF
THAT AREA.
4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR
DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH ARCHITECT.
5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE
CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,
ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT
INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE
ARCHITECT FOR REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR
CONSTRUCTION.
6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO REVIEW
ENTIRE SET OF CONSTRUCTION DOCUMENTS (DRAWINGS & SPECIFICATIONS)
AND SHALL COORDINATE WORK BETWEEN ALL TRADES. IF CONFLICTS ARISE
DUE TO COORDINATION OF TRADES, CM / GC IS TO VERIFY CONFLICT WITH
ARCHITECT / ENGINEER PRIOR TO CONSTRUCTION / INSTALLATION OF
CONFLICTING ITEMS.
7. REMODELING OR PATCHING SHALL BE EXECUTED IN CONJUNCTION WITH THE
NEW WORK AND THE DEMOLITION WORK IN THE DRAWINGS.
8. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE ATTACHED OR
IMBEDDED ITEMS WERE REMOVED.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE
FLOORS, WALLS, AND CEILINGS FOR NEW FINISHES.
10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF EXISTING FLOOR
COVERING AND PREP FLOOR W/CONCRETE (OR FLORSTONE) AS NECESSARY TO
ACCOMMODATE NEW FLOOR COVERINGS.
11. U.N.O. PATCH AND PREPARE FLOOR W/CONCRETE (OR FLORSTONE) FLUSH
WITH ADJACENT FLOOR SURFACE. FILL ANY SLOPING OR RECESSED AREAS
LEVEL TO TYPICAL FINISH FLOOR ELEVATION TO ACCOMMODATE NEW FLOOR
COVERINGS.
12. FILL-IN EXISTING CHASE OPENINGS, PENETRATIONS IN THE FLOOR AND CEILING
DECK. FIRE-RATING OF NEW CONSTRUCTION TO MATCH EXISTING. REFER TO
DRAWINGS FOR DETAILS.
GENERAL NOTES:
13. WHEN REMOVING DEBRIS FROM CONSTRUCTION AREA WIPE OFF WHEELS
BEFORE LEAVING CONSTRUCTION AREA AND USE WET RAGS OVER DUMPSTER
TO REDUCE DUST.THE OWNER RESERVES THE RIGHT TO HALT CONSTRUCTION
ACTIVITY AT ANY TIME DUE TO NOISE AND VIBRATION WHICH MIGHT EFFECT
THE OWNER'S ONGOING USE OF THE FACILITY.
14. CONTRACTOR SHALL REINSTALL CEILING SYSTEM AND PATCH FINISHES AT
FLOOR BELOW AND ABOVE WHERE WORK IMPACTS EXISTING ASSEMBLIES.
FINISH/PAINT SURFACES TO MATCH EXISTING FINISH.
15. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR CONCRETE TO FACE OF
FINISH, CMU, OR CONCRETE, U.N.O.
16. COORDINATE LOCATION OF ALL RECESSED OR IMBEDDED ITEMS SO AS NOT TO
INTERFERE WITH OTHER TRADE'S WORK.
17. MAINTAIN WALL FIRE RATING BEHIND RECESSED ACCESSORIES & EQUIPMENT.
18. ADDITIONS OF OPENINGS, PENETRATIONS OR EMBEDMENTS IN THE FIELD
SHALL BE FIRST VERIFIED WITH ARCHITECT / ENGINEER.
19. PROVIDE NEOPRENE OR VINYL ISOLATION MATERIAL BETWEEN DISSIMILAR
METALS THAT ARE IN CONTACT WITH ONE ANOTHER, TYPICAL.
20. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE TO
DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.
21. PROVIDE SOLID, CONTINUOUS BLOCKING IN WALL AT ALL LOCATIONS WHERE
ALL MILLWORK, PLUMBING FIXTURES, EQUIP., ETC. ATTACH TO WALL.
22. WHERE GYPSUM BOARD ABUTS DISSIMILAR MATERIALS, USE METAL DRYWALL
EDGE BEAD AND SEALANT WITH BACKER ROD.
23. ALL HEADERS ABOVE OPENINGS, DOORS & BORROWED LITES IN NON-LOAD
BEARING INTERIOR METAL STUD WALLS SHALL BE (2) 8" 18 GA. JOISTS (UNLESS
OTHERWISE NOTED)
24. PAINT ALL EXPOSED LINTELS (TYP.)
25. WHERE RECESSED EQUIPMENT IS INSTALLED IN UNEVEN SURFACED MATERIAL,
USE SMOOTH SURFACED MATERIAL ABOUT PERIMETER SO THAT EQUIPMENT
LAYS FLUSH AND EVEN. COORDINATE WITH EQUIPMENT MANUFACTURER.
26. ALL BLOCKING SHALL BE FIRE RETARDANT TREATED WOOD OR MADE OF NON-
COMBUSTIBLE MATERIAL.
ROOM FINISH GENERAL NOTES
1. ELECTRICAL DEVICES SUCH AS PLUG MOLDS, CHASES, PANELS, ETC. SHALL
BE PAINTED TO MATCH ADJACENT WALL COLOR.
2. ANY EXPOSED MECHANICAL GRILLES, METAL PANELS, TRIM DEVICES SHALL
BE PAINTED TO MATCH ADJACENT SURFACE COLOR.
3. INTERIOR HOLLOW METAL DOORS, DOOR FRAMES, AND WINDOW FRAMES
SHALL BE PAINTED TO MATCH ADJACENT WALL COLOR. DOOR FRAME
COLOR CHANGES SHALL OCCUR ON STOP AS IF DOOR IS IN CLOSED
POSITION WITH THE DOOR AND FRAME SHOWING AS ONE COLOR.
4. WOOD DOORS, DOOR FRAMES AND WINDOW FRAMES SHALL BE STAINED.
5. FLOORING TRANSITIONS SHALL BE CENTERED UNDER DOOR WHILE IN
CLOSED POSITION. PROVIDE TRANSITION STRIP BETWEEN ALL FLOORING
MATERIAL TRANSITIONS.
6. GYP. BD. CEILINGS AND BULKHEADS TO BE PAINTED, U.N.O.
7. SEE FLOOR PLANS FOR LOCATIONS OF CORNER GUARDS.
8. CONVECTOR, CABINET UNIT HEATERS AND FIN-TUBE UNITS SHALL BE
PAINTED TO MATCH ADJACENT WALL COLOR, U.N.O.
PLAN NOTES
REPLACE SALVAGED HANDRAIL / BUMPER GUARD AFTER APPLYING
NEW FINISHES.
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 A-105
PARTIAL DEMOLITION & FLOOR
PLANS
506-CSI-113SITE PREP ANGIO OR-6
TPM MRB
1E
1/4" = 1'-0"
PARTIAL FIFTH FLOOR DEMOLITION PLAN
DEMOLITION KEY
KEY VALUE KEYNOTE TEXT
D7 REMOVE EXISTING CEILING INCLUDING ALL BRACKETS, ANCHORS & SUPPORTS. PATCH AND REPAIR
ADJACENT SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR
PROPER INSTALLATION OF NEW FINISHES. PROVIDE NEW CEILING TILES FOR ANY ADJACENT TILES
THAT ARE TO REMAIN, THAT ARE DAMAGED DURING DEMOLITION.
D9 REMOVE EXISTING FINISH FLOOR MATERIALS AND WALL BASE AND ADHESIVE/MORTAR AS REQUIRED FOR PROPER INSTALLATION OF NEW FLOOR FINISH. PATCH AND REPAIR ADJACENT WALL/FLOOR
SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER
INSTALLATION OF NEW FINISHES.
D13 REMOVE EXISTING COUNTERTOP AND ALL ASSOCIATED WALL AND SUPPORT BRACKETS. PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED
FOR PROPER INSTALLATION OF NEW FINISHES OR CASEWORK. ETC.
D15 REMOVE AND SALVAGE FOR REINSTALLATION ALL EXISTING HANDRAIL & BUMPER RAILS. PATCH AND REPAIR AREA OF REMOVAL AS REQ'D. CONTRACTOR TO VERIFY QUANTITIES AND LENGTHS IN FIELD.
D19 REMOVE EXISTING ELECTRICAL FIXTURES AND ANY ASSOCIATED CONDUIT, WIRING, AND ANCHORS AS NECESSARY FOR INSTALLATION OF NEW FIXTURES. COORDINATE WITH ELECTRICAL DRAWINGS.
D20 REMOVE, SALVAGE AND RETURN TO OWNER EXISTING MEDICAL EQUIPMENT. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFORMATION.
D25 REMOVE EXISTING UNISTRUT AND UNISTRUT UNIVERSAL GRID SYSTEM.
D27 REMOVE EXISTING CEILING ACCESS PANEL.
D28 REMOVE EXISTING MECHANICAL EQUIPMENT. PATCH AND REPAIR ADJACENT SURFACES AT AREAS
OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
1/4" = 1'-0"
PARTIAL FIFTH LEVEL FLOOR PLAN
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR WALL DOOR
FRAME
CEILING MILLWORK
FINISH NOTESFINISH BASE NORTH SOUTH EAST WEST FINISH BULKHEAD CABINET COUNTER
05.0
D521 SPECIAL OR NO.6 (VASCULAR) RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- --
D521A SUB-STERILE RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- --
D521B CONTROL ROOM RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- SSM-1
D521C EQUIPMENT RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- --
D521D SCRUB ALCOVE RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- --
D523 SUPPLY RS-1 -- P-1 P-1 P-1 P-1 P-2 P-1 -- -- --
CODE USE MANUFACTURER STYLE SIZE COLOR PATTERN FINISH NOTES
RESILIENT
RF-1 FLOORS TARKETT IQ OPTIMA - 3242246 EGYPTIAN SCROLLS 4" FLASH COVE BASE, WELD ROD: 1290290
PAINT
P-1 WALLS / CEILINGS GRAHAM - - PLUM BLACK WHITE -
P-2 DOORS ANDERSON - - CERAMIC COAT A-151510 - DEEP BASE
SOLID SURFACE
SSM-1 WORKSURFACES FORMICA - - LUNA SAND 757 -
E-F E-G
SPECIAL OR
NO.6
(VASCULAR)
D521
SUB-STERILE
D521A
EQUIPMENT
D521C
CONTROL
ROOM
D521B
SCRUB
ALCOVE
D521D
CLEAN &
STERILE
SUPPLY
D515
CORRIDOR
C5-13
OR 5
D522
CORRIDOR
C5-14
CORRIDOR
C5-12
SUPPLY
D523
10' - 2"
0"
REFLECTED CEILING PLAN GENERAL NOTES:
1. SEE MECHANICAL & ELECTRICAL DRAWINGS FOR OTHER APPLICABLE
NOTES & ITEMS.
2. ALL CEILING GRIDS ARE TO BE CENTERED IN THE SPACE IN BOTH
DIRECTIONS (AS SHOWN) UNLESS NOTED OTHERWISE.
3. ALL AREAS EXPOSED TO VIEW ABOVE THE CEILINGS ARE TO BE PAINTED.
REFER TO INTERIORS DOCUMENTS FOR COLOR OR SUBMIT RFI.
4. CEILING HEIGHTS SHOWN ARE GENERIC IN NATURE, ADJUST HEIGHT 1"-2"
AS REQUIRED TO BE SLIGHTLY ABOVE OR BELOW A MASONRY JOINT
WHERE APPLICABLE.
5. ALL EXPOSED STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL
ELEMENTS ARE TO BE PAINTED. REFER TO INTERIORS DOCUMENTS FOR
COLOR OR SUBMIT RFI.
REFLECTED CEILING PLAN LEGEND:
SUPPLY DIFFUSER
TRANSFER GRILL AND/OR EXHAUST FAN
2'x4' LIGHT FIXTURE
2'x2' LIGHT FIXTURE
EX. CEILING HEIGHT- ABOVE FINISH FLOOR
CEILING HEIGHT- ABOVE FINISH FLOOR
2X2 ACOUSTIC CEILING PANEL
EXISTING 2X2 ACOUSTIC CEILING PANEL
GYPSUM BOARD
EXPOSED
RECESSED ROUND LIGHT FIXTURE
(EMERGENCY FIXTURES SHADED)
S SPEAKER LOCATION
(SEE ELECTRICAL COMMUNICATIONS)
C
FIRE EXIT SIGN LOCATION
CAMERA LOCATION
(SEE ELECTRICAL COMMUNICATIONS)
1'x4' LINEAR LIGHT FIXTURE
SPRINKLER LOCATION
(SEE FIRE PROTECTION DRAWINGS)
LINEAR DIFFUSER DIFFUSER
X'-X
X'-X
PIR
PASSIVE INFRARED SENSOR, TYP. - BY
FULLY INTERGRATED MODULAR CEILING
SYSTEM
US
ULTRASONIC SENSOR SENSOR, TYP. -
BY FULLY INTERGRATED MODULAR
CEILING SYSTEM
E-F E-G
SPECIAL OR
NO.6
(VASCULAR)
D521
SUB-STERILE
D521A
EQUIPMENT
D521C
CONTROL
ROOM
D521B
SCRUB
ALCOVE
D521D
CLEAN &
STERILE
SUPPLY
D515
CORRIDOR
C5-13
OR 5
D522
CORRIDOR
C5-14
CORRIDOR
C5-12 9' - 6 3/16"
24"X24" CEILING ACCESS PANEL,
TYP., CENTER AS SHOWN TO FULLY
INTERGRATED MODULAR CEILING
SYSTEM
SUPPLY
D523
10' - 2"
0"
6' - 3" 5' - 6"
7'
7" 2'
5"
7'
0"
4'
8" 1'
EQ EQ
PIR
US
PIR
PIR
A-115
TYP.
MATCH EXISTING
EQ-26
SEE EQUIPMENT
DRAWINGS
PATCH AND REPAIR
CEILING TO MATCH
EXISTING, PREPARE
FOR NEW FINISH
9' - 0" V.I.F
OPENING REQUIREMENTS
SEE MANUFACTURER'S
EQUIPMENT CEILING COVER - BY OTHERS
MOUNTING PLATE BY OTHERS
THREADED ROD BY OTHERS
BOOM SUPPORT BY FULLY INTERGRATED
MODULAR CEILING SYSTEM - CONTRACTOR
TO COORDINATE BETWEEN FULLY
INTERGRATED MODULAR CEILING SYSTEM
AND EQUIPMENT BOOM VENDORS FOR
STRUCTURAL SUPPORT NEEDS AND
INSTALLATION
FULLY INTERGRATED MODULAR
CEILING SYSTEM
MECHANICAL LOUVER BY FULLY
INTERGRATED MODULAR CEILING
SYSTEM
LIGHT BY FULLY INTERGRATED
MODULAR CEILING SYSTEM
16 GA. POWDER COATED ANGLE BY FULLY
INTERGRATED MODULAR CEILING SYSTEM
5/8" TYPE 'X' GYPSUM BOARD CEILING SYSTEM
5/8" TYPE 'X' GYPSUM BOARD
SUSPENDED CEILING SYSTEM
FIXTURE HUB BY OTHERS
3"
BOTTOM OF CEILING
SEE REFLECTED CEILING PLAN
PROVIDE SEALANT ALONG ENTIRE PERIMETER
OF FULLY INTERGRATED MODULAR CEILING
SYSTEM
CL
SEE REFLECTED CEILING PLAN FOR
LOCATION OF EQUIPMENT
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 A-115
PARTIAL REFLECTED CEILING
PLANS
506-CSI-113SITE PREP ANGIO OR-6
TPM MRB
1E
1/4" = 1'-0"
PARTIAL FIFTH LEVEL REFLECTED CEILING PLAN - EQUIPMENT
1/4" = 1'-0"
PARTIAL FIFTH LEVEL REFLECTED CEILING PLAN
1 1/2" = 1'-0"A-115
1 CEILING EDGE DETAIL
1. THIS DRAWING IS INCLUDED FOR REFERENCE
AND COORDINATION ONLY.
2. SEE EQUIPMENT RESPONSIBILITY MATRIX
BELOW FOR ADDITIONAL INFORMATION.
EQUIPMENT PLAN GENERAL NOTES
E-F E-G
CLEAN &
STERILE
SUPPLY
D515
SPECIAL OR
NO.6
(VASCULAR)
D521
SCRUB
ALCOVE
D521D CONTROL
ROOM
D521B
EQUIPMENT
D521C
SUB-STERILE
D521A
CORRIDOR
C5-14
CORRIDOR
C5-12
CORRIDOR
C5-13
OR 5
D522
EQ-16
EQ-17
EQ-18
EQ-19
EQ-2
EQ-3
EQ-4
EQ-5
EQ-6
EQ-7EQ-8
EQ-9
EQ-10EQ-11
EQ-12EQ-12
EQ-13
EQ-14EQ-14
EQ-15
EQ-15
EQ-15
EQ-1
EQ-1
EQ-1
EQ-1
E Q
-1
E Q
-1
E Q
-1
E Q
-1
E Q
-1
EQ-1
EQ-23
EQ-22
EQ-22
EQ-23
EQ-22
0"
EQ-23
EQ-23
EQ-1
EQ-1
EQ-25
EQ-25
EQ-25
EQ-1
EQ-1
EQ-1
EQ-24
EQ-26
COORDINATE EXACT PLACEMENT
OF NEW EQUIPMENT EQ-1 WITH
EXISTING MED GASES / OUTLETS,
ETC. TO REMAIN
HR-1
HR-1
HR-1
HR-1
S E
E D
O O
R S
C H
E D
U
LE
2"
2"
SCHEDULE
SEE DOOR 2"
F
FLUSH
SCHEDULE
SEE
S E
E S
C H
E D
U L
E
1. CONTRACTOR IS RESPONSIBLE TO CONTACT AND COORDINATE INSTALLATION OF EQUIPMENT PROVIDED BY VENDOR. ALL COMMUNICATION TO GO THROUGH PHILIPS
REPRESENTATIVE: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
2. REFER TO PROJECT MANUAL FOR VENDOR DOCUMENTS TO BE USED AS REFERENCE ONLY. CONTRACTOR TO CONTACT EQUIPMENT VENDOR FOR FINAL DOCUMENTATION TO ASSIST IN CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL SUPPORT UTILITIES TO ENSURE A FULLY FUNCTIONING SYSTEM. REFER TO MEP
DRAWINGS FOR MORE INFORMATION.
EQUIPMENT MATRIX NOTES
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020 A-125
PARTIAL EQUIPMENT PLAN 506-CSI-113SITE PREP ANGIO OR-6
TPM MRB
1E
EQUIPMENT RESPONSIBILITY MATRIX
EQUIP.
NUMBER DESCRIPTION SUPPLIED BY INSTALLED BY COMMENTS
EQ-1 PHILIPS HEALTHCARE - AZURION 7 FD20 CEILING VENDOR VENDOR NOTES 1, 2
EQ-2 PEDIGO GOVERNMENT GOVERNMENT
EQ-3 SUNOPTIC GOVERNMENT GOVERNMENT
EQ-4 ELECTROCAUTERY GOVERNMENT GOVERNMENT
EQ-5 UNICART BLUE BELL GOVERNMENT GOVERNMENT
EQ-6 DRAGER APOLLO GOVERNMENT GOVERNMENT
EQ-7 ANESTHESIA CART GOVERNMENT GOVERNMENT
EQ-8 BEAR HUGGER GOVERNMENT GOVERNMENT
EQ-9 OMNI-CELL GOVERNMENT GOVERNMENT
EQ-10 NEPTUNE GOVERNMENT GOVERNMENT
EQ-11 ULTRASOUND GOVERNMENT GOVERNMENT
EQ-12 SURGICAL STAND GOVERNMENT GOVERNMENT
EQ-13 VASCULAR CART GOVERNMENT GOVERNMENT
EQ-14 TABLE GOVERNMENT GOVERNMENT
EQ-15 LINEN / TRASH STAND GOVERNMENT GOVERNMENT
EQ-16 BOWL STAND GOVERNMENT GOVERNMENT
EQ-17 TABLE GOVERNMENT GOVERNMENT
EQ-18 TABLE GOVERNMENT GOVERNMENT
EQ-19 TABLE GOVERNMENT GOVERNMENT
EQ-22 SKYTRON SURGICAL LIGHT & BOOM CONTRACTOR CONTRACTOR SEE EQUIPMENT DRAWINGS
EQ-23 SKYTRON EQUIPMENT & BOOM - BASIS OF DESIGN CONTRACTOR CONTRACTOR SEE EQUIPMENT DRAWINGS
EQ-24 SKYTRON INTEGRATION RACK - BASIS OF DESIGN CONTRACTOR CONTRACTOR SEE EQUIPMENT DRAWINGS
EQ-25 GETINGE TRANSPORTER VENDOR VENDOR NOTES 1, 2
EQ-26 FULLY INTEGRATED MODULAR CEILING SYSTEM CONTRACTOR CONTRACTOR SEE EQUIPMENT DRAWINGS
1/4" = 1'-0"
PARTIAL FIFTH FLOOR EQUIPMENT PLAN
DOOR AND FRAME SCHEDULE
DOOR NO. ROOM NO. ROOM NAME
DOOR FRAME
FIRE
RATING
HARDWARE
SET NO. NOTES
SIZE
MATL TYPE MATL TYPE
DETAIL
WD. HGT HEAD JAMB SILL
C5-13.1 D521D SCRUB ALCOVE 3' - 0" 7' - 0" WD F HM 01 -- -- 45 TEMP DOOR, HARDWARE BY CONTRACTOR
C5-14.1 C5-14 CORRIDOR 3' - 0" 7' - 0" WD F HM 01 -- -- 45 TEMP DOOR, HARDWARE BY CONTRACTOR
1/4" = 1'-0"
FRAME TYPES
1/4" = 1'-0"
DOOR TYPES
architecture · engineering
E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020
EQ-1
EQUIPMENT DRAWINGS - FOR
REFERENCE ONLY
506-CSI-113SITE PREP ANGIO OR-6
TPM MRB
1E
E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
PHILIPS CONTACT: DON DUNHAM, DONALD.DUNHAM@PHILIPS.COM, 616.340.8554
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH PHILIPS AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH PHILIPS, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL AFFECT
THE OVERALL COMPLETION DATE.
100% BID DOCUMENTS
06/01/2020
EQ-2
EQUIPMENT DRAWINGS - FOR
REFERENCE ONLY
506-CSI-113SIT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .