5th floor ICRA plan.pdf
PDF 151 KB Posted
- Attached to
- Z1DA--CSI Site Prep Angio 0R-6 506-CSI-113
- Solicitation number
- 36C25021B0022
About this file
This document provides details for a federal construction contract opportunity for site preparation work at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The contract is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses and involves renovating operating room number six to accommodate new medical equipment. The contractor will be responsible for floor, wall and ceiling work along with utility preparations and ensuring the site is ready for a separate medical equipment vendor. The project is estimated to cost between $1 million and $2 million and have a performance period of 180 days. The solicitation for bids is expected to be issued on March 9, 2021 through the Contract Opportunities website. Interested parties should register through the website and monitor for any amendments to the pre-solicitation notice.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORRIDOR C5-3
C5-2
C5-1A
S-6
S-5
C500
MALE
TOILET
ELEVATOR
SERVICE
LOBBY
C5-1
STORAGE
EQUIPMENT
TICU
BATH
BATH
BATH
2BR
1BR
1BR
TOIL
STAFF
MED
STORAGE
FUTURE
SURGERY RESIDENTS
(VASCULAR)
CORRIDOR
CLEAN CORE
ROOM
CONTROL
ROOM
EQUIPMENT
X-RAY
SUB-STERILE
ALCOVE
SCRUB
ALCOVE
SCRUB
ALCOVE
SCRUB
STOR
SUB-STERILE
ALCOVE
SCRUB
OR
(CARDIAC)
SPECIAL OR NO 7
PUMP ROOM
(NEURO)
SPECIAL OR NO 8
ALCOVE
SCRUB
SUB-STERILE
SUPPLY
CLEAN & STERILE
STORAGE
CORRIDOR
STORAGE
GAS
STORAGE
EQUIPMENT
GENERAL OR 4GENERAL OR 5
1BR
TICU
1BR
TICU
1BR
TICU
IBR
TICU
SECRETARY/WAITING
SERVICE
SURGERY
CHIEF
BATH
PRESSURE ROOM
NEGATIVE
TOIL
STAFF
UTILITY
SOILED
ANTE ROOM
ISOLATION
HAC
ON CALL
TEAM ROOM
NURSE STATION
ELEC
VEST
STORAGE
CORRIDOR C5-7
CONFERENCE ROOM
EDUCATION/
PHARMACY
SURGERY RESIDENTS
TEAM
BURGUNDY
CORRIDOR
EMS
ELEVATOR
MAIN
LOBBY
FEMALE
TOILET
CLOS
COMM
CLOSET ELECTRICAL
SPECIAL OR NO 6
CLOSET
COMM
ELECTRICAL
MECHANICAL EQUIPMENT ROOM
C520
C503AC502A
D521
C5-6
D521B
D521C
D521A
D523D522
D521
D501B
D501A
D501
D503
D501
D516
D505
D505
D505B
D520
C5-8
D500
D502/D504
D523D522
C525
C527
C529 C531
C530B
C507A
C523
C524
C522
C519
C507
C526
C5-27A
C508
C504
C504A
C505
C506
C502
C503
C5-5
C501
D530B D530A
D530
B523
B521a
B543a
B545a
B547a
B543
B545
B547
S-16
EDUC. OFFICERME OFFICE
D506E
WORKSPACE
D506
O.R. MANAGER
D506A
TECH SUPR.
D506B
ASST.
NURSE MGR.
D506C
EXAM
D506D
STAIR #9
STAIR #3
C L
E A
N
C
O R
R I D
O R
CLEAN CORRIDOR
STAIR #6
FREIGHT ELEVATORS
AutoCAD SHX Text
HARD BARRIER
AutoCAD SHX Text
HARD BARRIER
AutoCAD SHX Text
HARD BARRIER W/
AutoCAD SHX Text
ANTE AREA
AutoCAD SHX Text DAILY CONTRACTOR PATH WILL BE THROUGH THE 4TH FLOOR INTERSTITIAL SPACE, UP STAIRWELL #6 TO THE BACK CORRIDOR TO OR#6. STICKY MATS REQUIRED ON BOTH SIDES OF STAIRWELL DOOR. BOOTIES NOT REQUIRED FOR BACK ACCESS.
AutoCAD SHX Text
STICKY MATS
AutoCAD SHX Text ANY MATERIALS FROM DEMOLITION OR NEW, CAN BE TRANSPORTED THROUGH THE CLEAN CORRIDOR BY ARRANGING PASSAGE WITH COR AND OR STAFF. CARTS MUST BE COVERED THROUGH CLEAN CORRIDOR. WORKERS MUST GOWN UP. VA WILL PROVIDE BOOTIES, CAP AND SUIT AT FRONT DOOR. CORRIDOR MUST BE CLEANED AFTER EACH USE. VA WILL PROVIDE PADLOCK WITH CONSTRUCTION CORE.
AutoCAD SHX Text
STICKY MATS
AutoCAD SHX Text
NEGATIVE AIR MACHINE
AutoCAD SHX Text
NEGATIVE AIR MACHINE
AutoCAD SHX Text
LOCKABLE DOOR
AutoCAD SHX Text
HARD BARRIER
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .