Skytron Freedom Boom Pre-Install Guide.pdf

PDF 956 KB Posted

Attached to
Z1DA--CSI Site Prep Angio 0R-6 506-CSI-113
Solicitation number
36C25021B0022
Issued by

About this file

This announcement provides details for an upcoming construction project solicitation by the Department of Veterans Affairs. The solicitation will be for construction services to reconfigure operating room space at the VA Medical Center in Ann Arbor, Michigan to accommodate new medical equipment. Work will include site preparation of floors, walls, ceilings and utilities. Bidders must contact the medical equipment vendor for coordination. The contractor will be responsible for ensuring site readiness for equipment installation. The solicitation will be issued on March 9th via SAM.gov as a 100% SDVOSB set-aside. The project is valued between $1-2 million. The contractor will have 180 days to complete the work. Responses are due as specified in the solicitation. Award is expected within 180 days of bid receipt.

View the file

Other files

File Type Posted
36C25021B0022 0003.docx DOCX document
Q-52148 VA Ann Arbor Hybrid OR 6 Skytron Surgical Lights Booms and Integration Quote with Tax.pdf PDF
041621VA VA Ann Arbor Hybrid OR 6 SLD AirFRAME Modular Ceiling System Quote with Tax.pdf PDF
36C25021B0022 0002.docx DOCX document
041621VA VA Ann Arbor Hybrid OR 6 SLD AirFRAME Modular Ceiling System Quote.pdf PDF
Q-52148 VA Ann Arbor Hybrid OR 6 Skytron Surgical Lights Booms and Integration Quote.pdf PDF
Wage determination MI20210100 2-26-2021.pdf PDF
190103 VA Ann Arbor SLD AirFRAME Submittal Layout.pdf PDF
19-354 VA Ann Arbor Hybrid OR 6 Subs Rev1 2-23-2021 (1).pdf PDF
SLD Indigo Clean Light Fixture Cut Sheets.pdf PDF
36C25021B0022 0001.docx DOCX document
5th floor ICRA plan.pdf PDF
VHA Directive 1192.01, Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
Skytron and SLD Additional Critical Scope of Work Details.pdf PDF
2021 SLD Installation Guide.pdf PDF
Skytron LINX 300 Integration Pre-Installation Manual.pdf PDF
36C25021B0022_1.docx DOCX document
J-A Attachment Skytron Booms 506-CSI-113 (3-11-21).pdf PDF
Contractor EMR Certification Form 2021 - 506-CSI-113.pdf PDF
Wage Determination MI20210100 2-8-2021.pdf PDF
J-A Attachments SLD Air Frame 506-CSI-113 (3-11-21).pdf PDF
Drawings 506-CSI-113.pdf PDF
J-A Attachment Skytron Lights 506-CSI-113 (3-11-21).pdf PDF
Specifications 506-CSI-113.pdf PDF
REQUEST FOR INFORMATION (RFI) Form 506-CSI-113.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEC-H-0128 REV1

03/12/2021

Read this manual before starting installation! This information is necessary for the safe and efficient operation of the equipment.

PRE-INSTALLATION INSTRUCTIONS

freedom

FREEDOM

FREEDOM SERIES BOOMS

MANUFACTURED BY:

IHB Operations Ceintuurbaan 15 B2 8022 AW Zwolle Netherlands

DISTRIBUTED BY:

US - Skytron 5085 Corporate Exchange Blvd. S.E.

Grand Rapids, MI 49512 (616) 656-2900 www.Skytron.com

The base language for this document is ENGLISH. Any translations must be from the base language document.

Printed copies are not controlled documents.

Although current at the time of publication, Skytron's policy of continuous development makes this manual subject to change without notice. If current manuals are required, contact your local Skytron representative or contact SKYTRON® directly at the distribution address listed above.

Page B

FREEDOM SERIES PRE-INSTAL • REV1

SECTION 1. FOREWORD

1-1. Special User Attention

SECTION 2. INTRODUCTION

2-1. Safety Precautions 2-2. Skytron Supplied Components

2-2-1. Installation Kit 2-2-2. Electrical Enclosure for Elevation Arm 2-2-3. Fasteners

2-3. Customer Supplied Components and Responsibilities 2-3-1. Mounting Structure - Architect and Structural Engineer 2-3-2. Electrical Provisions - Electrical Engineer 2-3-3. Medical Gas Provisions - Medical Gas/Piping Engineer 2-3-4. Interstitial Shroud 2-3-5. Communications Provisions - Communication/Video/Data Engineer 2-3-6. Testing

SECTION 3. MOUNTING STRUCTURE SCHEMATICS

3-1. Standard Mounting

SECTION 4. STRUCTURAL REQUIREMENTS

4-1. Mounting Structure Components 4-2. Mounting Structure Design 4-3. Mounting Structure Design Schematic

SECTION 5. ELECTRICAL REQUIREMENTS

SECTION 6. COMMUNICATIONS REQUIREMENTS

SECTION 7. MEDICAL GAS REQUIREMENTS

7-1. Recommended Gas Riser Placement 7-2. Site Specific Gas Details

SECTION 8. MOUNTING STRUCTURE TESTING

8-1. Recommended Tools 8-2. Mounting Structure Test Jig 8-3. Load Simulator Weight Matrix

SECTION 9. REVISION HISTORY

FREEDOM SERIES PRE-INSTALL • REV1

TABLE OF CONTENTS

TITLE PAGE

SECTION 1. FOREWORD

1-1. Special User Attention Skytron’s objective is to provide a program and guideline to assist individuals (hospital owners, architects, structural engineers) responsible for the design of mounting structures.

The mounting structure of a Skytron fixture should always be considered the most important detail of any project prior to installation. Skytron’s ceiling mounted systems depend upon properly designed and installed mounting structures to deliver years of dependable, service-free performance.

We realize that individual mounting structures vary in design due to unique structural requirements, physical obstructions, structural member availability and room layout limitations, to name a few.

The mounting structure design in this Mounting Structure Guideline Booklet is a successful, proven design. The design consists of a welded, “flanged tube” assembly combined with (4) angled sway braces (“kickers”). A structural steel tube combined with welded steel plates on each end facilitate its attachment to the structural ceiling and provide an attachment point for the Skytron fixture. This is a simple effective design that is forgiving to restricting structural conditions that are usually encountered during fabrication.

This design also eliminates “guess work” by the steel fabricator when compared to structures that are fabricated on site with angle iron. In many cases the “flanged tube” assembly can be pre-fabricated reducing the on-site construction time and eliminating the need to correct structural problems associated with angle iron structures.

The process of building a proper mounting structure can be complemented with Skytron’s continued support on the project. Once the structures are fabricated, Skytron will perform a visual inspection and on-site consultation followed by an actual performance test. The performance test of the structure essentially involves hanging a “test jig” from the structure, and then measuring the amount of rotation that occurs at the mounting plate using an inclinometer (digital level). The test jig is similar in size, shape, and weight to a Freedom boom. Once the test jig is installed and the proper weights have been added to simulate the product’s moment load, a reading is taken on the digital level to verify that there is no more deflection than is stated in section "8-3.

Load Simulator Weight Matrix" on page 13 on the mounting plate when the specified load is applied.

Rotation of the mounting plate causes the radial arm(s) to become out of level and to drift. For a structure to meet Skytron specifications, we require that the mounting plate does not have any more deflection than is stated in section "8-3. Load Simulator Weight Matrix" on page 13 .

The testing process should occur in the early stages of construction to provide optimal time if additional reinforcement is needed on the structure. This should be performed prior to the completion of the finished ceiling.

Skytron’s program is available to help you and provide you with the necessary counseling. However, the final responsibility to insure that the structure is adequate and meets specification lies with the structural engineer and the contractor for the project.

Our support services are geared to minimize the effort on all parties involved and to insure a successful product installation.

This Mounting Structure is applicable for all SKYTRON® Freedom boom models.

We recognize that not all situations will permit the use of this “Tube Structure”. Please contact Skytron with your special needs so that we may be able to guide you to other alternatives.

SECTION 2. INTRODUCTION

Simulation testing on all Freedom booms must be performed by an authorized Skytron representative ONLY.

Testing weight and moment load on Freedom booms is hazardous work. It is important to use proper Personal Protection Equipment (PPE) and adhere to OSHA (Occupational Safety and Health Administration) for materials handling and storage for the safe equipment used in hoists and with slings.

CAUTION

CAUTION with safety alert symbol indicates a hazardous situation that, if not avoided, could result in minor or moderate injury.

CAUTION

CAUTION without the safety alert symbol, is used to address practices not related to personal injury but with a possibility of damage to equipment.

Check valves must be removed during brazing to prevent damage to O-rings. Check valves come in two different lengths. Keep Instrument Air and Oxygen separate from the others (Figure 2).

NOTICE

Indicates important information not related to personal injury.

2-2. Skytron Supplied Components Skytron supplies some components to assist in the design and construction of the mounting structure:

2-2-1. Installation Kit Skytron provides an installation kit which can be shipped in advance and contains all of the Skytron supplied components required for pre-installation and the fabrication of the Freedom boom mounting structure. The Installation Kit includes the following:

■ Customer approved room layout and Freedom boom configuration drawings

■ Freedom boom mounting plate

■ Medical gas riser plate with appropriate medical gas connectors

■ Check valve removal tool

■ Electrical junction box

This publication is meant to provide the information needed to design and build a mounting structure that will provide the proper support for a SKYTRON®

Freedom boom fixture as well as the guidance for supplying the necessary services.

The responsibilities and items supplied by both Skytron and the Customer for pre-installation of the fixture will vary depending on the equipment and services that will be provided on the Freedom boom fixture. The mounting structure requirements however, are the same for all models. The structure design is based on the heaviest Freedom boom model with the greatest moment load. By using this criteria, one structure design can be utilized to minimize design costs and provide adequate support for future modifications. If applicable, specific Seismic Calculations can be provided from Skytron.

The Mounting Structure design should always be approved by a Structural Engineer. An inadequate Mounting Structure may allow drifting and other performance problems for the fixture. Equipment warranty or service charges due to an inadequate Mounting Structure are at the customer’s expense.

Skytron does not warrant or certify superstructure designs.

If the optional Interstitial Shroud is applicable, please refer to document TEC-H-0129 for additional pre-installation requirements.

This publication is intended to address various areas and responsibilities of multiple individuals. It is important that this information is shared with:

■ Architects and Structural Engineer

■ Electrical Engineer

■ Medical Gas/Piping Engineer

■ Communication/Video/Data Engineer

■ Project Manager(s)

2-1. Safety Precautions The following is a summary of WARNINGS and CAUTIONS indicated in this manual. These precautions are found throughout the manual where they are applicable. Carefully read the manual before proceeding with installation.

WARNING

WARNING with the safety alert symbol, is used to indicate a hazardous situation that, if not avoided, could result in death or serious injury.

FREEDOM SERIES PRE-INSTALL • REV1

2-2-2. Electrical Enclosure for Elevation Arm An 8" x 6" x 4" electrical enclosure (shipped with the product), is remote mounted by others and must be located within 24" of the mounting structure.

2-2-3. Fasteners

■ (6) 1-1/4” x 10” Threaded Rods or (6) 7/8" x 10" Threaded Rods (shipped with the product).

2-3. Customer Supplied Components and Responsibilities 2-3-1. Mounting Structure - Architect and Structural Engineer The Customer is responsible for the design and fabrication of the structure which connects the SKYTRON® mounting plate to the structural ceiling.

The mounting plate must be perfectly level (±0.1°).

The design and fabrication must include the necessary bracing to prevent twisting or lateral motion and to allow no more deflection than is stated in section "8-3.

Load Simulator Weight Matrix" on page 13 at the mounting plate when the specified load is applied.

Refer to Page 5 for recommended specifications.

An inadequate mounting structure can result in damage to the equipment. Equipment warranty charges related to an inadequate structure design or installation are at the customers expense. The mounting structure design specifications included in this publication depict an example structure. The actual building design, additional loading required by local building codes and various obstacles may exist that do not allow this design system to be followed.

It is the customer’s responsibility to provide the appropriate alternate mounting structure. Skytron recommends that a Structural Engineer be consulted whenever a design variation is needed.

2-3-2. Electrical Provisions - Electrical Engineer Each Freedom boom is fabricated in accordance to the specifications required by the customer. The customer is responsible for the appropriate electrical supply to the fixture. The configuration drawings supplied by Skytron will indicate the type and quantity of circuits required. The customer is responsible for connections from facility supply to fixture, wall control and wiring installation for surgical lights and electrical enclosure for elevation arm connection if applicable. Refer to SECTION 5 on page 8 for Electrical Requirements.

2-3-3. Medical Gas Provisions - Medical Gas/ Piping Engineer Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer (to include the type of faceplate connectors to be provided on the carrier). The customer is responsible for the appropriate medical gas supply and connection to the fixture. The Configuration drawings supplied by Skytron will indicate the type and quantity of gas supply lines required. Refer to SECTION 7 on page 10 for Medical Gas Requirements.

2-3-4. Interstitial Shroud If the optional Interstitial Shroud is applicable, refer to document TEC-H-0129 for additional pre-installation requirements.

2-3-5. Communications Provisions - Communication/Video/Data Engineer Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer. The customer is responsible for the appropriate communication cable routing to the fixture. The Configuration drawings supplied by Skytron will indicate the type and quantity of cables required. Refer to Page 7 for Communications Requirements.

2-3-6. Testing A visual review of the mounting structure construction should be requested before the finished ceiling is installed to detect possible interference potentials, and arrangements can be made to conduct a load simulation using a Test Jig. This process is designed to simulate the fixture load and is an effective means to determine where the structure may require improvement. It is not a certification of the structure.

NOTICE

The customer is responsible for testing and certification requirements for all system utilities prior to the installation. If the structure does not pass initial testing, the customer will be responsible for additional re-testing.

The testing and certification must be in accordance with all state, federal, local, NFPA and NEC codes and must include the following items:

■ Mounting Structure (Testing done by Skytron)

■ Electrical Wiring

■ Medical Gas Supply

SECTION 3. MOUNTING STRUCTURE SCHEMATICS

3-1. Standard Mounting

STRUCTURAL

CEILING PLATE

17" DIA x 1"

12" MIN/60" MAX

EXPANSION ANCHORS:

HILTI KB-III (ICBO 4627)

CARBON STEEL

STRUCTURAL

CEILING

FINISHED CEILING

STRUCTURAL

CEILING

MOUNTING PLATE

(SKYTRON SUPPLIED)

FIXTURE HUB

6" DIA

SUPPORT

TUBE

TYP 1/4"

TOP & BOTTOM

TYP 1/4"

PJP

45°-60°

STRUCTURAL CONCRETE SLAB, NORMAL WEIGHT fc = 3000 PSI (20,684 kPa)

20"

DIAMETER OPENING REQUIRED

(CENTERED UNDER MOUNT)

23.6"

CEILING COVER (SKYTRON SUPPLIED)

ACCESS DOOR 24" X 24"

(REQUIRED)

* CRITICAL DIMENSION

12” HIGH CLEAR

SPACE ABOVE

MOUNTING PLATE

REQUIRED ON

3 SIDES FOR

GAS AND

ELECTRICAL

COMPONENT

INSTALLATION

1.00˝

1.50˝

Ø10.63˝1.50˝

Pocket .5˝ W x 2˝ L x .04˝ Dp

Ø1.00˝ (4 places)

1.00˝

1.00˝

0.25˝

9.75˝

9.75˝

9.50˝

9.50˝

9.00˝

23.6˝ CEILING COVER

(REFERENCE)

9.00˝

17.50˝

4.25˝ 4.25˝

4.25˝

4.25˝

0.25˝

Ø6.00˝ +0.03˝

- 0.01˝

R0.50˝ .25-20 thru (16 places)

Ø1.31˝ (6 places)

Ø1.02˝ (6 places)

60° (6 places)

60° (6 places)

NOTICE: This illustration depicts a recommended mounting structure design and its components.

Always consult specific structural criteria defined by a structural engineer.

NOTICE: Do not cover or block any holes with sway bracing, gussets, weld, or weld slag.

NOTICE: Dimensions shown are typical unless otherwise stated. Refer to specific structural drawings and/or seismic drawings for each application.

SWAY BRACING

3"x 3"x 1/4"

(4)

* REFER TO SITE SPECIFIC

ELEVATION PAGE

SECTION 4. STRUCTURAL REQUIREMENTS

4-1. Mounting Structure Components The fabrication of each mounting structure may be slightly different but they each require the same basic components to ensure stability. Refer to Figure 1 on page 7 for the relationship of these components.

Sway Bracing (by others) Sway bracing is designed to rigidly affix the Mounting Plate to the structural ceiling. The primary purpose of Sway Bracing is to eliminate sway, or lateral twisting and flexing of the mounting structure as it “reacts” to dynamic load changes caused by moving the fixture radial arms. The sway bracing should be welded to the Mounting Plate and extend away from the center of the mount. A minimum of four sway braces placed 90° apart at a 45° to 60° angle is recommended.

Minimum recommended material for sway bracing is 3” x 3” x 1/4” angle iron. It is recommended that in all applications that the sway bracing be fastened to the structural ceiling.

Structural Ceiling Plate (by others) The Structural Ceiling Plate rigidly attaches the mount to the Structural Ceiling using structural anchors appropriate for the ceiling construction. The structural ceiling plate should be a minimum of 1” thick ASTM A36 steel plate with the appropriate mounting holes size and spacing.

Expansion Anchors Test 50% of the anchors at 2000 pounds (907 kg) tension, or 50 ft. lbs. (68 N•m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:

1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleeve type anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.

2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.

Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testing laboratory in accordance with standard recognized procedures.

Support Tube (by others) The Support Tube required to attach the Mounting Plate to the Structural Ceiling Plate is ASTM 500 Grade B, 6” outer diameter tube. Support Tube is to be welded to Structural Ceiling Plate and Mounting Plate. A minimum of 6 gussets placed 60° apart should be welded to the support tube at the structural ceiling plate and the Mounting Plate.

Mounting Plate (Skytron supplied) The 17.5” x 17.5” x 1” ASTM A36 steel Mounting Plate is a Skytron supplied item. The Support Tube and Sway Bracing are welded to the Mounting Plate.

The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides the mounting areas for the junction box and gas riser plates.

4-2. Mounting Structure Design Seismic structural applications differ. Please contact your local Skytron distributor for specific calculations.

NOTICE

The mounting structure must be designed and fabricated to position the bottom of the SKYTRON® Mounting Plate as shown on the site specific elevation page.

The bottom of the mounting plate location is a critical dimension to accommodate the proper clearance required for ceiling cover function. The mounting plate must be perfectly level (±0.1°) and allow no more deflection than is stated in section 8-3 on page 13 at the mounting plate when the specified load is applied.

NOTICE

The mounting structure must be tested for strength and stiffness prior to installation of the fixture.

A Test Jig is available from Skytron that includes all components and documentation required for performing an approved Mounting Structure test.

Refer to SECTION 8 on page 12 for testing procedures.

NOTICE

Please consult your Skytron representative during early stages of construction to facilitate this process. The testing process is a required documented function prior to closing of the finished ceiling.

Ceiling Requirements A 24” x 24” access door must be mounted adjacent to the mounting structure for entry by service personnel for service access.

Skytron provides a ceiling cover designed to fit the ceiling cutout see "3-1. Standard Mounting" on page 5.

4-3. Mounting Structure Design Schematic

NOTICE

Figure 1 below depicts a typical mounting structure design and its components. Always consult specific structural criteria defined by a structural engineer. Mounting bolts and nuts are shipped with the fixture.

SWAY BRACING

SUPPORT TUBE

MOUNTING PLATE

(SKYTYRON SUPPLIED)

THREADED ROD

GAS INLET

FIXTURE HUB

*NOTE:

STRUCTURAL CEILING

PLATE (BY OTHERS)

NOT SHOWN

JUNCTION BOX

(SKYTYRON SUPPLIED)

JUNCTION BOX

MOUNTING

BRACKET

GAS RISER PLATE

(MUST BE TOP MOUNTED)

Figure 1. Mounting Structure

SECTION 5. ELECTRICAL REQUIREMENTS

Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.

The configuration drawings supplied by Skytron will indicate the type and quantity of circuits required.

Skytron provides all fixture wiring and electrical materials for connection from the fixture to the facility provided supply.

Skytron supplies an electrical junction box to facilitate field wiring, with an optional partition for critical and normal power (if applicable), for up to six circuits to be mounted on the mounting plate in the correct position (Figure 1).

If the boom is equipped with the Active Assist system, it will require either a separate circuit (120V, 0.5A draw) OR if tied into another circuit, a DPST disconnect switch to isolate it, should service be required.

If a motorized height adjustable arm is utilized, a Skytron provided enclosure/junction box (8"L x 6"W x 4"H) must be remotely mounted within 24" of the mounting structure (by the contractor). Either this remote enclosure will require a separate circuit (120V 2.5A draw) OR if tied into another circuit, it will require a DPST disconnect switch to isolate it, should service be required.

Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit.

Any electrical material and labor required for connection to the Skytron fixture and or electrical enclosure is to be provided by the contractor or customer. All wiring and materials are to be in accordance with federal, state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area based on the customer specific drawing.

NOTICE

If the optional Interstitial Shroud is applicable, refer to document TEC-H-0129 for additional pre-installation requirements.

SECTION 6. COMMUNICATIONS REQUIREMENTS

Each Freedom boom fixture is fabricated in accordance to the specifications required by the customer.

The configuration drawings supplied by Skytron will indicate the type and quantity of cables required.

The customer is responsible for the appropriate communication cable routing to the fixture. Special arrangements can be coordinated for custom cable sets to be installed at the time of installation. Contact your Skytron representative.

NOTICE

If the optional Interstitial Shroud is applicable, refer to document TEC-H-0129 for additional pre-installation requirements.

SECTION 7. MEDICAL GAS REQUIREMENTS

Medical gas outlets are typically manufactured by Beacon Medaes unless noted on the Skytron shop drawings. Outlets produced by another manufacturer could vary in price and lead time. Skytron has the right to switch to another manufacturer if needed.

NOTICE

Medical gas riser plates comply with NFPA.

Cleanliness of gas outlets must be maintained through installation. Purge gas lines and test at least 24 hours prior to installation. Test results must be made available to Skytron for verification & comparison.

CAUTION

Check valves must be removed during brazing to prevent damage to O-rings. Check valves come in two different lengths. Keep Instrument Air and Oxygen separate from the others (Figure 2).

1.18”

9”

1.10”

USE FOR:

INSTRUMENT AIR

OXYGEN

USE FOR:

MEDICAL AIR

CARBON DIOXIDE

HELIOX

NITROUS OXIDE

NITROGEN

VACUUM

WAGD

DISS CONNECTOR

(WITH REMOVABLE PRIMARY

CHECK. PASSIVE EVAC,

VACUUM & WAGED DO NOT

HAVE PRIMARY CHECK.)

CHECK VALVE

REPLACEMENT

TOOL

M E D I C A L

G A S

• TYPE K COPPER

TUBING

• 1/2" O.D. EXCEPT

PASSIVE EVAC

• 3/4" O.D. FOR PASSIVE

EVAC

VALVES

Figure 2. Check Valves

Each Freedom boom fixture is fabricated in accordance with the specifications required by the customer.

The configuration drawings supplied by Skytron will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture to the riser plate connectors. The customer is responsible for delivering the appropriate medical gas from the facility supply to the riser plate connectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flow restrictions associated with conventional construction methods i.e. flex gas hoses.

Skytron provides medical gas riser plate(s) and the appropriate connectors for attachment to the mounting plate. The riser plate(s) must be top mounted to the mounting plate and will accommodate up to six gas connections on each plate. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2” copper tube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures. If more than 12 gas connections are required, the contractor will need to remotely mount additional riser plates.

All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12 requirements.

7-1. Recommended Gas Riser Placement

NOTICE

If the optional Interstitial Shroud is applicable, refer to document TEC-H-0129 for additional pre-installation requirements.

A six inch clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished at the mounting plate, then horizontal or remote mounting of the riser plate will be required (by the contractor). When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacent to wall. If more than one riser plate is required they should be placed next to each other.

7-2. Site Specific Gas Details

Test Gas

CGA Color Standard

ISO Color Standard

Abbreviated Name

Standard Pressure

Max Pressure

Allowable Pressure

Drop

Minimum Flow Rates

See Note

N2NF Medical Air (Yellow)

Medical Air (Black) MedAir 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet

(100NL/min) #1, 5

N2NF Carbon Dioxide (Gray)

Carbon Dioxide (Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet

(100NL/min) #5

N2NF Heliox (Brown)

Heliox (Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet

(100NL/min) #5

N2NF Nitrogen (Black)

Nitrogen (Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig

5 SCFM per outlet (140NL/min) N2NF free air per outlet

#4, 5

N2NF Nitrous Oxide (Blue)

Nitrous Oxide (Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet

(100NL/min) #5

N2NF Oxygen (Green)

Oxygen (White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet

(100NL/min) #1

Vacuum (White)

Vacuum (Yellow) MedVac 12in/Hg

(300mm) N/A 3 SCFM per outlet (85NL/min) #2

Waste Anesthetic Gas Disposal

(Purple)

Waste Anesthetic Gas Disposal

(Purple) WAGD Varies with system type

At a minimum, each inlet must be able to draw a continuous 50 lpm (1.8 SCFM) through the interface

#3

Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of: 170 LPM (6 SCFM) for 3 seconds at the station outlet.

Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not less than 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S.

connectors omit primary check valves for optimal flow). 12in/HG.

Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as the MedVac inlets.

Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogen control systems in order to avoid loss of flow capability.

Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses through various components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required values.

Additional references: NFPA 99 Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5

CAN-CSA Section 7.3.2. Z 7396.1-12

Test Gas

CGA Color Standard

ISO Color Standard

Abbreviated Name

Standard Pressure

Max Pressure

Allowable Pressure

Drop

Minimum Flow Rates

See Note

N2NF Nitrogen (Black)

Nitrogen (Black) N2 or HPN2 10 psi

[70kpa]

14.1 SCFM (400L/

min) @ 1,250 kpa

N2NF Vacuum (White)

Vacuum (Yellow) MedVac 4 inhg

[13 kpa]

1.1 SCFM (30L/min)

@ 54 kpa

N2NF Other Gas Various MedVac 4 psi [28kpa]

4.2 SCFM (120L/

min) @ 345 kpa

SECTION 8. MOUNTING STRUCTURE TESTING

Each mounting structure must be tested by a Skytron representative to verify there is no more deflection than is stated in section "8-3. Load Simulator Weight Matrix" on page 13 of rotational movement at the mounting plate prior to installing a fixture. A mounting structure test Jig is available from Skytron to facilitate this process. The mounting structure test Jig is a fixture that simulates the weights and moment loads created by the SKYTRON® fixture. It consists of a hub assembly, an upper and lower radial arm, a chain fall, weight support tube and six 100 pound weights (Figure 3).

The drawing package and the test jig instructions are required to perform an accurate test.

The test jig instructions include the load simulator weight chart, the test jig report form and complete instructions for performing the test.

8-1. Recommended Tools

■ Ladder(s)

■ 19mm Socket (3/8” Drive) or 19mm wrench

■ Genie Lift / Overhead Hoist

■ 3/8” Drive Ratchet

■ Two 1-7/8” wrenches

■ Two or more people capable of lifting 100 lbs.

■ Appropriate cart

■ 12mm Socket

■ Modified wrench for 7/8" rods

■ Digi-Pas® DWL 1300XY 2-Axis level or equivalent

8-2. Mounting Structure Test Jig

WEIGHT

SUPPORT TUBE

3/8” HITCH PIN

CHAIN

CHAIN FALL

CHAIN

LOWER RADIAL ARM

UPPER RADIAL ARM

WEIGHTS (6)

MOUNTING HUB

ASSEMBLY

12mm NUT (6)

12 mm x 30mm BOLT (4)

12mm NUT (4)

5/8” NUT (2)

1-1/4” THREADED ROD (6)

1-1/4” NUTS

Figure 3. Mounting Structure Test Jig

8-3. Load Simulator Weight Matrix

WARNING

Simulation testing on all Freedom booms must be performed by an authorized Skytron representative ONLY.

WARNING

Testing weight and moment load on Freedom booms is hazardous work. It is important to use proper Personal Protection Equipment (PPE) and adhere to OSHA (Occupational Safety and Health Administration) for materials handling and storage for the safe equipment used in hoists and with slings.

The Skytron weight and moment load simulator is a device which simulates the moment load on an actual ceiling mounted articulating fixture in order to test the weight bearing capacity and performance of the Freedom mounting structure.

Skytron recommends using a 600lb [272kg] maximum load simulator to test all mounting structure systems for maximum load and weight capacity.

Load simulation is an essential part of readiness assessment and provides reassurance the mounting structure can accept larger more complex articulating systems if the need arises for equipment changes or future expansion.

In the event that the mounting structure system cannot deliver performance for the maximum load, the weight matrix provided below provides lesser fixture weight and moment load as a means to ensure that the minimum criteria is met.

SERIES NUMBER FIXTURE WEIGHT

lbs. [Kg]

MOMENT LOAD

ft. lbs. [Nm]

TEST WEIGHTS

lbs. [Kg]

MAX DEFLECTION

dgr.

F110 Low duty single 487 [721] 2570 [3485] 200 lbs [91 kg] 0.18º F120 Low duty double 723 [328] 3953 [5360] 300 lbs [136 kg] 0.17º F130 Low duty triple 944 [428] 4296 [5825] 400 lbs [181 kg] 0.16º F10L Stackrotation unit Low Duty 256 [116] 527 [715] 100 lbs [45 kg] 0.36º F20H Stackrotation unit Heavy Duty 930 [422] 2434 [3300] 200 lbs [91 kg] 0.18º F200 Single Q1 538 [244] 2581 [3500] 200 lbs [91 kg] 0.18º F310 Heavy duty single 990 [449] 5539 [7510] 400 lbs [181 kg] 0.16º F320 Heavy duty + Single low duty 1188 [539] 6922 [9385] 500 lbs [227 kg] 0.16º F330 Heavy duty + Double low duty 1387 [629] 8165 [11070] 600 lbs [272 kg] 0.16º F340 Heavy duty + Heavy tandem 1673 [759] 8829 [11970] 600 lbs [272 kg] 0.15º F350 Heavy duty + Heavy tandem + Low duty 1598 [725] 8851 [12000] 600 lbs [272 kg] 0.15º F410 Heavy duty double 941 [427] 5399 [7320] 400 lbs [181 kg] 0.16º F420 Heavy duty double + Low duty 1188 [539] 6645 [9010] 500 lbs [227 kg] 0.16º F440 Heavy duty double + Heavy tandem 1574 [714] 8334 [11300] 600 lbs [272 kg] 0.16º

For detailed instructions on test methodology see Freedom Test Jig Instructions (TEC-H-0132).

SECTION 9. REVISION HISTORY

Date Revision Revision History 01/29/2021 0 Initial release.

03/12/2021 1

Pg 4, 8, 12 added coss referance to the Load Simulator Weight Matrix, removed previous defleciton Pg 8 Added electrical requirements for the active assist system Pg 13 Added referece to mounting strucutre text jig instructions