041621VA VA Ann Arbor Hybrid OR 6 SLD AirFRAME Modular Ceiling System Quote.pdf
PDF 174 KB Posted
- Attached to
- Z1DA--CSI Site Prep Angio 0R-6 506-CSI-113
- Solicitation number
- 36C25021B0022
About this file
This document contains a federal contract opportunity solicitation and a related quote for medical equipment and installation services. The solicitation is for construction project number 506-CSI-113 at the VA Medical Center in Ann Arbor, Michigan to reconfigure operating room number six for new medical equipment. The project scope includes site preparation work such as floors, walls, ceilings and utilities. The contractor will be responsible for ensuring site readiness and will have 180 days to complete the work. The opportunity is reserved for service-disabled veteran-owned small businesses and has an estimated value between $1-2 million. The related quote is from Stevens Moon to the VA Ann Arbor for an AirFRAME modular ceiling system with integrated lighting fixtures, installation services, and optional HEPA filters and extended warranty. The total equipment and installation cost is $253,652.25 with payment terms of 40% down, 40% upon receipt, and 20% upon completion.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To:
Hospital: VA Ann Arbor nickmoon@stevensmoon.com Address: 2215 Fuller Rd. Date: April 16, 2021
Ann Arbor, MI 48105 Quote #: 041621VA
Email: Customer ID: VA Ann Arbor
Phone: Expiration Date: May 16, 2021
Salesperson Department Shipping Method Shipping Terms Delivery Date Payment Terms Due Date
Nick Moon FOB Freight PPD & ADD 40/40/20
Please send all Purchase Orders to orders@stevensmoon.com Qty Item # Description Unit Price Line Total
Design 190103 VA Ann Arbor Hybrid OR 6
1 AFHybrid AirFRAME Modular Ceiling System with Integrated Indigo Clean Fixtures¹
$232,202.25 $232,202.25)
¹Perimeter Indigo Clean Light Fixtures, Controller, Sensors Included
1 SMAINSTALL Certified Stevens Moon Installation² $21,450.00 $21,450.00)
²Stevens Moon Installation includes all required mounting hardware
Includes no-charge project management services and unlimited onsite planning
Installation of perimeter Indigo Clean fixtures, sensors and controller by others
Structural anchor locations and lateral bracing by others
Equipment and Installation Total $253,652.25)
Optional Items
1 HEPA Add Optional HEPA Filters *Class 3 Imaging Rooms* $5,606.25 $5,606.25)
1 10YREXT Add Optional 10 Year Extended Warranty $8,076.60 $8,076.60)
1 Freight Freight Services $13,216.00 $13,216.00)
Subtotal Equipment and Installation Only $253,652.25
This is a quotation on the goods, named, subject to the conditions noted below: Freight $13,216.00)
*FOB Freight is pre-paid and add Sales Tax $0.00 *Quoted prices are good for 30 days Total Equipment Only $266,868.25
*Payment terms 40% downpayment, 40% upon receipt and 20% upon completion of job
File details come from the government source that posted it. Updated .