A0002_HSHQDN-17-R-0002_SF30-16a.pdf

PDF 622 KB Posted

Attached to
FINAL RFP HSHQDN-17-R-0002 DNDO RPM RP
Solicitation number
DRAFT_RFP_HSHQDN-17-R-000XX_RPM-RP
Issued by

About this file

A0002 SF30

View the file

Other files

File Type Posted
A0003_HSHQDN-17-R-0002_SF30.pdf PDF
Final-Version-VendorQuestionsAndAnswers_2_24_17.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_02-Statement_of_Requirements-2017_02_23.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_10-Bailment_Agreement-2017-01-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_04-RFP_Questions_Form-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_18-Quarterly_Report_Template-2017-1-19.xlsx XLSX spreadsheet
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_09-Maintenance_Past_Performance_Questionnaire-2017-1-27.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_02-Statement_of_Requirements-2017-01-30.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_05-System_Architecture_Update_Plan-2017-1-27.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_01-IDIQ_Pricing_List-2017-1-27.xlsx XLSX spreadsheet
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-MAIN_DOCUMENT-2017-02-03.pdf PDF
HSHQDN-17-R-0002_A0001_SF30.pdf PDF
Attachment_20_-_Vendor_Q&A.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_08-Delivery_Past_Performance_Questionnaire-2017-1-27.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_05-System_Architecture_Update_Plan-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_19-List_of_Material_Available_Only_from_Contracting_Officer-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_14-PRIDE_ICD-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_17-Configuration_Management_Plan-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_11-C-to-C_Non_Disclosure-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_13-Government_Furnished_Property-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_02-Statement_of_Requirements-2017-01-19.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_06-Maintenance_Plan-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_10-Bailment_Agreement-2017-01-19.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_07-Replay_Tool_Requirements_Checklist-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-000xx_RPM_RP_RFP-Atch_01-IDIQ_Pricing_List-2017-1-19.xlsx XLSX spreadsheet
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_03-Contract_Data_Requirements_List-2017-1-19.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_12-Lifecycle_Support-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-MAIN_DOCUMENT-2017-01-19.pdf PDF
FINAL_HSHQDN-17-R-0002RPM_RP_RFP-Atch_08-Delivery_Past_Performance_Questionnaire-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_16-RPM_Role-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_21-Acquisition_Strategy_Diagram-2017-01-19.pdf PDF
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_15-Benchmarks-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002RPM_RP_RFP-Atch_04-RFP_Questions_Form-2017-1-19.docx DOCX document
FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_09-Maintenance_Past_Performance_Questionnaire-2017-1-19.docx DOCX document
Copy_of_FINAL_HSHQDN-17-R-0002_RPM_RP_RFP-Atch_18-Quarterly_Report_Template-2017-1-19.xlsx XLSX spreadsheet
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch16_RPM_Role.docx DOCX document
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch5_System_Architecture_Update_Plan.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch9_Maintenance_Past_Performance_Questionnaire.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch4_RFP_Questions_Form.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch14_PRIDE_ICD.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch12_Lifecycle_Support.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch3_Contract_Data_Requirements_List.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch1_IDIQ_Pricing_List.xlsx XLSX spreadsheet
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch13_Government_Furnished_Property.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch11_C-to-C_Non_Disclosure.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch2_Statement_Of_Requirements.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch8_Delivery_Past_Performance_Questionnaire.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch15_System_Performance_Statement.pdf PDF
DRAFT_HSHQDC-17-R-000xx_RPM_RP_RFP-2016-10-07_Atch10_Bailment_Agreement.pdf PDF
DRAFT_HSHQDN-17-R-000XX_Attachment_18__Quarterly_Report_Template.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0002 HSHQDN-17-R-0002 SF30-16a topmostSubform[0]:

Page1[0]:

AmendmentNo[0]: A0002

Code[0]:

Code[1]:

AccountingData[0]:

A13[0]:

C13[0]:

D13[0]:

NameandTitleSigner[0]:

NameandTitleOfficer[0]: Tisha Blue, Contracting Officer

Description[0]: The purpose of this amendment to Solicitation HSHQDN-17-R-0002 is to provide the final Q&As submitted by February 8, 2017 and the revised Attachment 2 Statement of Requirements per the responses to the Q&As. See below the changes made to Attachment 2:

- RPM-FR-65-2, changed threshold tolerance from 0.5 to 0.05

- RPM-FR-65-3, changed threshold tolerance from 0.5 to 0.05

FacilityCode[0]:

Code[2]:

IssuedBy[0]: Department of Homeland Security Office of Procurement Operations Domestic Nuclear Detection Office 245 Murray Drive, SW, BLDG 410 Washington, DC 20526

NameandAddress[0]:

AdministeredBy[0]:

ContractIDCode[0]:

ReqNumber[0]:

AmendmentNo[1]: HSHQDN-17-R-0002

ModificationNo[0]:

ProjectNo[0]:

Page[0]: 1

Pages[0]: 1

EffectiveDate[0]: 02/24/2017

Dated9B[0]:

Dated10B[0]:

CheckBox9[0]: 1

CheckBox10[0]: Off

CheckBox11[0]: 1

CheckBox13A[0]: Off

CheckBox13B[0]: Off

CheckBox13C[0]: Off

CheckBox13D[0]: Off

IsNot[0]: Off

Is[0]: 1

Extended[0]: Off

NotExtended[0]: 1

2017-02-24T12:29:20-0500

TISHA L BLUE

DateSigned[0]:

DateSigned[1]: 02/24/2017

Copies[0]: 1

CopiesReturned[0]: 1

HSHQDN-17-R-0002 RPM RP

PAGE 2 0F 2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

- RPM-OR-3, changed “administrative operators” to “managers”

- RPM-OR-15, changed “#6, #6a, and #8” to “RPM-OR-06, RPM-OR-6a and RPM-OR-08”

- RPM-OR-31, changed “#6, #6a, #7, and #8” to “RPM-OR-06, RPM-OR-6a, RPM-OR-07, and RPM-

OR-08”

- RPM-FR-74, changed “The RPM shall be shielded by on the back and sides of the RPM.” to “At minimum the RPM should be shielded on the back and sides by the equivalent of 1 cm steel and

0.64 cm lead when measured using a source producing 1.5 MeV radiation.”

- RPM-FR-158-1, changed “Basic control station” to “Basic control console”

- Header of Appendices 1-4, changed “HSHQDC-17-R-000XX” to “HSHQDN-17-R-0002”

- Appendix 3, Site ID, changed “RPMs” to “ports of entry”

File details come from the government source that posted it. Updated .