Disciplanary Form.pdf

PDF 602 KB Posted

Attached to
Detroit Supply Schedule #11 Single Family Home Repairs
Solicitation number
300000130037297
Issued by
Michigan

About this file

This is a Contractor Suspension & Disbarment Policies document issued by the City of Detroit's Housing and Revitalization Department. The document outlines the infractions and sanctions applicable to contractors on the City's approved contractor list. Contractors may be suspended for specific violations including expiration of licenses or insurance coverage, failure to maintain the City as an additional insured, exceeding construction schedules, contractual violations, failure to submit required final payment documentation, incomplete warranty work, and failure to attend two consecutive Invitations to Bid and Walkthroughs without formal written notice or failure to bid on three consecutive bid solicitations without valid reason. Suspensions result in temporary or permanent removal from the approved contractors list, rescission of awards, and termination of existing contracts.

The Housing and Revitalization Department adheres to federal debarment and suspension guidelines in accordance with 2 CFR Parts 180 and 2424. Any suspected fraud, waste, abuse, or corruption by a contractor will be referred to the City's Office of Inspector General for investigation and appropriate action. The policy requires an authorized representative to sign and acknowledge understanding of these suspension and debarment provisions. The document was revised in April 2019.

View the file

Other files

File Type Posted
185422_4_SUPPLIER.pdf PDF
OCP-HRD FLYER.pdf PDF
HRD_SF_Master_SOW_2024-26.pdf PDF
RFQQ - Detroit Supply Schedule 11 Single Family Home Repairs.pdf PDF
Bid Results Sheet.pdf PDF
Bid Sign In Sheet.pdf PDF
Case Status Summary Report.pdf PDF
Change Order.pdf PDF
Concrete MOU.pdf PDF
Conflict of Interest Policy.pdf PDF
Construction Schedule.pdf PDF
Contractor Application.pdf PDF
Contractor Bid Withdrawal Sheet.pdf PDF
Decline Form.pdf PDF
ER Prices.pdf PDF
Exceed Form.pdf PDF
Fixed Price Inspection Request for Grant Programs.xlsx XLSX spreadsheet
Homeowner Acknowledgement FOrm.pdf PDF
Invitation to Bid Template.pdf PDF
LHR Prices.pdf PDF
Liquidated Damages.pdf PDF
LIRA Request.pdf PDF
Memo For Payment Without Signature.pdf PDF
No Access.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Suspension & Disbarment Policies

Suspension Contractors can be suspended for the following infractions:

• Expiration of licenses

• Expiration of Insurance, failure to list City of Detroit as additional insured

• Exceeding construction schedule specified in contracts or change orders

• Contractual Violations

• Failure to submit all required information in final payments

• Failure to complete warranty work

• Failure to attend two consecutive Invitation's to Bid & Walkthroughs without formal written notice of non-attendance

• Failure to bid on three consecutive bid solicitations without valid reason listed on bid withdraw form

Suspensions result in the following:

• Temporary or Permanent Removal from approved contractor's list

• Rescinded awards and termination of existing contracts

• Other sanctions imposed as required by local, state and federal laws

Debarment The Housing and Revitalization Department will follow federal guidelines for government-wide Debarment and Suspension according to 2 CFR Parts 180 and 2424.

Any occurrence or suspicion of fraud, waste, abuse and/or corruption by a HRD Contractor will be referred to the City's Office of Inspector General (OIG) for review and follow up.

The undersigned authorized representative certifies that they have read and understand the policies set forth by the Housing and Revitalization Department:

Signature of Authorized Representative Date

Revised April 2019 17