Construction Schedule.pdf
PDF 522 KB Posted
- Solicitation number
- 300000130037297
- Issued by
- Michigan
About this file
This is a Construction Schedule template document used for residential construction projects involving lead hazard remediation and housing compliance inspections. The form is designed to track multiple construction trades and activities on a single residential property, including general construction, lead hazard remediation with relocation, electrical work, roofing, gutters and downspouts, concrete work, exterior wall siding, HVAC, porch work, window replacement, plumbing, carpentry, plaster and drywall, flooring, and painting. The schedule requires identification of key project information including the homeowner's name, contractor name and contact details, project address, case number, construction start date, and projected completion date. The document includes designated spaces for relocation dates (from and to), housing compliance inspector sign-off, lead clearance documentation, payment submittals, and final inspection certification.
The template provides a month-by-month tracking mechanism using a calendar grid where contractors and homeowners can document the timing and sequence of each trade item through shading indicators. The form requires signatures from both the contractor and homeowner, along with the housing compliance inspector for verification of completed work stages. This schedule serves as a project management and accountability tool to ensure all required construction activities are completed in sequence and that all regulatory compliance inspections and clearances are obtained before project conclusion.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 x 11 1 1
2 2 2
Contractor Signature Homeowner Signature Date
( "2" key = Shading) ( "1" key = Shading)
Relocation Dates - FROM:
2 1 General ConstructionLead Hazard Remediation with Relocation
Electrical
Relocation (Lead Activity)
TRADE ITEM
Roofing Gutters/Downspouts Concrete Exterior Wall (Siding)
Date DateHousing Compliance Inspector
Lead Clearance Payment Submittal
Carpentry
Final Inspection
Heating Plaster/Drywall
Flooring Painting
CONTRACTOR CONSTRUCTION SCHEDULE
Address:
Construction Start Date:
Homeowner's Name:
HVAC
Porch Window Replacement Plumbing
[MONTH] [MONTH]
Completion Date:
City State Zip:
Housing Compliance Inspector
Program:
Contractor:
Address:
Case #:
Phone #:
ZIP Code:
File details come from the government source that posted it. Updated .