DI-NDTI-81307A.pdf

PDF 20 KB Posted

Attached to
NSN: 2840-01-308-4467NZ P/N: 4070107 Noun: Liner, Augmentor
Solicitation number
SPRTA1-26-R-0124
Issued by

About this file

This Data Item Description (DID) provides guidelines for creating a First Article Qualification Test Plan and Procedures, numbered DI-NDTI-81307A and approved on 21 NOV 2006. The document outlines the requirements for contractors to develop a comprehensive test plan that includes the purpose of testing, applicable documents, description of units to be tested, and detailed test procedures. Key requirements include step-by-step testing procedures, specifications for test equipment and readings, documentation of noncommercial fixtures, and inspection criteria defining minimum performance requirements for government acceptance, with a focus on evaluating worst-case scenarios for power input, signal levels, and timing inputs and outputs.

View the file

Other files

File Type Posted
Transportation-1653.pdf PDF
FA_REPORT.pdf PDF
Qualification Requirement.pdf PDF
FA Test Plan.pdf PDF
SPRTA1-26-R-0124.pdf PDF
DI-NDTI-80809B.pdf PDF
Packaging-158.pdf PDF
IUID.pdf PDF
CDRL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A