FA Test Plan.pdf

PDF 286 KB Posted

Attached to
NSN: 2840-01-308-4467NZ P/N: 4070107 Noun: Liner, Augmentor
Solicitation number
SPRTA1-26-R-0124
Issued by

About this file

This document is a U.S. Air Force Quality Assurance Requirements (LPF-QAR-003) specification for First Article Test Plans and Reports for F100 engine parts. The document provides detailed guidelines for testing first article components, including requirements for dimensional conformance, non-destructive inspections, material properties testing, and visual inspections. Key testing requirements include 100% inspection of all first articles, serialization of parts, use of Pratt & Whitney approved sources, and comprehensive testing procedures covering mechanical, metallurgical, and chemical properties.

The document outlines specific submission requirements for a First Article Test Plan (FATP) and First Article Test Report (FATR), which must be delivered to the Contracting Officer according to contract schedules. All first articles must be new, manufactured under the current contract, and fabricated from materials complying with drawing requirements. Subcontractors must be pre-identified or approved, and all testing must be thoroughly documented, including laboratory test results, photomicrographs, and inspector certifications. Engineering instructions take precedence over other technical instructions.

View the file

Other files

File Type Posted
IUID.pdf PDF
CDRL.pdf PDF
Transportation-1653.pdf PDF
DI-NDTI-81307A.pdf PDF
FA_REPORT.pdf PDF
Qualification Requirement.pdf PDF
SPRTA1-26-R-0124.pdf PDF
DI-NDTI-80809B.pdf PDF
Packaging-158.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .